CIGRE WG C4.24 – Power Quality and EMC Issues associated with future electricity networks WG Composition:  Convener: Francisc Zavoda; Secretary: Sarah.

Slides:



Advertisements
Similar presentations
Federal Aviation Administration International Civil Aviation Organization INFORMATION PAPER AERONAUTICAL COMMUNICATIONS PANEL (ACP) 20th MEETING OF WORKING.
Advertisements

Study Committee Representatives Annual Report December, 2012
JWG A2/B4-28 HVDC Converter Transformers Progress Report Convener: Milan Saravolac IEC SYMPOSIUM DELHI, January 2009.
WG B4.62 Connection of Wind Farms to Weak AC Networks Working Group Meeting – June 2013, ERCOT Office, Taylor, Texas.
CIGRE Paris Session Sunday 24 th – Friday 29 th August, 2014 Monday 25 th … General Assembly Tuesday 26 th … SC A3 meeting Wednesday 27 th AM …
Winnipeg, Manitoba, Cigre Canada Annual Membership meeting, October 19, 2008 CIGRÉ – 2008 Update for SC C6 David Jacobson (C6) Manitoba Hydro.
O.Gjerde WG C2/C5.05 Development and Changes in the Business of System Operators Status report from WG C2/C5.05 Ole Gjerde, Statnett Convenor September.
Study Committee A3 HIGH VOLTAGE EQUIPMENT CIGRE SC A3 meeting in Paris, August 26, 2014 Page No. 1 Working Group Activity Report 2014 JWG A3/B5/C4.37 System.
CIGRE WG C PRACTICES IN INSULATION COORDINATION OF MODERN ELECTRIC POWER SYSTEMS AIMED AT THE REDUCTION OF INSULATION LEVELS WG Composition: WG.
1 AG.03: CIGRE SC A3 Green Book proposal (based on experience of Brazilian NC to publish CIGRE textbooks) CIGRE SC A3 Green Book Project Team Paulo Fernandez.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 5 – Immunity Stephen R Whitesell SC-5 Chair 11/13/2014.
1 60 th CIGRE Technical Committee meeting Paris France, 1 September th informal CIGRE Technical Committee meeting Montreal Canada, 3-4 October 2012.
Chubaka Producciones Presenta :.
1 Study Committee Representatives Annual Meeting October 4, 2009 Toronto SC B4 “HVDC and Power Electronics” Activity Report Presented by: John McNichol.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
State Milestones Subsidized Insurance Workgroup High Level Timeline 2011 Jan 2011 Feb 2011 Mar 2011 Apr 2011 May 2011 Jun 2011 Jul 2011 Aug 2011 Sept 2011.
REPORT TO GRPE 71 ST SESSION EVE IWG 1 Electric Vehicles and the Environment (EVE IWG) Informal document GRPE st GRPE, 8-12 June 2015, agenda.
Amantegui Javier (SP) CIGRE Study Committee B5 1 CIGRE STUDY COMMITTEE B5: MISSION AND CHALLENGES Javier Amantegui (Spain) Chairman of CIGRE-SC-B5 “Protection.
Georgia Electric Membership Corporation Workers’ Compensation Fund November 5, 2013 GEMC Workers’ Compensation Fund Trustee Meeting.
1 Cigre Study Committee C5- Brazilia workshop Market Structures and Institutions RISK MANAGEMENT Svein Storstein Pedersen Convenor of TF C
Final Deadlines for students aiming to graduate in November 2013 April 4th PGR4 submitted to Registry (to approve examiners at next GSB) July 8 th Submission.
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.32 AR 2014Page No.: 1 Activity Report 2014 WG A3.32 Non Intrusive methods.
PagedatoForfatter - Titel1. pagedatoForfatter - Titel2 How to help NC in working towards network for the future  Based on dialogue with the Danish NC.
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.24 AR 2014Page No.: 1 Activity Report 2014 WG A3.24 Tools for Simulating Internal.
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A Page No.: 1 Activity Report 2014 WG A3.33 Experience with equipment.
1 Study Committee Representatives Annual Meeting October 19, 2008 Winnipeg SC B4 “HVDC and Power Electronics” Activity Report Presented by: John McNichol.
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.27 AR 2014Page No.: 1 Activity Report 2013 WG A3.27 The Impact of the Application.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
CISPR/TC77 Joint Task Force Activity Update ACEC meeting in Paris, June 2006 Prepared by Donald N. Heirman Chairman CISPR Subcommittee A.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
CIGRE TF C5-2-1: Classification of Electricity Markets Worldwide
CIGRE WG C4.503 – Numerical techniques for the computation of power systems, from steady- state to switching transients WG Composition:  Jean Mahseredjian.
August 22nd/23rd 2014 WG B3.32 Saving through Optimized Maintenance in Air Insulated Substations 2014 Session – Paris, France.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
TEMPORAL VISUALIZATION OF DATA FROM THE FRENCH SENTINEL NETWORK.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
CIGRE JWG A2/C4.52 – High-Frequency Transformer and Reactor Models for Network Studies WG Composition:  WG Convener: Bjørn Gustavsen  WG Secretary: Angelica.
CIGRE WG C4.24 – Power Quality and EMC Issues associated with future electricity networks WG Composition:  Convener: Francisc Zavoda; Secretary: Sarah.
WG Composition: WG Convener: Bjørn Gustavsen
Study Committee Representatives Annual Meeting October 18, 2010 Winnipeg SC B4 “HVDC and Power Electronics” Activity Report Presented by: John McNichol.
Grid Code Development Forum – 6 September 2017
ISO TC268 SC1 - Smart Community Infrastructures -
Grid Code Review Panel 16th August 2017
SO Incentives Consultation
CIGRE WG C4.28 Extrapolation of EMF measurements
CIGRE WG C4.33 – Impact of Soil-Parameter Frequency Dependence on the Response of Grounding Electrodes and on the Lightning Performance of Electrical Systems.
WG Composition: WG Convener: W. A. Radasky
Communications Timeline
Process, timeline and overview
13-block rotation schedule
2017 INCITS Officer’s Symposium
Revised engagement approach for draft GTAC
Due Dates subject to change. Watch for dashboard updates.
April May April May June July July June August Sept August
Grid Modernization and Illinois’ Utility of the Future
Next Steps Advisory group debrief call Circulate meeting summary
CUSC Amendment Panel Recommendation
Tropical cyclones movement
February 2007 Note: Source:.
Progress report of GRSG informal group
International Civil Aviation Organization
World Health Organization
STUDY COMMITTEE A1- ROTATING ELECTRICAL MACHINES
Timeline of activities
Industry Governance Group 14th August 2013
Calendar Overview – Phase I – REVISED April 2019
2015 January February March April May June July August September
GRB informal group R51.03 Annex 10
ICAO AFIS MANUAL UPDATE
Presentation transcript:

CIGRE WG C4.24 – Power Quality and EMC Issues associated with future electricity networks WG Composition:  Convener: Francisc Zavoda; Secretary: Sarah Rönnberg  Number of members: 41  No distinction made yet between regular and corresponding members Number of countries represented: 23 Number of members from industry: 14 Number of members from university/R&D: 26 WG Timeline:  Start Date: 26 September 2013  Expected Date for Submitting Final Report to SC Chairman: Autumn 2016

CIGRE WG C4.24 – Power Quality and EMC Issues associated with future electricity networks Highlights of Recent Activity:  Meetings in Montreal (Sept 2013); New Orleans (Jan 2014); Cordoba (April 2014); Bucharest (May 2014); National Harbor (July 2014).  Chapters of final report defined (see next slide)  Paper at ICHQP 2014 and keynote at ICREPQ 2014 Future Activity:  Meeting in Paris (August 2014); Rome (December 2014); and Lund (May 2015)  Panel sessions at CIRED 2015 and CIGRE Symposium 2015 Other Items: Each meeting only covers a small number of chapters, based on participation.

CIGRE WG C4.24 – Power Quality and EMC Issues associated with future electricity networks Preliminary chapters in the report:  New developments on power electronics*  Changes in power quality due to smart grids*  New emissions  Transmission  New immunity  Microgrids and power quality  Volt-VAR control and power quality*  Feeder reconfiguration and power quality*  Demand side management and power quality*  New measurements  New mitigation * = structure or preliminary contents available