Ostende GLOSS course 2006 Suggested Method for Datum Determination for the Radar Gauges provided for ODINAFRICA and GLOSS-Africa P.L.Woodworth.

Slides:



Advertisements
Similar presentations
Displaying data and calculations  How many trials have been performed?  Were there enough to satisfy the IB Internal Assessment criteria? FYI: IB wants.
Advertisements

Mean, Proportion, CLT Bootstrap
Measurement of Voltages and Currents
Measurements and Errors Introductory Lecture Prof Richard Thompson 4 th October 2007.
“Eternity begins and ends with the ocean's tides.”
UNIT: Chemistry and Measurement
Using the Rule Normal Quantile Plots
Introduction to General Chemistry Ch
Regression Analysis Using Excel. Econometrics Econometrics is simply the statistical analysis of economic phenomena Here, we just summarize some of the.
Unit 1 Measurements.
Tide Gauges Philip L. Woodworth Permanent Service for Mean Sea Level.
EXPERIMENTAL ERRORS AND DATA ANALYSIS
PHYS2020 NUMERICAL ALGORITHM NOTES ROOTS OF EQUATIONS.
1 The Basics of Regression Regression is a statistical technique that can ultimately be used for forecasting.
Sampling Distributions
SEEM 3530 Program Evaluation and Review Technique
Ch. 3.1 – Measurements and Their Uncertainty
Principles of Sea Level Measurement Long-term tide gauge records  What is a tide station?  How is sea level measured relative to the land?  What types.
Properties of Random Numbers
8 TECHNIQUES OF INTEGRATION. There are two situations in which it is impossible to find the exact value of a definite integral. TECHNIQUES OF INTEGRATION.
Ostende GLOSS Course 2006 Characteristics of Sea Level Records Philip L. Woodworth Permanent Service for Mean Sea Level With thanks to Simon Williams.
OTT “KALESTO” RADAR TIDE GAUGE
Position Lines and Fixes
Installation and Setting Up of GLOSS OTT Radar Tide Gauges with DCP Telemetry for ODINAFRICA and Future Developments Peter Foden and Jeff.
Ostende GLOSS Course 2006 GLOSS (and MedGLOSS, GCOS etc.) Philip L. Woodworth Permanent Service for Mean Sea Level.
Statistics Introduction 1.)All measurements contain random error  results always have some uncertainty 2.)Uncertainty are used to determine if two or.
Lesson Applying Profiling Leveling Techniques. Interest Approach Discuss with the students why producers sometimes put drainage ditches in their fields.
Session outcomes At the end of this topic, learners should be able to: Calculate the necessary magnification to achieve patient goals for both distance.
Uncertainty In Measurement
Chapter 3 Scientific Measurement 3.1 Using and Expressing Measurements
Calculating Tidal Datums Stephen C. Blaskey, RPLS, LSLS.
16-1 Copyright  2010 McGraw-Hill Australia Pty Ltd PowerPoint slides to accompany Croucher, Introductory Mathematics and Statistics, 5e Chapter 16 The.
Topics Covered Discrete probability distributions –The Uniform Distribution –The Binomial Distribution –The Poisson Distribution Each is appropriately.
PARAMETRIC STATISTICAL INFERENCE
Section 8.1 Estimating  When  is Known In this section, we develop techniques for estimating the population mean μ using sample data. We assume that.
1.3 Graphs of Functions Students will find the domain and range of functions and use the vertical line test for functions. Students will determine intervals.
DERIVED UNITS Combining measurements to describe physical properties.
LECTURER PROF.Dr. DEMIR BAYKA AUTOMOTIVE ENGINEERING LABORATORY I.
I Introductory Material A. Mathematical Concepts Scientific Notation and Significant Figures.
Uncertainties Using & Calculating Uncertainties for Electrical Measurement.
Lecture 8 Simple Linear Regression (cont.). Section Objectives: Statistical model for linear regression Data for simple linear regression Estimation.
3.1 Using and Expressing Measurements > 1 Copyright © Pearson Education, Inc., or its affiliates. All Rights Reserved. Chapter 3 Scientific Measurement.
P 251 Laboratory Activity 1 Measurement.
Scientific Measurement Chpt 3. Units of Measure –general qualitative – describes matter – ex. Rough, shiny, heavy, blue quantitative – measures matter.
U.S. HYDRO 2007 TIDES WORKSHOP May 17, 2006 UNCERTAINTY WORKSHOP SKGILL SLIDES.
EVALUATION OF THE RADAR PRECIPITATION MEASUREMENT ACCURACY USING RAIN GAUGE DATA Aurel Apostu Mariana Bogdan Coralia Dreve Silvia Radulescu.
V. Limits of Measurement 1. Accuracy and Precision.
INTRODUCTORY LECTURE 3 Lecture 3: Analysis of Lab Work Electricity and Measurement (E&M)BPM – 15PHF110.
Statistical analysis Why?? (besides making your life difficult …)  Scientists must collect data AND analyze it  Does your data support your hypothesis?
Lecture 3: Bridge Circuits
V. Limits of Measurement 1. Accuracy and Precision.
Lesson Applying Differential Leveling Techniques.
© SSER Ltd. How Science Works Selecting & Using Apparatus.
Uncertainty2 Types of Uncertainties Random Uncertainties: result from the randomness of measuring instruments. They can be dealt with by making repeated.
The accuracy of averages We learned how to make inference from the sample to the population: Counting the percentages. Here we begin to learn how to make.
Unit 0: Working as a Scientist – Significant Figures AGENDA: DO NOW NOTES WHITE BOARDING LAB GOAL: I can properly record and calculate data with proper.
Copyright © Cengage Learning. All rights reserved. 16 Quality Control Methods.
Measurement and Calculation
Important Reminder from Yesterday
Part III – Gathering Data
Applied Power Spectrum
Measurements and Uncertainties
Chapter 3 Scientific Measurement 3.1 Using and Expressing Measurements
ECOLOGY OF THE SEASHORE
Introduction to Instrumentation Engineering
A –Level Physics: Accuracy + Uncertainty
Graphing with Uncertainties
How Our Customers Communicate With Us
Leveling.
Presentation transcript:

Ostende GLOSS course 2006 Suggested Method for Datum Determination for the Radar Gauges provided for ODINAFRICA and GLOSS-Africa P.L.Woodworth

The Problem Is: The Kalestos should provide good time series of sea level. But the time series may contain an unknown offset (datum uncertainty) which needs to be determined by simultaneous measurements of sea level by another technique. That technique can involve the use of a tide pole, or, more desirably, the use of dipping measurements in a nearby permanent or temporary stilling well with the use of an electronic ‘dipper’.

Pole or Dipping Measurements The routine pole or dipping measurements should be made by a local observer. They should be made at least weekly in relatively calm conditions for an hour or so within a couple of hours of either high or low water, when sea level is not changing very fast.

Why Take Measurements Around High/Low Water? Tide pole or dipping measurements are instantaneous estimates of sea level, whereas the radar values will be averages over a certain period (possibly as much as 15 minutes). So it is important that sea level does not change significantly during that averaging period. For example, at a station with a large tide, the sea level could change by several cm in a minute at mid-tide. There could be small differences in the clocks used by the observer and by the radar gauge, which will convert into a significant height-difference when the tide is changing rapidly.

How Often? The local observer should try to make his measurements over a period of at least an hour once a week, with eventually an equal number of high and low water measurements obtained. With some practice, he should be able to make a tide pole or dipping measurement every few minutes, with values noted in a book along with the precise time. Therefore, approximately independent calibrations could be obtained in his weekly visit to the gauge.

Radar gauge Tide pole Stilling well dRP CP

How will the Different Sea Level Measurements be Used? The above figure shows the different sea level measurements at the tide gauge station. In addition to the radar gauge, the station must also have a tide pole and a permanent or temporary stilling well. The tide pole should be adjusted to show sea level values relative to a defined datum (usually Chart Datum, sometimes called the Hydrographic Zero, for the station) with the height difference between that datum and the height of the main Tide Gauge Benchmark determined from local levelling repeated at least annually (see the GLOSS tide gauge manuals). Similarly, there should be a Contact Point on the stilling well relative to which dipping measurements can be made. The usual contact point is the top of the well. Levelling will determine the difference in height between the CP and CD and TGBM.

Some Mathematics For present purposes, let us use CD (HZ) as our reference level, then: P = sea level relative to CD as measured by the tide pole W = sea level measured by the stilling well = Hcp – d where Hcp = height of the Contact Point of the well above CD and d = dipping measurement of the water level in the well R = value of sea level from the radar gauge which needs to be adjusted to be relative to CD. (At sites which read the radar gauge through the OTT logosens logger then R will be measured upwards as normal. For the gauges read through the Orbcomm boxes R will be the range from the transducer downwards to the sea level. Here we assume the former.) From sets of simultaneous data (see above) we can then calculate an offset O from: O = P – R or W-R such that R corrected = R measured + O And then the corrected values of R will be radar measurements of sea level relative to CD.

What to do with the Tide Pole or Dipping Measurements? We suggest that each week an excel sheet is completed listing the tide pole or dipping values containing for example: Station (e.g. Pemba) Measurement type (e.g. pole or dip) Time (in UT/GMT) (e.g ) correct to the nearest minute (accurate watch/radio required) Measurement (e.g ) in cm [if ‘pole’ then the value shown by the pole should be entered here, we will know from separate correspondence how the tide pole datum relates to TGBM] [if ‘dip’, then the downward value obtained from the dipper should be entered here, we will know from separate correspondence what the Hcp value is.] The excel sheets should be sent regularly to a central (e.g. PSMSL, to be decided) which will be set up to collect the information and subsequently make it available to all concerned. As ODINAFRICA develops, we will have to see how these suggested arrangements should be modified.