Twisted Racetrack Manufacturing & Metrology. Winding/metrology prototype chronology Various keystoning tests – Completed. –Established keystone effect.

Slides:



Advertisements
Similar presentations
Assigned Wheel Hub – GD&T
Advertisements

inFire HTC speed Furnace Webinar
NCSX Mod Coil C1 features requiring rework at PPPL.
Testing Test Setup TapLok Insert Shear Key Copper Threads Friction Tests Collar Shear Tests NSTX TF FLAG JOINT REVIEW 8/7/03 Michael Kalish.
Sources of the Magnetic Field
Geometric Tolerances J. M. McCarthy Fall 2003
PRAGMATIC APPLICATION OF GAUGE-MANPOWER CORRELATION FISHER CONTROLS Alexandria Stewart, Michael Stinn, Justin Thede, Alicia Wieland.
J.H. ChrzanowskiMod Coil R&D Update1 Modular Coil R&D Keystone Activities April 30, 2003 James H. Chrzanowski.
Inside-, Depth-, and Height-Measuring Instruments
CHAPTER 7 ANGLE MEASUREMENT
Summary of the end part design process using BEND R. Bossert February 14, 2013.
 Introduction  Designing of Die Block  Process of making Press Form Points to be Covered PRESS FORM AND RUBBER TECHNOLOGY.
EuCARD-HFM ESAC review of the high field dipole design, 20/01/2011, Maria Durante, 1/40 EuCARD-HFM ESAC Review of the high field dipole design Fabrication.
SCU Magnet Modelling: Tolerances and Beam Trajectories Ben Shepherd Superconducting Undulator Workshop RAL, April 2014.
FORCE-STRAIN-STRESS measurements.
NSTX Upgrade Testing TF Coil Flexible Connector Prototype In-Plane Deflection Test
GAUGES Gauges perform an essential services in any scheme of quantity production on an interchangeable basis A gauge (or Limit Gauge) is a tool or instrument.
INSTRUMENTS FOR ANGULAR MEASUREMENT 3. Sine Table: 25/02/20121Lec # 19 & 20.
Introduction to Precision Metrology
Metrology for NCSX Steve Raftopoulos and the NCSX Metrology Team.
Classification of Instruments :
ANADOLU U N I V E R S I T Y ENM202 Industrial Engineering Department
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
BNG Industrial experience on Superconducting Undulators C. Boffo, T. Gehrard, B. Schraut, J. Steinmann, W. Walter, Babcock Noell GmbH T. Baumbach, S. Casalbuoni,
Errors in Measurement Muhajir Ab. Rahim
LINEAR MEASUREMENT.
NCSX Metrology 1/7/04. Short term purchase recommendation Buy the Spatial Analyzer Software package –This software will be the user interface for operating.
H. Felice - P. Ferracin – D. Cheng 09/19/2013 Update on structure CAD model.
Coil Cooling Workshop Summary June 10, Electrical Isolation: Cladding is isolated from the T by Kapton. The chill plates electrically connect at.
General Tolerance and Hole Fit
Registered Electrical & Mechanical Engineer
NCSX Modular Coil Composite Conductor Torsion Measurement of the Conductor Shear Modulus at Both Room and Liquid Nitrogen Temperatures 15 Dec 2004.
NCSX Modular Coil Turning Fixture FDR. Background Modular Coil winding forms are cast structures which provide the foundation on which the coils are constructed.
1 Dimensional Control for the National Compact Stellarator Experiment R. Ellis, A. Brooks, T. Brown, W. Reiersen, S. Raftopoulos, B. Stratton Presented.
Tolerancing Chapter 11.
1 NCSX Modular coil winding pack To shim or not to shim? NCSX WBS 1 Engineering Meeting July 7, 2004 What is requirement? What is baseline winding pack.
Measurement of Modular Coil Keystone Effect Peer Review 4/1/03.
Chapter 36 Quality Engineering (Part 2) EIN 3390 Manufacturing Processes Summer A, 2012.
Process for Determining Shim Sizes and Estimating Net Shift in Current Center Measurements will be needed at four layers – starting with top of first layer.
J.H. ChrzanowskiMod Coil R&D Update1 Modular Coil R&D Update April 9, 2003 James H. Chrzanowski.
Fred Nobrega, Nikolai Andreev 21 September, 2015.
NCSX A. Brooks, P. Fogarty, G. Lovett, D. Williamson June 3, 2005 Modular Coil Type-C Final Design Review – Part II.
Metrology Milestones Metrology Task Force –Vacuum vessel manufacture - P. Goranson –Mod. Coil Form manufacture - D. Williamson –Mod. Coil winding- S. Raftopoulos.
Thomas Jefferson National Accelerator Facility Page 1 Clear Mold VPI Visualization D. Kashy S. Christo May 14, 2014.
DPT 312 METROLOGY CHAPTER 3 MEASUREMENT AND TOLERANCES
GEOMETRIC DIMENSIONING & TOLERANCING (GD & T)
NCSX VACUUM VESSEL HEATING/COOLING PL Goranson Preliminary Results February 17, 2006 MDL Testing of Coolant Tracing NCSX.
NCSX David Johnson August 18, 2004 Discussion of Co-Wound Flux Loops.
NCSX B. Stratton May 13, 2005 Modular Coil Winding Dimensional Control Plan Peer Review.
The Larsen Autoblocker Calibrating Your System for Maximum Productivity and Quality.
NCSX B. Nelson for the NCSX Engineering Team NCSX modular coil cooling workshop June 10-11, 2004 PPPL NCSX Modular Coil Cooling Requirements and Initial.
1 Field Period Assembly Office of Science Project Review Princeton Plasma Physics Laboratory Princeton, NJ November 2, 2005 T. Brown Princeton Plasma Physics.
Modular Coil Metrology Data for Current Center Shift Calculation.
1 Modular Coil Winding Keystoning Issues NCSX Technical Meeting May 29, 2003 What is the current baseline winding? What is the problem? What are the variables.
NCSX P. Fogarty, K. Freudenberg, T. Hargrove, G. Lovett, B. Nelson, P. Goranson, D. Williamson October 15, 2004 Twisted Racetrack Coil Final Design Review.
1 Stellarator Core Metrology issues NCSX WBS-1 Meeting April 2, 2003 What are we measuring? When? How do we take the measurements? How do we correlate.
AWB Dimensional Control Requirements for the Modular Coils and TF coils Field Period Assembly Peer Review October 11-12, 2006 Art Brooks.
LARP Collaboration Meeting Racetrack Coil Fabrication
SEPT 20, 2006 T. Brown, M. Cole, P. Fogarty, P. Goranson, K. Freudenberg, D. Williamson NCSX STAGE 2 COIL TO COIL ASSY.
Autodesk Inventor Autodesk Inventor EdgeCAM EdgeCAM CNC Motion - Part 3 CNC Motion - Part 3 Prolight CNC Mill Prolight CNC Mill CNC Box.
C H A P T E R E L E V E N TOLERANCING. 2 Technical Drawing with Engineering Graphics, 14/e Giesecke, Hill, Spencer, Dygdon, Novak, Lockhart, Goodman ©
Physics Requirements Sensitivity to Manufacturing Imperfections Strategy  where to map field  measure deviation from ideal model  fit to error tables.
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
Review of Modular Coil Winding Pack Configuration David Williamson March 19, 2004.
Angular Measurements Angle is defined as the opening between two lines which meet at a point. If a circle is divided into 360 parts, then each part is.
1 Testing of Twisted Racetrack Coil B. Nelson TRC FDR 15 Oct 2004.
TE-MSC. 07/04/2016 Jose Ferradas TE-MSC-MDT Alejandro Carlon TE-MSC-MDT Juan Carlos Perez TE-MSC-MDT On behalf to MSC-MDT section and Coil working group.
Introduction to Precision Metrology
Undulator Assembly Procedure
Presentation transcript:

Twisted Racetrack Manufacturing & Metrology

Winding/metrology prototype chronology Various keystoning tests – Completed. –Established keystone effect vs. radius for several conductors. Plain oval – Completed. –Wound coil primarily for electro-mechanical testing. Verified that the VPI groove worked. Did not use the current conductor or chill plate design. No metrology on coil. Inchworm – Completed. Straight Tee – Near completion. Twisted Oval – Near Start. Full sized Prototype – Cancelled.

Winding/Metrology History - Inchworm –The inchworm is a prototype with the following goals. Develop winding techniques on a curved surface. Test the clamp system on a curved surface. Development of a mechanical measurement (MMT) tool. –The inchworm had the following conditions/limitations: The surface was not machined and was not a viable platform to make accurate measurements. –What we learned: The first generation clamps (swing arm clamp) were not viable – new clamps were designed and built. The MMT was a viable instrument for measurement. The MMT could be removed and re-installed onto the same location and reproduce the previous measurement to +/ ”. a G-10 pad between the conductor and the MMT is needed. In addition to being spongy, there are too many undulations in the glass-wrapped conductor. The width of this pad is critical. When laid onto a curve surface a wide pad produced as much as.020” error.

Winding/Metrology History-Straight Tee –The straight tee is a prototype with the following goals: Refine the sprue system. Take measurements with the MMT. Prototype the lead details. –The straight tee was wound with the following conditions: Clamps on 6” centers. No outer chill plates ” glass cloth shim inserted between each row. No spherical seat/no fastening of clamps on bottom end. No shimming to a predetermined height – the conductor was measured and compared to nominal growth. Statistical data was taken. –What was learned Stack gets “springy” as it grows. The copper chill plates must fit the tee geometry precisely or large deviations (+.020”) can occur. The ground wrap is in the way – the winding clamps and MMT had to be redesigned to make room. By varying clamping force and tamping of the conductor, the conductor surface can be moved +/ ”. (after 4-5 rows are installed). The pads used to spread the clamping loads got in the way had to be constantly shifted to accommodate the measurements.

Metrology/Measurement Results – Straight Tee The following is a summary of the measurements taken on the straight tee: –The form was measured to establish a baseline. Measurements were taken at six locations (between six-inch centers). Additional measurements were taken after the copper was installed and after the 2 nd, 5 th, 8 th and 10 th rows. All measurements were taken from the counter-bores at the top of the tee. A G-10 pad was placed on top of the conductor and the MMT was used to measure the height across the entire width of the four conductors. Final dimensions were derived by subtraction. –The precision of the MMT was established by making repeated measurements at the same location(s). The MMT would measure the same location to a precision of approximately +/ ”. This is very good considering that the machining of the straight tee was not to the greatest precision possible. –The standard deviation of the measurements was small – especially for the early rows. It got worse as the stack got spongier. –We did not/could nor measure between clamping locations. We don’t know what the bulge is, however when we wind with clamps at 3” centers it will be minimized. (we cannot get clamps any closer than 3”). –Recommend that we dissect the straight tee and evaluate the cross section.

Twisted tee – Measured results BaseBase+Cu2-turn5-turn**8-turn10-turn Desired (theoretical build-up)N/A Mean (average of all measurements)  Desired (ave. deviation from desired) N/A std. deviation of the mean Range (+/- extremes of measurementN/A-.001 to to to to to ** one data point excluded.

Metrology for the Twisted Racetrack Measurements: –For the Casting Using the Romer arm, the casting will be measured against the CAD model. A “best fit” to measured points will be performed. The best fit can be performed using measured points from the entire casing (which will yield the smallest  for the entire casting), or distinct features can be used for the alignment. Using distinct features to align can yield a tighter  for an important area, however the remaining area may fall out of tolerance by a greater amount. After the best fit is accepted, we shall always use 3 point alignment (3 tooling balls or holes). This will guarantee that we consistently realign to the same reference –For the Coil Winding Process The winding can be measured with a local measuring tool (micrometer based), or with the Romer. With either method the clamps and the pressure pads (they spread the clamping load over conductor surfaces) are in the way and will have to be moved. The Romer arm will require a CAD model with specific point(s) (for each turn) to be measured. The Mechanical measurement tool will use a specific gauge block for each elevation. The micrometer will be inserted onto the gauge block and zeroed. While measuring the conductor, a zero reading is perfect. Deviations (in +/- thousands of an inch) from the desired location will be read directly on the dial indicator. The arrangement of the conductors (shimming between layers) needs to be predetermined so that the gauge blocks can be fabricated for the specific measurements. With the MMT, we can also adjust “on- the-fly” by making the calculations in the field. For the Romer, we will have to have predetermined coil locations so that we can make CAD models to measure against. The mechanical measurement tool is limited in measuring at discreet locations between clamps. We can measure perpendicular to the filament along the entire height and width of the coil. Recommend that we measure and position the coil with the MMT. It will be as accurate and faster than the Romer. We should use the Romer for measuring the coil to verify the MMT measurements and to establish the experience/techniques.

Conclusions At each new step in the winding R&D we have had surprises that have forced us to redesign our tooling and rethink our methods. This will hold true for the twisted racetrack. We have not had an opportunity to wind a coil under the following conditions: –on a precisely machined, twisted cross section. –with the final chill plate design and cooling tubes. – with clamps on 3” centers. There are elements of the process that may present difficulties that are not determined/resolved: –Fitting copper chill plates onto the curved surface. –Laying in the ground wrap onto the curved surface. –Ability to install clamps on 3” centers in the tight radius areas. We may need to fabricate special saddles for these regions. –Configuration of the pads that spread the clamp load. We have no experience with pads for a curved surface. –Springiness of the pack and how it reacts as clamps are removed for winding and measuring. –Ability to reposition the coil back to the desired location after the outer chill plates and bag mold are installed. We loose sight of the coil!! The tools that we are measuring with (the MMT and the Romer) have the accuracy and precision to measure and locate the coil conductor within the prescribed accuracy. Our ability to keep it there as we go into the VPI stage is the largest variable in this process.