S Visual Workplace Process

Slides:



Advertisements
Similar presentations
HOUSEKEEPING & 5 “S”.
Advertisements

Toyota 5S System SCM 462 Dr. Ron Lembke.
5S THE SECRET TO JAPANESE SUCCESS.
To Create a Workplace suited for Visual Control and Lean Production
Understanding 5S.
5S training Office Environments.
5S BASIC TRAINING What is 5S and why do we want to do it?
CONTINUAL IMPROVEMENT
Stability Tools 5S How do we do a 5S Sort ? What is 5S ? Why use 5S ?
HOUSEKEEPING & 5 “S”. Housekeeping does not mean only cleanliness, it means much more than only cleanliness.
Supplier Development Kaizen Implementation Kit
Management Meeting Month X, 20XX
Every patient matters STAFF INVOLVEMENT USING LEAN IMPROVEMENT.
SELF-DISCIPLINE Shitsuke
Introduction to 6S.
Past, Present and Future
SCM 494 Dr. Ron Tibben-Lembke
Stability & Standardization. 7 Types of Waste7 Types of Waste  Motion (Unnecessary movement)  Waiting  Transportation or conveyance  Storage (Excess.
SCM 494 Dr. Ron Tibben-Lembke
1 © 2005 Superfactory™. All Rights Reserved. Lean Office - 5S and Visual Controls Superfactory Excellence Program™
A fun and exciting way to present the 5S concepts to our team!
LEAN MANUFACTURING Jason Prior. Introduction to Lean  Overview of Lean in Toyota video.video  Main Concept: ELIMINATING WASTE  Not an acronym  Not.
5s (Workplace Organization) Implementation
Chapter 1 Enterprise Wide View.
Visual Workplace - A Prerequisite To Becoming World Class
5S Improving safety & efficiency
© ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited Introduction to 5C TOTAL QUALITY MANAGEMENT 5C.
Chapter 4 5S.
Reducing Strain and Sprain Injuries Georgia Department of Administration Risk Management Services Loss Control Services 1.
BUILD WITH US. ™ 5S – The Foundation for Improvements Safety the “6 th ” S.
A Workplace Organization Method
Aluminum Die Casting Visual Workplace (6S).
Safety, Health & Environment
IT Project Management, Third Edition Chapter 5 1 Chapter 2: Project Scope Management.
Visual Management Quick Review
Lean Manufacturing Visual Systems XYZ Company.
5S Workplace Audit Category Item Level Sort Store Shine Standardize
Freeleansite.com Kaizen (What is it ?) Lean Foundations Continuous Improvement Training Lean Foundations Continuous Improvement Training.
5S at New Belgium Brewing Company
5-S Quick Learning Module Industrial Solutions, Inc.
HOME Copyright EASE Inc Tutorials© The “5S” Philosophy An EASEworks® Manufacturing Tutorial START Ver 6.
1 Lean Supply Strategies: Applying 5S Tools to Supply Chain Management Kimball Bullington, Ph.D. Professor of Supply Chain Management Middle Tennessee.
Session 5 Review A3 progress Error Proofing Visual Control Workplace organisation Standard Operating Procedures.
Safety Series Safety Leadership Series 5 S + 1 Safety Makes the Difference!!!
5S Introduction – Workplace Organisation
Visual Management Visual Management.
1 Lean Office - 5S and Visual Controls
6 S System The Visual Workplace Directorate of Training and Education
Using 5S to Start Your Lean Journey Presented by: Brian D Krichbaum Process Coaching Incorporated.
BE-TL1-001-DRAFT-5S 5S Business Excellence DRAFT October 5, 2007.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
5S Workplace Organization Northland Community & Technical College Presented by: Tim Bergerson, Robbi Brateng, Mitch Ostrom, Jesse Adkins, Bob Gooden,
5S Basics. SOUND FAMILIAR? 5S is probably for you! Workers waste time looking for things. Most horizontal surfaces are covered. Work space is crowded.
May 2016 Safety Focus Extra. What is 5S and why do we want to do it? Simple but highly effective set of techniques that help organize and remove excess.
5S WORKPLACE IMPROVEMENT Central Stores & Freight Room.
5S Improving safety & efficiency. 5S Translation Step JapaneseLiteral Translation English Step 1:SeiriClearing UpSort Step 2:SeitonOrganizingSet In Order.
HOUSE KEEPING A base for any improvement u Even before you plan the direction you need to take, you must remove any obstacles to get a clear view of the.
5S workplace organisation
Office 5S “S” by “S” Implementation guide Site clear = Clearing Up
HOUSEKEEPING & 5 “S”.
FIVE S’s SCORING Date_________ Cumulative Improvements
Prepared By: Suman Kumar Singh
5S TRAINING.
5S BASIC TRAINING What is 5S and why do we want to do it?
5-S.
5 S.
5S A Workplace Organization Method
SCM 494 Dr. Ron Tibben-Lembke
5S BASIC TRAINING What is 5S and why do we want to do it?
July 2019 Safety Focus Extra
Presentation transcript:

3.1.2 6S Visual Workplace Process The purpose of the 6S visual workplace process is to place ongoing and continuous focus on workplace organization and effectiveness. 6S VISUAL WORKPLACE PROCESS PPT report Setup Preparation Implement Audit Feedback Develop Annual 6S Implementation Plan and schedule Communicate 6S plan 6S Audit results Create incentive program Repeat annually Train all work areas in the 6S process Provide coaching and assistance Establish 6S scorecards in each work area Repeat regularly Work areas schedule and implement 6S in a series of scheduled work events Weekly audit results go on the work area scorecard Collect feedback and improve process Areas Addressed 3.1.2 6S Visual Workplace Process – How does your organization ensure effective deployment of 6S Visual Workplace strategies for workplace organization? How are the 6S status, process flow, production status, employee training status, and continuous improvement effort clearly displayed and visible in the office and factory floor? How does your organization ensure that work areas are kept consistently free of dirt and clutter? How are improvements reviewed and recognized? 4/24/2017

4/24/2017

4/24/2017

A process for creating and maintaining an What is 6S? A process for creating and maintaining an organized, clean, and high performance work place, which serves as a foundation for continuous improvement activities 4/24/2017

4/24/2017

LP-1312 6S Process 4/24/2017

3.2 WI 002 – Set in Order 3.3 WI 003 - Shine 3.4 WI 004 - Standardize LP-1312 6S Process 3.1 WI 001 - Sort 3.2 WI 002 – Set in Order 3.3 WI 003 - Shine 3.4 WI 004 - Standardize 3.5 WI 005 - Sustain 3.6 WI 006 – Safety 3.7 WI 007 – 6S Audit form 3.8 WI 008 – Training 3.9 WI 001-1 – Form 1 3.10 WI 004-1 – Standardize Sustainment Schedule form 1 3.11 LP-1312 Floor marking procedure(Done).doc Our internal procedure LP-1312 4/24/2017

Things not needed ever again Things not needed in the first place Things not needed now Things not needed here Things not needed ever again Things not needed in the first place Things not needed any more 4/24/2017

KEEP DONATE TOSS MAYBE 4/24/2017

RED TAG General Information Date: ___________ Tagged By:_________   Date: ___________ Tagged By:_________ Item Name: __________________________ Location: ____________________________ Category (Circle applicable) Equipment Raw Materials Tools and Jugs work-in-Process Finished Goods Stationary, etc. Instruments Other Consumable Materials Machine parts Reason for Red Tag __Not required __Aged/Obsolete __Defect __Other __Scrap Other: _________________________________ 4/24/2017

Red Tag Register 4/24/2017

One Step Rule: Ideally nothing is stored more than one step away One Step Rule: Ideally nothing is stored more than one step away. This improves efficiency by eliminating lost time. 45 Degree Rule: Immediate work area minimizes twisting, especially for work benches. If something weighs more than a few pounds, position it beyond immediate reach. 4/24/2017

Strike Zone Rule: Store things above the knees and below the chest Strike Zone Rule: Store things above the knees and below the chest. This reduces back strain and other height associated risks. Weight Rule: Locate heavy items to eliminate bending, stooping or unnecessary arm movement. 4/24/2017

“Best Practices” LABELING 4/24/2017

6S Sustainment Schedule Month _______________________   Week 1 Week 2 Week 3 Week 4 Equipment ID Person Responsible Activities to perform Audit Frequency Monday Tuesday Wednesday Thrusday Friday 4/24/2017

4/24/2017

Sustainment action log 4/24/2017

RESPONSIBILITY MAP 1st shift - 2nd shift - Weekend - 4/24/2017

4/24/2017 -SORT 1. Is the cell environment uncluttered?   1. Is the cell environment uncluttered? ___1.Tools, material, equipment, is all over the place, nothing has a home. ___2.We know clutter is an issue and started working on a plan to clean up. ___3.Clean up is in process. ___4.Just completed clean up and sorting process. ___5.Sorting systems are working and clutter is under control. 2. Are all materials and tools stored neatly? ___1.Material and tools are not in any form of organized storage. ___2.We know material and tool storage is an issue and started working on an organization plan. ___3.Putting away all unused tools and materials, organized work areas. ___4.Just completed organization process ___5.Material and tool storage is under control. 3. Are provisions and parts identified with status and properly stored? ___1.Hardware, spare and/or samples parts are not marked or stored. ___2.We know provisions and parts identified are an issue and started working on a control plan. ___3.Organization and identification of provisions and parts are in process. ___4.Just completed origination and identification of provisions and parts or organization and identification are being preformed but could be improved. ___5.Organization and identification of provisions and parts are under control 4. Was employee 6S training provided and documented? ___1.Employees are not trained. ___2.We are planning the training of our employees. ___3.Training is in process. ___4.Just completed basic 6S training, but more detailed training will be needed. ___5.Employees are performing their 6S tasks as required. 5. Are unnecessary personal belongings properly stored, away from public areas? ___1.We have no process to control employee belongings. ___2.We know personal belongings are an issue and started working on a plan to clean up. ___3.Storing of employee’s personal belongings is in process. ___4.Just completed storing of employee’s personal belongings or we have some controls in place but they could be improved. ___5.Employees have been keeping their personal belongings out of public areas. Sort Total Score:_____ Class A 25-23, B 22-20, C 19-16, D less than 15 4/24/2017

QUALITY DEPT – 6S AUDIT RESULTS Q3 2012 Score: 122 Goal: 148

IN N OUT BRAZE – 6S AUDIT RESULTS Q3 – 2012 Score: 94 Goal: 148

QUESTIONS 4/24/2017