Integrating competence development at the individual-, group- and organizational level Luxembourg, February 6, 2006.

Slides:



Advertisements
Similar presentations
September 2008Mike Woodard Rational Unified Process Key Concepts Mike Woodard.
Advertisements

Functional and non-functional requirements for building Service-oriented assessment model Adelina Aleksieva-Petrova Milen Petrov 5th TENCompetence Open.
WP4 Presentation, TenCompetence Kick-off, Dec 8 th – 9 th 2005.
THE SYSTEMS DEVELOPMENT LIFE CYCLE (SDLC)
In Europe, When you ask the VET stakeholders : What does Quality Assurance mean for VET system? You can get the following answer: Quality is not an absolute.
WP 3 - Technical design & Implementation of the Integrated system Wouter Jan Smeulers LogicaCMG The Hague Roland Ettema LogicaCMG Maastricht Louis Maessen.
GAI Proprietary Information
SYSC System Analysis and Design
TENCompetence WP2: Common Ground Rob Koper Work Packages Kick-Off TENCompetence Project 9-13 January 2006 Heerlen, The Netherlands.
WP5 – Knowledge Resource Sharing and Management Kick-off Meeting – Valkenburg 8-9 December 2005 Dr. Giancarlo Bo Giunti Interactive Labs S.r.l.
Rational Unified Process
Panel on Competency-based Learning I2LOR2006 Conference, Montreal, Canada 10 November 2006,
Scenarios and models for Training Pilots Andrey Ruskov Petko Ruskov, Sofia University “St. Kliment Ohridski”
1/19. 2/19 WP6 Presentation Pythagoras Karampiperis, WP6 Leader Demetrios Sampson, CERTH CB Representative Antonis Kokkonos, CERTH WP6 Team Member Advanced.
Convince Woody! Fabien Girardin Pompeu Fabra University Eleni Boursinou INSEAD TENCompetence Open Workshop Manchester, January 2007.
Iterative development and The Unified process
© 2005 Prentice Hall2-1 Stumpf and Teague Object-Oriented Systems Analysis and Design with UML.
WP 8: Networks for Lifelong Competence Development Alicia Cheak INSEAD CALT (Centre for Advanced Learning Technologies) TEN Competence Kickoff Meeting.
Developing the Personal Competence Manager Evaluation Work: ‘EPIQ Business Demonstrator’ Elena Shoikova, Vladislav Denishev, Radoslav Milanov Technical.
Continuation From Chapter From Chapter 1
CIS 321—IS Analysis & Design
Introduction to RUP Spring Sharif Univ. of Tech.2 Outlines What is RUP? RUP Phases –Inception –Elaboration –Construction –Transition.
CSI315 Web Applications and Technology Overview of Systems Development (342)
Engineering, Operations & Technology | Information TechnologyAPEX | 1 Copyright © 2009 Boeing. All rights reserved. Architecture Concept UG D- DOC UG D-
Twelfth Lecture Hour 10:30 – 11:20 am, Saturday, September 15 Software Management Disciplines Project Organization and Responsibilities (from Part III,
-Nikhil Bhatia 28 th October What is RUP? Central Elements of RUP Project Lifecycle Phases Six Engineering Disciplines Three Supporting Disciplines.
WP10 Dissemination Oleg Liber, U. Bolton UK Objectives 1.To disseminate, on an on-going basis, the RTD outcomes: specifications and standards, architectures,
The Challenge of IT-Business Alignment
TENCompetence: The European Network for Competence Development Chris Kew CETIS April
WP7 - Architecture and implementation plan Objectives o Integrating the legal, governance and financial plans with technological implementation through.
BUSINESS INFORMATICS descriptors presentation Vladimir Radevski, PhD Associated Professor Faculty of Contemporary Sciences and Technologies (CST) Linkoping.
Chapter 10 Information Systems Analysis and Design
Roadmap to successful ECM implementation Kateřina Divišová British Chamber of Commerce
Eighth Hour Lecture 7:30 – 8:20 pm, Thursday, September 13 Workflows of the Process (from Chapter 8 of Royce’ book)
CLARIN work packages. Conference Place yyyy-mm-dd
Fifth Lecture Hour 9:30 – 10:20 am, September 9, 2001 Framework for a Software Management Process – Life Cycle Phases (Part II, Chapter 5 of Royce’ book)
SmartNets Results Overview SmartNets SmartNets Methods.
© 2010 Bennett, McRobb and Farmer1 Development Process Based on Chapter 5 Bennett, McRobb and Farmer Object Oriented Systems Analysis and Design Using.
THE UNIFIED PROCESS UP Programming. What is the unified process  The Unified Process is a programming methodology that emphasizes the right blend of.
Aim (and name)... We will build The European Network for Lifelong Competence Development i.e. Provide a technical and organisational Infrastructure that.
WP 9 training2 WP 9 TRAINING Kick-off Meeting – Valkenburg 9 December 2005 dr.Marlies Bitter-Rijpkema, Open Universiteit Nederland.
Rational Unified Process (RUP) Process Meta-model Inception Phase These notes adopted and slightly modified from “RUP Made Easy”, provided by the IBM Academic.
WP2: Domain Model + WP3 TENCC Rob Koper & Hubert Vogten TENCompetence Project Meeting 3-4 July 2006 Kerkrade, The Netherlands.
TRAILER Tagging, Recognition and Acknowledgment of Informal Learning ExpeRience This project has been funded with support from the European CommisionEuropean.
CISB113 Fundamentals of Information Systems IS Development.
Prototypes A systematic look at Prototyping (Christiane Floyd)
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
ANALISA & PERANCANGAN SISTEM Disusun Oleh : Dr. Lily Wulandari Program Pasca Sarjana Magister Sistem Informasi Universitas Gunadarma.
BizForceOne by MegaSolutionCenter (MSC), USA BIZFORCEONE OPERATING SYSTEM BEST FIT IMPLEMENTATION.
1 Week 3 Software Engineering Spring Term 2016 Marymount University School of Business Administration Professor Suydam.
Frank Schipplick Work Package Coordinator WP1 - eSignatures.
Development Process Based on Chapter 5 Bennett, McRobb and Farmer
Panel on Competency-based Learning
School of Business Administration
Systems Analysis & Design N106
DT249/4 Information Systems Engineering Lecture 0
UNIFIED PROCESS.
Unified Process(UP) popo.
Description of Revision
Rational Unified Process
Rational Unified Process (RUP)
OO Design and Development
Stumpf and Teague Object-Oriented Systems Analysis and Design with UML
LOSD Publication Deirdre Lee
Project Phases ‘98 ‘00 ‘02 ‘04 ‘06 Preparatory Phase
Stumpf and Teague Object-Oriented Systems Analysis and Design with UML
{Project Name} Organizational Chart, Roles and Responsibilities
Chapter 4: Software Process Models
ACSC 155 System Analysis and Design 4. Systems Design
Presentation transcript:

Integrating competence development at the individual-, group- and organizational level Luxembourg, February 6, 2006

Central problem The knowledge society demands continuous competence development and management at the individual-, group- and organizational level Competence development and management for individuals, groups and organizations are distinct fields with their own approaches and tooling

TENCompetence proposal To support individuals, groups and organizations in Europe in lifelong competence development by establishing the most appropriate technical and organizational infrastructure, using open- source, standards-based, sustainable and extensible technology.

Aspects to be integrated Knowledge Resource Sharing & Management Learning Activities & Units of Learning Competence Development Programmes Networks for Lifelong Competence Development

RTD management according to The Unified Process Four RTD phases – three project cycles: –Phase 1: Inception: proposal + 6 months –Phase 2: Elaboration: 12 months –Phase 3: Construction: 18 months –Phase 4: Transition: 12 months Within each phase a full work flow cycle of: –Requirements definition –Analysis –Design –Implementation –Test

Overall project outcomes Inception phase: rolling work plan for the next phases Elaboration phase: technical architecture + business model architecture Construction phase: integrated, component based, open source architecture + business model(s) Transition phase: client-defined architecture application profiles + business operations implementations

Cycle 1 deliverables Overall architecture design + developers’ guidelines First version of the TENCompetence infrastructure User requirements and validation criteria, business scenarios, overall evaluation plan Cycle 1 outputs + roadmaps for the aspect RTD work packages Training roadmap and pilot designs Associate Partners organizational model and roadmap Integrated roadmap + detailed work plan cycle 2

Partners Open Universiteit Nederland Software de Base LogicaCMG Universitat Pompeu Fabra GIUNTI CERTH Universitat Hannover INSEAD University of Bolton Universiteit van Amsterdam Sofia University Stichting SURF Synergetics