Component 8 Installation and Maintenance of Health IT Systems Unit 11 Pilot Testing and Full-Scale Deployment This material was developed by Duke University,

Slides:



Advertisements
Similar presentations
Case Study: Developing an EMR Implementation Schedule at UVA Health System Paul Dreyer VA HIMSS Student Liaison.
Advertisements

Welcome to Game Lets start the Game. An electronic health record (EHR) is a digital version of a patient’s paper chart. EHRs are real-time, patient-centered.
Installation and Maintenance of Health IT Systems This material Comp8_Unit11 was developed by Duke University, funded by the Department of Health and Human.
SEVOCITY WELCOMES 1. AGENDA Introductions Key Responsibilities Review of Key Information Major Project Steps – Review 2.
1 Meeting On The Management Of Statistical Information Systems (MSIS), Oslo, May 18-20, 2009 Shri Narayanan, Economic Systems, TGS Jola Stefanska, STA.
ITIL: Service Transition
What Happens after You Sign with Missouri Health Information Technology Assistance Center?
Health Informatics Series
Revised Change, Configuration, Release (CCR) Rollout Overview
Release & Deployment ITIL Version 3
Information Security Compliance System Owner Training Richard Gadsden Information Security Office Office of the CIO – Information Services Sharon Knowles.
Current and Emerging Use of Clinical Information Systems
Decision Support for Quality Improvement
1 Addressing Common EHR Implementation Problems June 18, 2010 Tammy Geltmaker, RN, BSN, MHA EHR Consulting Manager, Health Care Excel Bonnie Hollopeter,
Chapter 10.
Component 10 – Fundamentals of Workflow Process Analysis and Redesign Unit 10 – Process Change Implementation and Evaluation This material was developed.
Working with Health IT Systems HIT System Planning, Acquisition, Installation, & Training: Practices to Support & Pitfalls to Avoid Lecture b This material.
ADOPTING OPEN SOURCE INTEGRATED LIBRARY SYSTEMS Best Practices Presented by Vandana Singh, PhD Assistant Professor, School of Information Sciences University.
AHRQ 2006 Annual Conference on Patient Safety and Health IT Socio-Technical Approach to Planning and Assessing Redesign Huron Hospital CPOE Implementation.
Module CC3002 Post Implementation Issues Lecture for Week 2 AY 2013 Spring.
Configuring Electronic Health Records Migration to an Electronic Health Record System Lecture b This material (Comp11_unit1b) was developed by Oregon Health.
Georgia Rural HIT Forum CLINICAL HIT LEADERSHIP – ESSENTIAL ELEMENTS FOR SUCCESS Karen Graves Clinical Systems Analyst - Chestatee Regional Hospital Jennifer.
Installation and Maintenance of Health IT Systems
Working with Health IT Systems Potential Issues with Adoption and Installation of an HIT System This material (Comp7_Unit9) was developed by Johns Hopkins.
Comp 14 - Special Topics in Vendor- Specific Systems Unit 8 - Vendor-Specific Go- Live Strategies This material was developed by Columbia University, funded.
Configuring Electronic Health Records Migration to an Electronic Health Record System Lecture a This material (Comp11_Unit1a) was developed by Oregon Health.
Unit 8a Troubleshooting; Maintenance and Upgrades; Interaction with Vendors, Developers, and Users Component 8 Installation and Maintenance of Health IT.
Unit 8b Troubleshooting; Maintenance and Upgrades; Interaction with Vendors, Developers, and Users Component 8 Installation and Maintenance of Health IT.
Installation and Maintenance of Health IT Systems This material Comp8_Unit3 was developed by Duke University, funded by the Department of Health and Human.
Georgia Institute of Technology CS 4320 Fall 2003.
Handbook of Informatics for Nurses and Healthcare Professionals Copyright ©2009 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights.
Component 8 Installation and Maintenance of Health IT Systems Unit 1a Elements of a Typical Electronic Health Record System This material was developed.
Component 8 Installation and Maintenance of Health IT Systems Unit 5 The Software Development Life Cycle This material was developed by Duke University,
Construction, Testing, Documentation, and Installation Chapters 15 and 16 Info 361: Systems Analysis and Design.
Component 3-Terminology in Healthcare and Public Health Settings Unit 15-Overview/ Introduction to the EHR This material was developed by The University.
Special Topics in Vendor- Specific Systems EHR Go-Live Strategies This material (Comp14_Unit8) was developed by Columbia University, funded by the Department.
Component 8 Installation and Maintenance of Health IT Systems Unit 4 Structured Systems Analysis and Design This material was developed by Duke University,
Copyright © 2016 Wolters Kluwer Health | Lippincott Williams & Wilkins Chapter 18: Design Considerations for Healthcare Information Systems Chapter 18:
Unit 8.2: Effective Implementation Planning HIT Implementation Planning for Quality and Safety Component 12/Unit 81 Health IT Workforce Curriculum Version.
Component 8 Installation and Maintenance of Health IT Systems Unit 10 Developing a Test Strategy and Test Plan This material was developed by Duke University,
Working with Health IT Systems HIT System Planning, Acquisition, Installation, & Training: Practices to Support & Pitfalls to Avoid Lecture a This material.
Working with HIT Systems Unit 8a: HIT system planning, acquisition, installation, and training: Practices to Support & Pitfalls to Avoid This material.
This material was developed by Oregon Health & Science University, funded by the Department of Health and Human Services, Office of the National Coordinator.
This material was developed by Duke University, funded by the Department of Health and Human Services, Office of the National Coordinator for Health Information.
Working with HIT Systems Unit 8b: HIT system planning, acquisition, installation, and training: Practices to Support & Pitfalls to Avoid This material.
Operational and Postimplementation
Fundamentals of Workflow Analysis and Process Redesign Unit Process Change Implementation and Evaluation.
ASTRA Update Sunflower Project Statewide Management, Accounting and Reporting Tool (SMART) February 12, 2009.
Component 8 Installation and Maintenance of Health IT Systems
Working with HIT Systems
Unit 8a: The Implementation Team HIT Implementation Planning for Quality and Safety This material was developed by Johns Hopkins University, funded by.
Unit 7a: Workflow Assessment Safe Workflow Design This material was developed by Johns Hopkins University, funded by the Department of Health and Human.
Physician Adoption of HIT AHRQ 2007 Annual Meeting September 26, 2007 Melissa M. Goldstein, JD Department of Health Policy School of Public Health and.
Component 8 Installation and Maintenance of Health IT Systems Unit 9b Creating Fault-Tolerant Systems, Backups, and Decommissioning This material was developed.
Installation and Maintenance of Health IT Systems Unit 8a Troubleshooting; Maintenance and Upgrades; and Interaction with Vendors, Developers, and Users.
Patricia Alafaireet  Lecture 2 – Implementation and go-live strategies Data conversion Communication Planning Downtime.
Patricia Alafaireet Patricia E. Alafaireet, PhD Director of Applied Health Informatics University of Missouri-School of Medicine Department of Health.
Installation and Maintenance of Health IT Systems Troubleshooting; Maintenance and Upgrades; Interaction with Vendors, Developers, and Users Lecture a.
Installation and Maintenance of Health IT Systems Developing a Test Strategy and Test Plan This material Comp8 _Unit10 was developed by Duke University,
Quality Improvement HIT Implementation Planning for Quality and Safety Lecture b This material (Comp12_Unit9b) was developed by Johns Hopkins University,
ITIL: Service Transition
Migration to an Electronic Health Record System
M ERP (Enterprise Resources Planning)
Information Systems Selection
Electronic health record (EHR) software selection and purchase
Operational and Postimplementation
Electronic health record (EHR) software selection and purchase
Installation and Maintenance of Health IT Systems
Component 11 Unit 7: Building Order Sets
{Project Name} Organizational Chart, Roles and Responsibilities
Presentation transcript:

Component 8 Installation and Maintenance of Health IT Systems Unit 11 Pilot Testing and Full-Scale Deployment This material was developed by Duke University, funded by the Department of Health and Human Services, Office of the National Coordinator for Health Information Technology under Award Number IU24OC

What We’ll Cover Pilot testing –Identifying pilot group –Installation, training users –Gathering and prioritizing feedback, revising project plan as needed Planning deployment to end users –“Big bang” vs. phased rollout –Pre-loading legacy data –Tips for success –Re-evaluating usage & capacity of system resources under production conditions Component 8/Unit 11Health IT Workforce Curriculum Version 2.0 Spring

Pilot Testing Trial run of procedures, instruments, & software planned for deployment Pilot group(s) composition dependent upon organization’s size & structure. –Consider steering committee for selection. –Ensure adequate cross-section of users. –Readiness assessment: Assess staff’s technical capabilities & ability of current practice management technology to meet needs. Component 8/Unit 11Health IT Workforce Curriculum Version 2.0 Spring

User Training Adequate training is crucial to success. Consider: –Scheduling within 2 weeks to help users retain skills –Scheduling both initial training and subsequent updates for complex tasks, e.g. physician documentation –Customizing training to meet specific needs of distinct user groups Component 8/Unit 11Health IT Workforce Curriculum Version 2.0 Spring

User Training: Strategies & Styles Choose a combination. –Train the Trainer –Classroom-style –Web –One-on-one Component 8/Unit 11Health IT Workforce Curriculum Version 2.0 Spring

Treat it as a mini-rollout. Being a pilot site requires flexibility on timelines and functionality. Devise contingency plans. IT support resources must be committed and immediately available after go-live. Component 8/Unit 11Health IT Workforce Curriculum Version 2.0 Spring Pilot Group Training and Implementation

Pilot Group Training and Implementation (cont’d) Standardized communication process, with single liaison Formalize orientation process for new members, outlining policies and procedures that underlie decisions made at organizational level. Consider rolling out more complex modules (e.g. charge capture) later on, after user confidence & familiarity have grown. Involve everyone in decision-making: physicians, nurses, admin, financial, etc. Component 8/Unit 11Health IT Workforce Curriculum Version 2.0 Spring

Pilot Group Training and Implementation (cont’d) Medication dosages and instructions in EHR should be reviewed by independent experts. Pilot testers should report potential mistakes. System stability is essential for building user confidence in system, even during pilot & beta phases. Component 8/Unit 11Health IT Workforce Curriculum Version 2.0 Spring

Learning from Your Pilot Test Review pilot user feedback & make necessary adjustments. Develop surveys addressing: –Workflow changes –Interface problems, adjustments needed –Data errors or failure Keep journal of experiences & processes. Conduct post-implementation review. Component 8/Unit 11Health IT Workforce Curriculum Version 2.0 Spring

Pre-Loading Legacy Data: Typical Options 1.None –All visits after go-live use EHR. –Paper charts frequently accessed. 2.Limited –Pre-load commonly-referenced data, e.g. meds, conditions, immunizations, allergies. –Reduces need to pull paper charts for most visits. 3.All data from last year –Vendor should assist due to high data volume. –Paper charts retained for reference. Component 8/Unit 11Health IT Workforce Curriculum Version 2.0 Spring

Planning Implementation: “Big Bang” vs. Phased Difficult decision “Big Bang”: whole organization at same time –Pro: finish quickly; avoid separate processes for same task. –Con: size of project can cause chaos (especially in large organizations). Phased: users &/or functions introduced over time –Consider less-interactive functions first; e.g. scanning, result reviewing. Component 8/Unit 11Health IT Workforce Curriculum Version 2.0 Spring

Implementation Tips Train, evaluate, & support users throughout process. –Essential for optimizing user efficiency, effectiveness, & system adoptability –Builds user confidence Test system thoroughly, before & after final roll-out. –Resolve issues, problems, bugs ASAP. Component 8/Unit 11Health IT Workforce Curriculum Version 2.0 Spring

Implementation Tips (cont’d) Users determine success. –Support them from beginning, through training, and into post-implementation support. Ultimate goal is NOT to implement health IT –… but to maximize efficiency, quality, & effectiveness of care. Be proactive in organizational policy. –Facilitate user adoption through training and continued support. Component 8/Unit 11Health IT Workforce Curriculum Version 2.0 Spring

Closing the Gap: Post-Implementation Maintenance and update phase begins. Repeat baseline system performance test. Continue support and development. Solicit user feedback. –Resolve issues promptly, and consider suggestions for improvement. Hold meetings: –Project review (stakeholders, key players) –Customer acceptance (vendor) Component 8/Unit 11Health IT Workforce Curriculum Version 2.0 Spring

Summary Pilot Testing: A process involving user testing designed to catch and correct potentially costly errors before they are magnified through full deployment. Training Methods – Train the Trainer –Classroom-style –Web –One-on-one Component 8/Unit 11Health IT Workforce Curriculum Version 2.0 Spring

Summary Implementation Methods –Big Bang –Phased Implementation tips –Understand the REAL goal –User adoption Post implementation –Baselines –Maintenance and Upgrades –Reviews Component 8/Unit 11Health IT Workforce Curriculum Version 2.0 Spring

Reference Kenneth G. Adler. “How to Successfully Navigate Your EHR Implementation.” Fam Pract Manag Feb;14(2): – Cliff Fullerton et al. “Lessons learned from pilot site implementation of an ambulatory electronic health record.” Proc (Bayl Univ Med Cent) October; 19(4): 303–310. – “Transferring Legacy Data — Start with the Essentials.” Rhode Island Quality Institute. – “The Design and Implementation of a Computerized Patient Record at the Ohio State University Health System – A Success Story.” HIMSS. – Trevor Huffmaster & Michelle L. Holmes. “Selecting and Implementing a Communitywide EHR, Part 2.” Hospitals & Health Networks. – D/Article/data/Spring2008/080618MW_Online_Huffmaster&domain=HHNMOSTWIRE Dhttp:// D/Article/data/Spring2008/080618MW_Online_Huffmaster&domain=HHNMOSTWIRE D Component 8/Unit 11Health IT Workforce Curriculum Version 2.0 Spring