Central Office Appraisal Branch Presents: Preparation of a Project Report Form TC 62-75 Instructors, Ron Terry & Ron Carrico.

Slides:



Advertisements
Similar presentations
Section 4(f) and Section 6(f) Updates questions to:
Advertisements

Introduction to EIS/EA Managing the Environmental & Project Development Process Presented by the Ohio Dept. of Transportation.
E-Commerce Unit 06 A/601/7313 LEVEL 3
RFP vs. IFB A BASIC APPROACH TO THE BID PROCESS – WHEN RFPs or IFBs ARE USED 2010 AASBO Spring Pre-Conference Workshop Rosa Saenz, PGPC, Inc. Bill Munch,
Preparing a Grant Proposal: Some Basics
REPORTING APPRAISAL OPINIONS Chapter 16. Assumptions Certification Limiting Conditions Fannie Mae Form 1004 Fannie Mae Form 2055 Fannie Mae Form 2070.
Real Property Disposition Dudley Whyte and Tiffany Gallegos Region IV and Region VIII May 19-21, 2014.
Acquisition of partial interest EASEMENTS. Does USPAP require a definition of the rights being appraised? Std Rule 1-2(e) Identify the characteristics.
Maine Department of Health & Human Services February 26, 2009 Wells, Maine Division of Environmental Health Subsurface Wastewater Program VOLUNTARY INSPECTOR.
Genius online Appraisal Management System 1. Appraiser Configuration Getting Started Appraisal Management let the user to effectively conduct a users.
Automating Tasks With Macros
XHTML1 Tables and Lists. XHTML2 Objectives In this chapter, you will: Create basic tables Structure tables Format tables Create lists.
Understanding Right of Way Process Dawn Haecker - Training & Technical Support Supervisor INDOT Trent Newport - VP, CrossRoad Engineers.
Report Writing Format.
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT August 21, 2014.
BY Karen Liu, Ph. D. Indiana State University August 18,
RESEARCH METHODS Lecture 44. REPORT WRITING Every report is custom-made, yet some conventions of format. Many companies and universities also have in-house,
Community Development Department GRAND HAVEN DEVELOPMENT OF REGIONAL IMPACT City Council June 3, 2014.
Billie Smith GSFC Procurement Operations Division December 8, 2004 Prenegotiation Position and Price Negotiation Memorandums.
Preparing Written Reports Effective Communication in Chemical Engineering Freshman Design.
Serious Accident Investigation REPORTS. Lesson 12 Objectives Use a template to correctly fill out a 24-Hour Preliminary Report and list all the steps.
BASIC IRRS TRAINING Lecture 7
IAEA International Atomic Energy Agency. IAEA Outline Learning Objectives The Mission Report Purpose and objectives What is not needed? Evolution of the.
1 The Impact of SAS 112 on Governmental Financial Statement Audits GAQC Member Conference Call January 4, 2007 Presented by Chuck Landes, CPA.
CHAPTER 3 SCOPING AND AGENCY COORDINATION. Scoping - the procedure for determining the appropriate level of study of a proposed project/activity - process.
Project Scoping Fundamentals Alan Lively Project Delivery Specialist Local Government Section April 6, 2010.
Understanding Meaning and Importance of Competency Based Assessment
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Region 9 Design-Build Project (PIN , D900020) Broome, Delaware,
Thou Shall It’s Appealing For Short Takin’ Care of Business Odds & Ends
Chapter 4 Letters: Establishing and Maintaining Relationships.
Understanding Right of Way Process Dawn Haecker, Training & Technical Support Supervisor, INDOT Trent Newport, VP, CrossRoad Engineers.
RECORD OF CONTACTS KELLY DIVINE DISTRICT 3 RIGHT OF WAY SUPERVISOR.
CHAPTER#08 MANAGEMENT OF TECHNICAL PROPOSALS AND SPECIFICATIONS Lecture No. 08 Course: Engineering Management 19 april 2013 MED DEPARTMENT, U.E.T TAXILA.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
Community Development Department GRAND HAVEN DEVELOPMENT OF REGIONAL IMPACT Planning & Land Development Regulation Board May 21, 2014.
2014 AIA Jacksonville Design Awards (Test of Time Award) Instructions Slide Upon downloading file from your please save file as submittal number.ppt.
BUDGET PREPARATION Presented By Sue Muzillo Finance/Grant Unit Coordinator.
2014 AIA Jacksonville Design Awards ( Un-Built-General Category) Instructions Slide Upon downloading file from your please save file as submittal.
Writing the IEE. EA Training Course 2 Writing the IEE IEE Preparation  Suggested steps in preparing an IEE are:  assembling relevant information resources.
Move It Likened to Another By the Numbers One Man’s Opinion Defined By
Submitting Public Comments to the EPA Public Outreach Presentation New Orleans, LA June 26-27, 2014 Holly Wilson U.S. Environmental Protection Agency Office.
1 Waste Discharge Authorization Application - British Columbia WG6 Application Process WG Document Review presented by Helga Harlander October x, 2008.
2015 NAIOP Northwest Florida Development Award Nomination Form Instructions Slide Slide 1 is for instruction purposes only and should not be included in.
Entrances (PE – 300) PRIVATE ENTRANCE - An entrance that serves a single-family residence, farm or other noncommercial or non-industrial property as determined.
1 Module 8 Reporting Results. 2 Learning Objectives At the end of this session participants will:  Understand key points to effectively present results.
Learn Local Quality Preaccredited Teachers Community of Practice Moderation Workshop South East Victoria ACFE Region 5 th August 2015.
Prepared by Tracy R. Herman-Dycus President INSURANCE AUTOMATION (Demo)
Managing 6(f) Conversions: The Good, the Bad, and the Ugly Greenville, SC September 8-11, 2015.
DOCUMENTATION ISO/IEC 17025:2005 Documentation.
Presentation and public hearing review of Zoning Map Amendments pursuant to Zoning Code Rewrite Planning and Zoning Board Hearing.
Prospective Rural Additions Meeting JULY 15, 2015.
1.  Quick Overview of the History and Need  What is Planned for the Fire Department  What is Planned for the Police Department  Financial Details.
Jefferson County Planning Commissioners Hearing June 26, 2013
Washoe County Board of Adjustment
Remove this slide before submitting.
RESEARCH METHODS Lecture 44
Washoe County Board of Adjustment
ISO 9001:2015 Auditor / Registration Decision Lessons Learned
JUST COMPENSATION WHEN LAND IS USED FOR A RELOCATED PROPERTY FEATURE
Annual Professional Development Conference
TECHNICAL WRITING – THE BLENDED LEARNING INITIATIVE
Writing reports Wrea Mohammed
Remove this slide before submitting.
Understanding the Right-of-Way Process
Washoe County Board of Adjustment June 6, 2019
Washoe County Board of Adjustment October 4, 2018
Washoe County Board of Adjustment April 6, 2017
Using the AIM Alternative Testing Module (for Instructors)
Using AIM (for Instructors)
Sustainable Agricultural Lands Conservation Program
Presentation transcript:

Central Office Appraisal Branch Presents: Preparation of a Project Report Form TC Instructors, Ron Terry & Ron Carrico

Project Report Preparation What is a Project Report? Per ROW of the Acquisition Manual 1. A project report is a parcel-by-parcel study of a project. The report is used by Central Office staff to estimate time required for the project. 2. The report also serves as a control measure of quality and cost of appraisals to be written and services to be provided on the project.

Project Report Preparation What is the purpose of the project report? 1. The report is used by KYTC and fee consultants as a guide in preparing bid proposals for various right of way functions. 2. Along with the plans, cross-sections and a visual inspection, the project report gives the staff an overview description of the potential impacts on the parcels involved.

Project Report Preparation Preparing the project report 1. After the final plans are delivered to the district, the ROW Supervisor will assign an experienced agent with a clear understanding of the market condition of the project area to construct the report. 2. The assigned agent will study the plans and cross- sections and do a visual inspection to see that all of the pertinent information is consistent with the information on the plans.

Project Report Preparation Preparing the project report cont. 3. During the visual inspection, the agent will note any changes to the parcels since the plans were created. 4. Once the agent is confident that all reasonable impacts on the subject project were considered, an itemized list of impacts should be tallied and recorded on form TC 62-75, pages 1 & 2.

Project Report Preparation TC Page one consists of the project information in the header and is simply a summary of the total numbers of the requested information. i.e. number of partial/total takes, vacant/improved parcels, etc. Page two is designed to itemize the parcels that the agent recognized during their study of the project.

Project Report Preparation TC 62-75, page two The first eight columns are self explanatory. However, special attention should be observed under the property type column because it may not be clear or potentially transitional. The Remarks column is the body of the report and should contain sufficient information to give a thorough understanding of the appraisal problem.

Project Report Preparation TC 62-75, page 2 cont. Refrain from stating any form of damages as fact since this determination shall be made by the appraiser responsible for writing the appraisal. However, details describing the depth of the take, approximate distances to improvements or any other noticeable affects will be helpful for the Appraiser’s consideration.

Project Report Preparation TC 62-75, page 2 cont. The Complexity Rating column list three options. 1. BV (Before Value): This rating is used when there is no after value, i.e. total acquisition. 2. BAV (Before and After Value): This rating is used on a partial acquisition which presents a complex appraisal problem. 3. MINOR: This rating maybe used for either a partial or a total acquisition.

Project Report Preparation TC 62-75, page 2 cont. The column Recommended Format instructs the appraiser to complete the appraisal using the RWUMS form format or to complete it a Narrative report with sheet 16 and upload it into the RWUMS system for review.

Project Report Preparation Impacts that the writer should acknowledge 1. Proximity damage 2. Cut and Fills 3. Is septic system impacted? 4. Are Site Improvements impacted? 5. Will project potentially change H&B Use? 6. Over improvement on remainder. 7. TE or PE potential damage 8. Loss of parking

Project Report Preparation Quiz In your table groups, review the plans and strip map for parcel 21 and prepare to discuss any potential impacts that you recognize as noteworthy.

Project Report Preparation What impacts did you Note? 1. Additional parking area 2. Septic lines taken 3. Proximity of proposed take to house 4. Heath Dept. site evaluation for septic replacement 5. Possible uneconomic remnant if septic cannot be replaced.

Project Report Preparation Questions or Comments?