Preliminary Hydrogeologic Evaluation Part #1 Cedar Ridge Estates Application for Comprehensive Permit Under MGL Ch40B Residential Development www.greenviewrealty.com.

Slides:



Advertisements
Similar presentations
Groundwater Mounding and Minnesota ISTS Rules MPCA 2/21/06.
Advertisements

It’ll Go With the Flow Goals: To teach students how to construct a water table elevation contour map. To help students understand how such maps can be.
Bliss Area Sewage System Groundwater Monitoring Pete Ganzel Washington County Department of Public Health & Environment.
Claremore Medical Office Building From Landfill to Medical Office Building A Brownfield Success Story THE GREEN SIDE OF BROWNFIELD REMEDIATION.
Every block of stone has a statue inside it, and it is the task of the sculptor to discover it. ~ Michelangelo Presented By: Dallas Whitmill, P.E.
Further Site Investigation Sutton Walls Former Landfill
SANITARY SEWER EXFILTRATION & INFILTRATION RISK ASSESSMENT Meredith S. Moore Penn State MGIS Program Advisor: Dr. Barry Evans GEOG 596A, Fall 2014.
Large Subsurface Treatment Systems in Minnesota Brett Ballavance, P.E. MPCA, Duluth.
Byram Township NJDEP Matching Grant Groundwater Assessment John Robinson, PG, CPG Hydrogeologist GeoEnvironmental Research.
Federal Mogul Department for Environmental Protection Kentucky Division of Waste Management February 10, 2015 Presented by Chris Jung To Protect and Enhance.
PRESENTED BY PETER A. SALPAS, PH.D., SALPAS CONSULTING, INC. WITH PATRICIA J. HALSEY, U.S. DEPARTMENT OF ENERGY DEIDRE THARPE, RESTORATION SERVICES, INC.
1 FORMER AIR FORCE PLANT 36 BACKGROUND INVESTIGATION Prepared for: Air Force Center for Environmental Excellence and Aeronautical Systems Center.
Identifying Sensitive Aquifers in Ohio Chris Kenah, Michael. W. Slattery, Linda. D. Slattery, and Michael Eggert Ohio EPA, Division of Drinking and Ground.
Sustained Compliance for Public Water Systems, Chapter 2, Workshop Department of Environmental Conservation Drinking Water Program Anchorage, September.
Approved Due Diligence Scope Property Survey Topographic Survey Geotechnical Exploration Streams and Wetlands Threatened & Endangered Species Cultural.
Former Landfill Environmental Management Plan Update May 8, 2012.
Rhode Island Department of Environmental Management
Feasibility Study of Constructed Wetlands for Wastewater Treatment and Wildlife Habitat Luna County, NM Public Meeting November 10, :00 am Presented.
EnviroSense, Inc. An Overview of Environmental Factors in Developing Brownfields Sites in Massachusetts Presented By: Eric S. Wood, P.Hg., PG, LSP President.
Saturated thickness and thickness change over time are important parameters used to model and manage the High Plains aquifer. Insight into how these parameters.
Investigating Ground Water Contamination at Ohio’s C&DD Landfills Aaron Shear Ohio’s Solid Waste and C&DD Program Annual Meeting May 9, 2013.
General Services. About Chastain-Skillman, Inc. Founded in 1950 Headquarters in Lakeland, FL with offices in: Tampa Tallahassee Sebring Winter Haven Majority.
FSA Groundwater Flow and Solute Transport Model Presentation to Scottsdale Citizens Group March 19, 1999.
1 Case Summary: Electrical Resistance Heating ICN Pharmaceuticals, Inc. Portland, Oregon Jennifer Sutter, Project Manager Oregon DEQ EPA Technology Innovation.
Of Massachusetts Department ENVIRONMENTAL PROTECTION Soil Vapor Intrusion... A Decade of Regulatory Requirements & Experiences Paul W. Locke MA DEP Bureau.
1 NSTAR TRANSMISSION RELIABILITY PROJECT ENVIRONMENTAL BUSINESS COUNCIL UPDATE APRIL 21, 2005.
1 GROUNDWATER REMEDIATION OF A HIGHLY CONTAMINATED BEDROCK SITE - The Oxygen Infusion Phase - J. Morrow D. Side By :
Comprehensive Lakes Plan The Next Phase – Implementation 10/5/20151R.W. Garrett 19 slides Improving Storm Water Management.
Los Osos Community Services District Basin Management Planning and Proposed Work Program June 5, 2008.
7th Avenue and Bethany Home Road Water Quality Assurance Revolving Fund Site August 20, 2013.
Cedar Ridge Estates Green View Realty LLC Is Pleased to Present: Application for Comprehensive Permit 40B Residential Development.
Cedar Ridge Estates Green View Realty LLC Is Pleased to Present: Application for Comprehensive Permit 40B Residential Development.
THE CATHOLIC UNIVERSITY OF AMERICA WASHINGTON DC SOUTH CAMPUS REDEVELOPOMENT ABDO DEVELOPMENT, LLC proposed by ABDO DEVELOPOMENT, LLC designed by TORTI.
Cedar Valley/ Northern Utah Valley July 9, Agenda   Background   Groundwater Hydrology   Current Conditions   Water Rights   Proposed.
Review of Current Conditions Report and Work Plan for Area 1 Presented by The Great Plains/Rocky Mountain Technical Outreach Services for Communities.
Septic Health Initiative Update - Summer 2006.
Cumberland Park CCB Project Virginia Department of Environmental Quality October 9, 2007.
Feasibility of Aquifer Recharge Using Reclaimed Water in the Tampa Bay Area March 31, 2009 Phil Waller, P.E.
Service Learning and Local Hydrogeology in the Classroom An example from Anchorage, Alaska LeeAnn Munk University of Alaska Anchorage.
Source Water Protection and Development - Conflicts and Convergence 2015 New England Water Works Association Symposium Devens, Massachusetts October 22,
7th Avenue and Bethany Home Road Water Quality Assurance Revolving Fund Site February 19, 2013.
Deanna Streifel Environmental Engineering Officer Arnprior Waste Disposal Site Annual Monitoring Results.
Hydrogeologic Analysis of the Delphi Corporation Site, Wyoming Michigan Mark Bryson, Emily Daniels, Sara Nagorsen, Kirk Perschbacher, Joe Root, Jason Stewart,
RI/FS/RD/RA USEPA Region III PADEP Golder Associates Inc. Berks Landfill Superfund Site.
Groundwater Protection Project Greg Robison Project Manager Ed Sullivan Consulting Engineer June 23, 2008.
Former DuPont Barksdale Works Project Update July 14, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
Hydrogeological Background Study Proposed Gravel Pit SE W5M Brent Lennox, M.Sc., P.Geol. Waterline Resources Inc. December 10, 2012.
Jim Stockinger, Erin Eid, Jennifer Maloney and Mike Trojan
Marian Anderson Place Site Update City Commission Special Workshop December 14, 2015.
Marshall Landfill Site.  Patrick Cabbage, Hydrogeologist/Site Manager  Bill Fees, Engineer  Carol Bergin, Public Involvement Coordinator.
Remediating Contaminated Groundwater with Slow-Release Oxidants Remediating Contaminated Groundwater with Slow-Release Oxidants Steve Comfort – University.
Using Insurance to Fund Brownfield Development Technical Issues Geoff Glanders, President August Mack Environmental, Inc.
Your Septic System Designing and its Maintenance.
Fort Detrick Installation Restoration Program Area B Groundwater November 1, 2010 Fort Detrick, Maryland A Sustainable Community of Excellence.
Unity Ground Water Investigation Steve Faryan, USEPA.
Remediation and Redevelopment at the Former Fort Devens, Massachusetts.
Plaistow BOS Meeting 7/24/2017
Proposed Plan for No Further Action
RAPID INFILTRATION BASIN Design and Permitting Services
East Hennepin Avenue Site
Welcome.
MPO School Transportation Working Group
Water Level Maps In The Edwards (BFZ) Aquifer
Well Testing Well Performance Tests Flow Profiles Packer Tests
The inventory of Finnish groundwater resources
Green View Realty LLC Cedar Ridge Estates
Cedar Ridge Estates Application for Comprehensive Permit
Groundwater.
Presenter's Name Community Conversation BPDA-Owned Property: Charlestown Navy Yard Building 108 Spaulding Rehabilitation Hospital Conference Center.
Board of Public Utilities August 17, 2017
Presentation transcript:

Preliminary Hydrogeologic Evaluation Part #1 Cedar Ridge Estates Application for Comprehensive Permit Under MGL Ch40B Residential Development

Green View Realty, LLC 189 Hartford Avenue, Suite 2-1 Bellingham, MA Owner/Project Manager: Green View Realty, LLC Bellingham, MA Architect: Egnatz Associates, Inc. Bolton, MA Attorney: Rubin & Rudman LLP Boston, MA Engineer: Coler & Colantonio, Inc. Norwell, MA

Preliminary Hydrogeologic Study Completed Tasks: Town Records, Multiple Departments DEP File Review Historic Bird Property Reports Projected Tasks: Installation of monitoring wells in proposed treatment area, Survey of existing wells (on both the Former Bird Property and surrounding properties), Sampling of new and some of the surrounding wells, and Development of a groundwater flow & projected mound analysis models.

Page 3, Paragraph (g)

Taken from: Mass GIS Oliver Site Boundaries & WWTF Location Approximate

Well No. 4 ~1.7 miles from Site Well No. 3 ~1.9 miles from Site

Locus CEDAR RIDGE ESTATES Locus Plan Holliston, Massachusetts

B1 B10 B9 B2 B3 MW-1 B6 B B’ ` B8 5 iEP Inc Groundwater Quality Monitoring Wells of the Cedar Brook Aquifer

Well No. 4 ~1.7 miles from Site Well No. 3 ~1.9 miles from Site B1 B10 B9 B2 B3 MW-1 B6 B7 B4 iEP Inc Groundwater Quality Monitoring Wells of the Cedar Brook Aquifer A B B’ ` Bedrock Sand & Gravel Water Table Elevation B1 MW-1 Town Well 4 B8 B5 B8 B6 B7B9 B3 B10 B1 Town Well 4 Town Well 3 Bedrock Sand & Gravel Peat Water Table Elevation All 10 monitoring wells installed by iEP were sampled for VOCs in July and October 1988 No VOCs were detected in any of the wells except B2 iEP concluded that the low levels of TCE and toluene in B2 were most likely attributable to a nearby septic system Method 3 Risk Characterization prepared by Weston & Sampson Engineers, Inc. in 2001 for the Town of Holliston Marshall Street Landfill An elevation survey of 4 wells located in the vicinity of the landfill, indicated that groundwater flow is easterly toward the wetlands VOCs were not present above detection limits, except for 1,2,4-trimethylbenzene which was detected in only one of the wells

B1 B10 B9 B2 B3 MW-1 B6 B7 B4 iEP Inc Groundwater Quality Monitoring Wells of the Cedar Brook Aquifer A B B’ ` B8 B5

END OF SHOW