Two thirds of the earth’s surface is water… The rest we can process! Two thirds of the earths surface is water… The rest we can process!

Slides:



Advertisements
Similar presentations
ThinkEnergyGroup Energy.Personnel.Fast!. Weve engineered a professional approach to energy staffing. ThinkEnergyGroup.
Advertisements

HEAT TRACING SPECIALIST
TITAN Group …….Managing Site Build up for the telecom sector TICS Telecom Projects Consultancy Pvt. Ltd.
ENGINEERING The Future of Our World FIDIC Resources.
Overview October 2013.
Subsidised Studies – BOOTs and All Mark Berger – Director E+PC Engineering & Projects Company Limited South Africa Canada – South Africa Chamber of Business.
World’s largest undeveloped tin deposit in Kazakhstan.
TRIBAL ZONE TRADING Company Profile.
Ministry of Foreign Trade and Investment FOREIGN INVESTMENT BUSINESS OPPORTUNITIES IN CUBA Republic of Slovenia October 15, 2013.
Free Powerpoint Templates Page 1 Free Powerpoint Templates Introduction to Project Management What is a Project? Project Life Cycle Project Management.
1 FOREIGN INVESTMENT IN CUBA Republic of Slovenia October 15, 2013.
Pricing for value Tom Friedman, Principal Deloitte Consulting LLP Global Consulting Leaders Symposium December 5–7, 2007.
Current Trends in Mining Finance: Strategic and Financial Challenges Roy Hinkamper, KPMG LLP April 2013.
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU Case Study Water and Waste Water Infrastructure Northern Ireland.
TIN, TANTALUM AND TUNGSTEN MINING IN RWANDA
Wesizwe Platinum Limited “Wesizwe Platinum – a “first of its kind” Chinese/South African Platinum Mining Partnership” A Presentation at the African Mining.
SMME DEVELOPMENT & PROCUREMENT VALUE CHAIN Transformation Indaba 2012.
4/16/2017 SHERRITT INTERNATIONAL Ambatovy Nickel Project: A Progress Report March 2008.
Month Year Working together to achieve your desired outcomes, by delivering service excellence. Building Engineering Solutions for the optimisation of.
Altynalmas Gold Ltd An Emerging High Margin Eurasian Gold Producer.
ADVANCED MINE SOLUTIONS CANADIAN MINING EXPERTISE ADVANCED MINE SOLUTIONS | Professional Canadian Mining Consultants _____________________________________________________________________________.
1 Anatomy of a Successful LNG Project Gastech 2008 Original Conceptual Photo of EG LNG Train 1.
Over View of Business Diode Technologies Inc., Contact Details: Vivek Kamath 828 Greenbrier Parkway Chesapeake VA Phone:
1 RICS The Royal Institution of Chartered Surveyors London Quantity Surveying & Construction Faculty The Built Environment Group Corporate Professional.
DEPARTMENT OF PRIMARY INDUSTRY, FISHERIES AND MINES Sustainable development and the challenges of the 21 st century Minerals and Energy Mining – not just.
The Importance of Feasibility Studies for Project Financing FINEX 2012.
COMPREHENSIVE PROJECT MANAGEMENT SOLUTIONS © Copyright GIGAFUSION 2011 STRATEGY, ALIGNMENT, METHODOLOGY, WORKFLOWS, FACILITATION, SUPPORT and TRAINING.
StaffingForce ™ Full Service Human Capital Solutions © 2007 StaffingForce
August DISCLAIMER The following information contains, or may be deemed to contain, “forward-looking statements” (as defined in the U.S. Private.
Presentation by Paul Vine In partnership with Version Sabre and Business Continuity Planning.
Free Powerpoint Templates Page 1 Free Powerpoint Templates How do we do it? Class 7.
“YOUR MINING, INFRASTRUCTURE & ENERGY PARTNER IN AFRICA”
A Cleaner Production Project in the South African Paper Industry – Lessons learnt Iain Kerr, MSc (Env. Biotech.) University of KwaZulu Natal, School of.
Presentation at the South African Academy of Engineering Annual Induction Dinner The contribution of the minerals industry to the future of South Africa.
Water Services Trust Fund Financial Support for Improved Access to Water and Sanitation Implementation of UPC Projects 1.
Project preparation and appraisal. Preparation of project report and appraisal are intimately tied up.
WORKING WITH ASIAN DEVLOPMENT BANK  BOARD OF TRADE OF METROPOLITAN MONTREAL September 22 nd 2015.
Tenova Mining & Minerals South Africa (B-BBEE)
YOUNG PROFESSIONALS SEMINAR CIVIL ENGINEERING CHALLENGES Venue: CSIR International Convention Centre Gauteng Date: 22 November 2013 Presenter: Vikash.
Measuring Performance in a Commercial Enterprise Ken Smith Senior Vice President September 12, 2006.
Project Scoping Fundamentals Alan Lively Project Delivery Specialist Local Government Section April 6, 2010.
Two thirds of the earth’s surface is water… The rest we can process! 2011 AND BEYOND.
Earth and Mineral Resources Unit 2 Section B. Renewable and nonrenewable resources Renewable resources Can be replenished over relatively short time spans.
Improving engineering productivity APEGGA. Improving Productivity Mega Projects  History  What is needed  How will it be done  Division of Labour.
WIPO Pilot Project - Assisting Member States to Create an Adequate Innovation Infrastructure to Support University – Industry Collaboration.
. Business Consulting - An Overview  Business consulting indicates both the industry and practice of hiring external consultants to help organizations.
North East Lincolnshire Council delivering change through partnership ( Physical Regeneration, Property and Technical Services Partnership) Planning in.
1 1st PMI AGC Energy Forum: DMS Debates NOCs in the GCC no longer need a PMC on a Project 2 nd June 2010 Essa Al-Ansari.
Hourly Paid Processes Arrowsol8 will be hiring your agents for various processes, from across the globe to provide services such as inbound, outbound.
DESIGN & DETAILED ENGINEERING CONSULTANT
1 Transformation in the Petroleum Industry – The Journey Presentation to the Parliamentary Portfolio Committee for Minerals and Energy 10 MAY 2007 Prepared.
IFG Managed Services Limited (IFG) Oonagh Hayes, CEO Ireland as a platform into Europe.
International Mining Victoria Zonko Leah Levy Haley Zimmerman Victoria Zonko Leah Levy Haley Zimmerman.
Category : Mining All logos and Images mentioned on this slide belong to their respective owners.
Introduction to Project Management Project management.
Nordic transport infrastructure market – modelling and forecasting methods for asset management and business development Markku Riihimäki, Pekka.
PRESENTATION TO STANDING COMMITTEE ON FINANCE
About us Anglo American is global leader in mining platinum, diamonds, coal, base and ferrous metals We operate in Africa, Brazil, Chile and other South.
Future Rail and Road developments
Dr. Mike Rose Sasol Limited GM - SH&E centre
Op Koffiefontein Diamond Mine 07 December 2017.
Enron Energy Services Energy Management Outsourcing Overview
Going digital: our next steps
Project Management Chapter 11.
Controlling Project Cost and Schedule
Deloitte & Touche November 2018.
Road Safety in Azerbaijan: Challenges and Way Forward
Program Introductions Who we are, what and where Clients and Systems
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

Two thirds of the earth’s surface is water… The rest we can process! Two thirds of the earths surface is water… The rest we can process!

Two thirds of the earth’s surface is water… The rest we can process! MDM ENGINEERING IS… o A process engineering and project management company with a 22-year track record o Staffed by skilled professionals with experience in some 16 countries o Africa Focused o Listed on the London Stock Exchange (AIM)

Two thirds of the earth’s surface is water… The rest we can process! MDM’S COMMITMENT TO HEALTH & SAFETY o Total commitment to safety o “ZERO TOLERANCE” to fatalities, LTI’s and recordable incidents o Managing H,S & E is a critical business activity o 6,747,138 fatality free hours in 3 years o 5 lost time injuries in 3 years

Two thirds of the earth’s surface is water… The rest we can process! WHAT WE’VE DONE o The MDM team has over 22 years of operational experience and have been responsible for: 54 Bankable feasibility studies completed → Over 96% of BFS went on to receive third party financing Constructed 52 metallurgical plants → All producing above design capacity Executed projects in 16 countries worldwide → African focused Worked with a cross section of minerals

Two thirds of the earth’s surface is water… The rest we can process! WHAT DO WE DO o Project Evaluation through Scoping Studies Pre-Feasibility Studies Bankable Feasibility Studies o Design - Metallurgical process development and specialised process engineering and design of metallurgical plants o Construction - Construction and commissioning of plants and associated infrastructure o Project Management - Total Project Execution

Two thirds of the earth’s surface is water… The rest we can process! o Manage medium to large size mining projects on an international basis o Focused on Gold Uranium Base Metals – including copper, nickel, zinc and tin Ferro Metals – including manganese and ferrochrome Platinum Industrial Minerals Coal Diamonds

Two thirds of the earth’s surface is water… The rest we can process! HOW WE DO IT o Interactive in-house design, costing and planning with client input o Focused on technical innovation, lateral thinking and attention to detail - creating economic value for our clients o Maintain a close working relationship with clients o Transparent and open book contracting (EPCM) with agreed: Capital Cost Contingencies Fees Cost-Plus Structure Savings shared on an agreed basis

Two thirds of the earth’s surface is water… The rest we can process! MDM – FAST TRACK APPROACH o MDM works closely with clients to develop schedules by: incorporating initial design phase period starting construction whilst design continues – this will result in some minimal equipment changes due to a ‘fast track’ approach o Built 200K TPM gold & 100TPM uranium plant in 23 months (including design) May 2007 – April 2009 o Built 650K & 1.3M TPM gold and uranium tailings retreatment plant in 21 months (including design) April 2008 – January 2010

Two thirds of the earth’s surface is water… The rest we can process! EZULWINI PLANT – BEFORE & AFTER The Beginning Commissioned – 23 months 12 months

Two thirds of the earth’s surface is water… The rest we can process! WHAT WE DO IT WITH - INTELLECTUAL CAPITAL o Over 150 staff comprising: Process Design Drawing Office Project Management Construction Commissioning Commercial o 22 years of technical and financial database on past projects

Two thirds of the earth’s surface is water… The rest we can process! PROJECT FOCUS – OVER LAST 3 YEARS o Built 2.4M TPA gold plant o Built 1.2M TPA uranium hard rock plant o Built 650K TPM gold tailings treatment plant o Built 1.3M TPM uranium tailings treatment plant Flotation

Two thirds of the earth’s surface is water… The rest we can process! FEASIBILITY STUDIES – OVER LAST 3 YEARS o 2 copper and copper/cobalt studies (BFS & DFS) o 7 uranium studies (PFS & BFS/DFS) o 3 gold studies (BFS) o 2 manganese studies (PFS & BFS) o 2 coal studies (PFS & DFS) o 1 platinum study (BFS) High grade material in core

Two thirds of the earth’s surface is water… The rest we can process! WHY MDM ENGINEERING o Significant experience and track record within team o Lessons learnt in challenging logistical environments o Team internationally recognised for well engineered and technically superior plants o Sound financial position o MDM Engineering will deliver on time and on budget

Two thirds of the earth’s surface is water… The rest we can process! Thank You MDM staff induction artwork The MDM team