SC B5 - Protection and Automation Report to the Canadian National Committee of Cigré 2007 Simon R. Chano Protection Specialist Hydro Québec TransÉnergie.

Slides:



Advertisements
Similar presentations
EDF R&D CIM for DA Status, Feedback & Challenges.
Advertisements

Digital Energy Communications GE MDS Communications Network for AMI.
1 The mission of Study Committee A3 is to facilitate and promote the progress of engineering and the international exchange of information and knowledge.
Study Committee Representatives Annual Report December, 2012
WG B4.62 Connection of Wind Farms to Weak AC Networks Working Group Meeting – June 2013, ERCOT Office, Taylor, Texas.
New Energy Horizons Opportunities and Challenges Fault Current Contributions from Wind Plants Dean Miller PacifiCorp July 25,
ADVANCED MANAGEMENT OF A CLOSED RING OPERATED MV NETWORK: ENEL DISTRIBUZIONE’S P4 PROJECT. Simone Botton, Roberto Calone, Luigi D’Orazio, Alessandro Fatica,
Planning, optimization and regulatory issues
Winnipeg, Manitoba, Cigre Canada Annual Membership meeting, October 19, 2008 CIGRÉ – 2008 Update for SC C6 David Jacobson (C6) Manitoba Hydro.
Study Committee A2 Colloquium in Shanghai, September, 2015 Study Committee A2 Colloquium in Shanghai, September, 2015 SC A2 will have their.
CIGRE WG C PRACTICES IN INSULATION COORDINATION OF MODERN ELECTRIC POWER SYSTEMS AIMED AT THE REDUCTION OF INSULATION LEVELS WG Composition: WG.
1 AG.03: CIGRE SC A3 Green Book proposal (based on experience of Brazilian NC to publish CIGRE textbooks) CIGRE SC A3 Green Book Project Team Paulo Fernandez.
Hanover-Fair 2002 IEC The world-wide standard for communication in substations HM IEC   Substation Protocols Benefits Customer.
1 60 th CIGRE Technical Committee meeting Paris France, 1 September th informal CIGRE Technical Committee meeting Montreal Canada, 3-4 October 2012.
1 Study Committee Representatives Annual Meeting October 4, 2009 Toronto SC B4 “HVDC and Power Electronics” Activity Report Presented by: John McNichol.
SC B5 - Protection and Automation Report to the Canadian National Committee of CIGRÉ 2010 Simon R. Chano Protection Specialist Hydro Québec TransÉnergie.
Transmission & Distribution
Jeju, 13 – 16 May 2013Standards for Shared ICT HIS – Smart Grid Karen Bartleson, President, IEEE Standards Association Document No: GSC17-PLEN-72 Source:
Amantegui Javier (SP) CIGRE Study Committee B5 1 CIGRE STUDY COMMITTEE B5: MISSION AND CHALLENGES Javier Amantegui (Spain) Chairman of CIGRE-SC-B5 “Protection.
Jerry FitzPatrick, NIST Chair Wednesday, May 26. Introduction - IKB PAP8 PAP14 DEWG Charter What should the T&D DEWG be doing? T&D DEWG or T and D DEWGs?
CIM Users Group Intro and Benefits Ralph Mackiewicz Chair, Marketing Subcommittee UCA International Users Group October 2007 Austin, TX
Join Us Now at: Enabling Interoperability for the Utility Enterprise And TESTING.
White Papers – publication: IEEE PES Transactions – note these papers are not overly technical, may not be appropriate placement. T&D World – good audience.
Motor Control Center MNS iS with Condition Monitoring
STORIES 3 rd Workshop, Dubrovnik, 2 October 2009 Addressing barriers to storage technologies for increasing the penetration of intermittent energy sources.
IEEE Systems Council VP Technical Operations Status; April 9, 2010 ieeesystemscouncil.org The SC has established a distinguished lecturer program. AESS.
New approach in functionality and testing for HV Capacitor Bank Protection Jorge Cardenas † (J.C.), Sean Cox ♣ (S.C), Petru van Wyk ♣ (P.W.), Boitumelo.
1 Study Committee Representatives Annual Meeting October 19, 2008 Winnipeg SC B2 “Overhead Lines” Activity Report Presented by: Zibby Kieloch (Manitoba.
1 CNC-CIGRE Study Committee Report October 18-20, 2010 VANCOUVER CIGRÉ SC – A3 High-Voltage Equipment Hubert Mercure.
ROAD TRANSPORT RESEARCH, TECHNOLOGICAL DEVELOPMENT AND INTEGRATION (2003 Call)
Protection Specialist
CIGRE Study Committee B5 Colloquium, Calgary September 2005 AREVA T&D Automation Protection & Control of Series Compensated Networks Z Q Bo PART.
PSRC Line Protection Subcommittee Working Group D4
1 Enhancing Eskom Distribution Network Planning 15 October 2007 Dr Clinton Carter-Brown Eskom Industry Association Resource Centre Project Lead.
Common Information Model and EPRI Smart Grid Research
TOS Operating Committee Report Al Badella Technical Operations Subcommittee Chair July 14th, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Prepared By :.  Introduction  Techniques Used  Case Study  Advantages  Application  Conclusion OUTLINE.
Systems Integration Specialists Company, Inc. The Standards Based Integration Company © Copyright 2010 SISCO, Inc. 1 Introduction to SISCO For CIM Users.
1 Data Analytics & Energy Management Systems for Microgrids Reza Iravani Report on Project 1.2 and 2.2 NSMG-Net Annual Meeting.
Toronto, Ontario - Cigre Canada Annual Membership meeting, October 4, 2009 CIGRÉ – 2010 Study Committee Presentation C1 System Development and Economics.
Preferential Subject #3 Protection and Control of Series Compensated Networks S U M M A R Y Special Reporter: Graeme Topham South Africa Study Committee.
Toronto, Ontario - Cigre Canada Annual Membership meeting, October 4, 2009 CIGRÉ – 2009 Activity Report for SC C6 DISTRIBUTION SYSTEMS AND DISPERSED GENERATION.
PagedatoForfatter - Titel1. pagedatoForfatter - Titel2 How to help NC in working towards network for the future  Based on dialogue with the Danish NC.
Session 2, III - Voltage dips and disturbances in customers installations Barcelona May 2003 Activities of Joint Cigré/CIRED/UIE Power Quality Working.
Model of the Permanent Council for OAS Interns - MOAS/PC Nelly Robinson, MOAS Program Coordinator Department of International Affairs Secretariat for External.
1 Study Committee Representatives Annual Meeting October 19, 2008 Winnipeg SC B4 “HVDC and Power Electronics” Activity Report Presented by: John McNichol.
IAEA I&C Activities Presented by Björn Wahlström, Chairman TWG-NPP CI.
SC B5 - Protection and Automation Report to the Canadian National Committee of CIGRÉ 2009 Simon R. Chano Protection Specialist Hydro Québec TransÉnergie.
Cigre / IEC UHV Symposium, New Delhi Strategic Agenda for CIGRE‘s Technical Activities Klaus Fröhlich.
Promoting Decent Work for All 1 Strategic Partnerships for Realizing Decent Work in Asia: ILO-ASEAN Cooperation August 23, 2007 Kee Beom Kim ILO Jakarta.
1 Objectives InnovÉÉ promotes and supports electricity technology innovation Contribute to the strengthening of the Quebec electricity technology innovation.
ABB Power Technologies Network Management ABB Industrial IT for Network Management.
Power Plant Construction and QA/QC Section 4.3 – Electrical Interconnections Engineering Technology Division.
Steady State Analysis Of A Microgrid Connected To A Power System
1 Institute of Electrical and Electronics Engineers Revised January 4, 2011.
1 Integrating Wind Energy into the Electric Grid Wind Power Forum October 26, 2011 Brian Conroy, Electric System Engineering Central Maine Power Company.
Evolution and Prospects of Relay Protection and Automation Systems Evolution and Prospects of Relay Protection and Automation Systems Moderator: Janez.
A SEMINAR ON 400 KV GSS(RRVPNL) BIKANER.
Survey of Smart Grid concepts and demonstrations Smart substation Ari Nikander.
Report of the Electric Operations Steering Committee September 21, 2006.
Power System Protective Relaying-Part One
WG3 Flexible Generation
Intelligent grid expansion – RheinEnergie AG, Germany
Protection Specialist
Study Committee Representatives Annual Meeting October 18, 2010 Winnipeg SC B4 “HVDC and Power Electronics” Activity Report Presented by: John McNichol.
Electricity Distribution Network Design Training & Courses
Protection Philosophy
Karen Bartleson, President, IEEE Standards Association
CNC-CIGRE Study Committee Meeting October 19, 2008 Winnipeg CIGRÉ SC – A3 High-Voltage Equipment Hubert Mercure Hydro-Québec / IREQ.
Presentation transcript:

SC B5 - Protection and Automation Report to the Canadian National Committee of Cigré 2007 Simon R. Chano Protection Specialist Hydro Québec TransÉnergie 800 de Maisonneuve est, 22ième étage Montréal, QC H2L 4M8

Simon R. Chano, Hydro Québec TransÉnergie- 2 - CIGRÉ STUDY COMMITTEES B5Protection and automation  System protection  Substation control, automation, monitoring and recording including internal and external communications, substation metering systems and interfacing for remote control and metering  All technical, organisational and economical aspects are considered including staff education and training.

Simon R. Chano, Hydro Québec TransÉnergie- 3 - B5 Subcommittee Organization SC B5 Chair – Ivan Mesmaeker (CH) SC B5 Secretary – Paul Hindle (UK) Three Advisory Groups (Since August 31 31,2006)  AG 51 – Substation Automation and Remote Control: Convenor J.M. Ordacgi Filho (BR)  AG 52 – Protection of main plants and circuits: Convenor M.S. Sachdev (CA)  AG 53 – Metering, monitoring, recording and overall power system protection: Convenor G.J. Amantegui (ES)  AG 4 – Asset and Information Management: Convenor F. Koers (NL): Prior to August 31, 2006

Simon R. Chano, Hydro Québec TransÉnergie- 4 - AG 51 - Substation Automation and Remote Control WG B5-11 The introduction of IEC and its impact on protection and control within substations  preparing a report – expected completion 2007 WG B5-13 Acceptable functional integration in HV substations  preparing a report – expected completion 2007 WG B5-36 Application for protection scheme basedon IEC  preparing a report – expected completion 2009 WG B5-92 Functional testing of based systems  preparing a report – expected completion 2010

Simon R. Chano, Hydro Québec TransÉnergie- 5 - AG 52 – Protection of main plants and circuits WG B5-02 Coordination of digital relays and conventional instrument transformers  preparing a report – expected completion 2007 WG B5-04 Modern techniques for protecting and monitoring of generating plants  preparing a report – expected completion 2008 WG B5-05 Modern techniques for protecting, controlling and monitoring power transformers  preparing a report – expected completion 2007 WG B5-07 Modern techniques for protecting and monitoring of transmission lines  preparing a report – expected completion 2008

Simon R. Chano, Hydro Québec TransÉnergie- 6 - AG 52 – Protection of main plants and circuits WG B5-10 Protection of series compensated lines and series capacitor banks  preparing a report – expected completion 2007 WG B5-15 Modern applications of distance protection  preparing a report – expected completion 2007 WG B5-16 Modern techniques for protecting busbars in HV networks  preparing a report – expected completion 2007

Simon R. Chano, Hydro Québec TransÉnergie- 7 - AG 53 – Metering, monitoring, recording and overall power system protection WG B5-03 Fault and disturbance data analysis including intelligent systems  preparing a report – expected completion 2007 WG B5-19 Protection relay coordination  preparing a report – expected completion 2007 WG B5-20 New trends for automated fault and disturbance recording and analysis  preparing a report – expected completion 2009

Simon R. Chano, Hydro Québec TransÉnergie- 8 - AG 53 – Metering, monitoring, recording and overall power system protection WG B5-08 Protection and control for dispersed generation and impact on transmission  preparing a report – expected completion 2007 WG B5-34 The Impact of Renewable Energy Sources and distributed Generation on Substation Protection and Automation  preparing a report – expected completion 2008 WG B5-21 New local protection and control approaches to minimize the impact of system disturbances  preparing a report – expected completion 2007 TF B5-94 High impedance faults  preparing a report – expected completion 2007

Simon R. Chano, Hydro Québec TransÉnergie- 9 - Newly Formed WG WG B5-31 Management of protection settings  preparing a report – expected completion 2009 WG B5-37 Protection, Monitoring and Control of Shunt Reactors  preparing a report – expected completion 2010

Simon R. Chano, Hydro Québec TransÉnergie Canadian participation Leadership roles  Simon Chano (HQ)  B5 Canadian Representative  B5-52 Advisory group member  Convenor WG B5-07  Secretary WG B5-15  Corresponding member WG B5-19  Corresponding member B5-05  Federcio Lopez (SNC-Lavalin)  Member WG B5-07  Pouria Naisani  Convenor WG B5-37

Simon R. Chano, Hydro Québec TransÉnergie Canadian participation Leadership roles  Mohindar S. Sachdev (U of Saskatchewan)  Convenor Advisory Group 2  Web Master  Member Strategic Advisory Group of SC B5  Convenor WG B5-05  Member WG B5-07  Member WG B5-15  Member WG B5-17  Brian Sparling  Corresponding Member WG B5-05

Simon R. Chano, Hydro Québec TransÉnergie SC meeting Madrid, Spain  October 15 to 20, 2007  Highlights:  PS1: New Trends on Bus Bar Protection  PS2: Acceptable Functional Integration in Substation P&C for Transmission Systems  PS3: Protection of Transmission Lines & Coordination of Transmission System Protection

Simon R. Chano, Hydro Québec TransÉnergie Concluding Remarks Study committee actively examines protection and automation issues Discusses the issues and provides reports on those issues Promotes power engineering education Conducts tutorials at the SC meetings B5 tries to get participation from utility engineers, consultants and academia

Simon R. Chano, Hydro Québec TransÉnergie Web site SC address : web site is For additional information, you can contact me