1 Presentation to the Parliamentary Portfolio Committee on Water and Environmental Affairs Eastern Basin 28 June 2011.

Slides:



Advertisements
Similar presentations
Submission to the Parliamentary Portfolio Committee on Water and Environmental Affairs Johan du Toit CEO Central Rand Gold 28 June
Advertisements

Greenwich Peninsula.
Landfill Legislation Richard Campbell. INTRODUCTION  Prior to the mid-1980's, waste disposal sites were: sites that no one wanted, ie they were holes.
By: Frank Filas, P.E. Environmental Manager Energy Fuels Resources Corporation 44 Union Blvd., Suite 600 Lakewood, Colorado Uranium Development in.
The COAL AUTHORITY Management of Risks to Groundwater from Past Coal Mining Keith Parker Head of Estates and Environment The Coal Authority.
The Need For A New Conceptual Site Model Peter Strauss December 11, 2013 CPEO’s Moffett-MEW Community Advisory Board Mountain View, California.
Assessing and Communicating Risk: A Partnership to Evaluate a Superfund Site on Leech Lake Tribal Lands Groundwater Movement and Contamination By Cindy.
DEPARTMENT OF MINES AND ENERGY Image positional only placement optional Washout feature in PPP 70/30 Daly River Management Advisory Committee - Katherine.
Dounreay Nuclear and Chemical Land Contamination.
How to Build a Groundwater Model Activity Source Created by the USA Groundwater Foundation; modified from the Science Olympiad event, Awesome Aquifers.
29 August 2013 AMD Debate Technical solutions and funding models for the Acid Mine Drainage problems of South Africa.
The Water Research Commission and Acid Mine Drainage Research Dr Jo Burgess 21 st July 2010.
TRANS-SIBERIAN GOLD PLC 29 June 2015 Annual General Meeting TRANS-SIBERIAN GOLD.
WATER POLLUTION.  Water covers more than 70 percent of the Earth’s surface. While less than 3 percent of this water is drinkable, all of it is necessary.
Witwatersrand AMD Parliamentary Portfolio Committee on Water & Environmental Affairs 28 th June 2011 Overview of Activities by Gold Mining Companies active.
TRP Chapter Chapter 4.2 Waste minimisation.
Mine Rehabilitation at Yerranderie
ONTARIO’S ABANDONED MINES REHABILITATION PROGRAM Presentation for IAEA/CNSC Workshop Elliot Lake, ON May 1, 2014.
Mission 6 Water Winners By: Audrey, Palladio, Landry and Jake.
Investing in the logistics necessary for Africa's Oil and Gas Industry.
1 TRANSNET PAGE National Environmental Management: Integrated Coastal Management Amendment Bill, B Transnet SOC Ltd submissions to the Parliamentary.
Water Stress in China: Shortage and Pollution CHEN Ying Research Centre for Sustainable Development (RCSD) Chinese Academy of Social Sciences (CASS) CASS-Nottingham.
Presentation to Parliamentary Portfolio Committee, 14 September GROUNDWATER AS A COMMUNITY WATER SUPPLY SOURCE MR BONIFACE ALEOBUA DEPARTMENT OF.
Sanitary Engineering Lecture 11. Storm Water Runoff Storm water runoff is the precipitation which seeps into the ground if precipitation occurs faster.
Western Basin and Central Basin involvement Niël Pretorius, CEO June 2011.
PRESENTATION TO PPC STATUS OF GROOTVLEI MINE 13 APRIL 2011.
Tailings and Waste Rock Management Alternatives Study
“MAINTAINING ENVIRONMENTAL INTEGRITY IN MINING ” Tashana Redmond Senior Environmental Officer.
Integrated Constructed Wetlands Regulatory Aspects - the EPA’s role Aoife Loughnane Inspector, Environmental Licensing Programme Environmental Protection.
NRCan Final Hearing Presentation Meliadine Gold Project Kate Cavallaro Senior Environmental Assessment Officer Environmental Assessment Division External.
Submission to the Parliamentary Portfolio Committee on Water and Environmental Affairs John Munro - CEO 28 th June 2011.
Waste Management Strategy Outline - Geography - Future Needs – 5 and 25-Year Time Frames - Capacity - Near-Term Needs - Long Term Needs.
TERRAMIN AUSTRALIA Limited
World Leader in Platinum Expansion : November 2002 PRODUCTION PROFILE Anglo Platinum 28 November 2002.
“ OVERALL DECISION MAKING IN PLANNING FOR REMEDIATION OF URANIUM MINES” Presentation to the Senior Regulator’s meeting at the 56 th IAEA General Conference.
1 Date: 21/22 June 2011 Presentation to Parliamentary Portfolio Committee on Water Affairs.
Frederic Guerin General Manager, Mine Projects AREVA Resources Canada Inc. Iqaluit April 19, 2012 The Kiggavik Project: Challenges in designing uranium.
Open Pit Mining. Explanation: Open-pit mining, also known as open-cut mining, and strip mining, refers to a method of extracting rock or minerals.
1 PRESENTATION TO THE PORTFOLIO COMMITTEE ON THE OVERVIEW OF THE NDPW PRESENTED BY THE TOP MANAGEMENT COMMITTEE 26 MAY 2004.
Mineral Exploration and Development
PRESENTED BY : DATE: TEL: Overview of acid mine drainage impacts in the West Rand Goldfield Presentation to the Director General of DWAF: 2 February.
Gowanda Area Redevelopment - Peter Cooper P roject Prepared by M. Hutchinson Peter Cooper Factory 1970.
MNM Fatal /14 Fall of Material Accident Fall of Material Accident August 12, 2010 (Nevada) August 12, 2010 (Nevada) Underground Gold Mine Underground.
1 CONCISE UPDATE ON ACID MINE DRAINAGE IN THE WITWATERSRAND April 2012 UPDATE BY Mr. MARIUS KEET.
Adv Boyce Mkhize & Orion Phillips National Nuclear Regulator
URANIUM: The Mines & Radioactive Waste Left Behind.
1 PROGRESS REPORT ON THE MANAGEMENT OF ACID MINE DRAINAGE (AMD) IN THE WITWATERSRAND MINING REGION Portfolio Committee: Water and Environment Cape Town,
1 Presentation to the Portfolio Committee on Water Affairs and Forestry 7 August 2006 Nikisi Lesufi Environmental Adviser Chamber of Mines of South Africa.
Using the Destination Scheduler Underground at Olympic Dam Xpac Symposium May 2005 Stuart Mills Long Term Scheduler.
TRANS-SIBERIAN GOLD PLC 30 June 2016 Annual General Meeting TRANS-SIBERIAN GOLD.
NRCan Community Roundtable Presentation Meliadine Gold Project Rob Johnstone Deputy Director Sustainable Mining and Materials Policy Division Minerals,
TRANS-SIBERIAN GOLD PLC Annual General Meeting
QKR Namibia Navachab Gold Mine
Acid Mine Drainage (AMD)
Work Health & Safety Legislation
MATTERS RELATING TO THE LIQUIDATION OF PAMODZI
Blandy Experimental Farm Educational Center
The Stringfellow Acid Pits
Scientific or Engineered Landfilling of Waste
Mining.
Extraction of Uranium & the environmental impacts
Water Statistics and Water Account in Jordan
Chapter 11 Section 3 Using Water Wisely.
What is acid rock drainage?
Western, Central and Eastern Basin LONG TERM SOLUTION TO AMD
Hydrologic Investigation Summary
MSA CONTRIBUTION TO AMD SOLUTION - Parliament (28 June 2011)
Presentation to the Portfolio Committee: Water& Environment
STATUS OF GROOTVLEI MINE
Nikisi Lesufi Senior Executive Chamber of Mines
Presentation transcript:

1 Presentation to the Parliamentary Portfolio Committee on Water and Environmental Affairs Eastern Basin 28 June 2011

 Gold One’s operations are situated on the East Rand and are associated with the Eastern Basin only  Gold One’s activities are not responsible for the Eastern Basin AMD problem  Modder East:  Construction of the new Modder East mine commenced in May 2006  Commercial production was declared in December 2009  Ramp up to full production is still on-going  Sub Nigel:  Sub Nigel Mining Company Limited was acquired by Gold One in 2006  Assets included the Sub Nigel No. 1 Shaft, which had been on care and maintenance for many years  Mining right was granted in 2008  Shaft was recommissioned and first ore was hoisted in January Operations

 Modder East had the option of either utilising the existing Grootvlei infrastructure or building a new mine to access the orebody  Gold One elected to build a totally new mine at a cost of R1.1 billion that would be disconnected from the Eastern Basin and historical underground workings, rather than inherit the legacies of the past  The underground workings at Modder East are not connected, and will not at any point in time in the future be connected, to the Eastern Basin or to any historical underground workings  Modder East is therefore not impacted by the water in the Eastern Basin  All potential impacts on groundwater volumes and quality were identified and an amended Environmental Management Programme was approved in 2007  EMP does not provide for any pumping of water  Modder East has a water use licence and is a zero discharge site  Waste rock is sold as aggregate resulting in a very small rock dump  A tailings facility has been built on the footprint of an old tailings facility to minimise the pollution plume 3 Steps Taken at Modder East

Extracts from Modder East’s 2006 groundwater specialist study:  The current state of knowledge suggests that the planned Modder East Mine will have a very limited impact on this aquifer system and the nearby water resources, provided that certain important hydrogeological management principles are followed.  The most important of these is to allow the mine to flood within two years of closure.  Provided that certain water and ore management measures are put in place, no acidification in the mine will occur during the operational and flooding phases. 4 Ground Water Study

 Number 1 Shaft at Sub Nigel is currently connected to the historical underground workings of the Eastern Basin  The shaft was recommissioned in 2008/2009 at a cost of R29 million to operate primarily as an underground training school  Given the shaft’s connection to historical underground workings, all mining to date has been conducted above the water in the Eastern Basin to prevent any new contribution from Sub Nigel to the Eastern Basin’s water level  Gold One has ensured that no surface water has been introduced to the underground workings and no water has been or is pumped to surface  Sub Nigel does not have a tailings or a waste rock dump – ore is treated at Modder East  Sub Nigel’s current underground workings are under threat by reason of the cessation of pumping at Grootvlei  Gold One is considering plugging the shaft and mining a reef above the plug  New workings will not connect to historical underground workings, thus eliminating any future effect from the operation on AMD in the Eastern Basin 5 Steps taken at Sub Nigel

6 Discussion