LHC (and ATLAS) Status and Plans

Slides:



Advertisements
Similar presentations
TC meeting /11/14TC meeting2 ALICE LS1 plan from now till MarchWeeks Install TRD infrastructure46 TRD4&5 (and counterweights removal)47.
Advertisements

(ATLAS) Higgs Prospects at HL-LHC. ATLAS CMS ALICE LHCb Center-of-Mass Energy ( ) 7 TeV Center-of-Mass Energy (Nominal) 14 TeV ? Center-of-Mass.
1 st International Conference "Discoveries of Higgs and Supersymmetry to Pioneer Particle Physics in the 21st Century" Concluding Remarks (LHC Status)
Test Beams Around the World (well, a very small world…) CERN (transparencies from Horst Breuker from CERN AIDA meeting) DESY (transparencies from Norbert.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
KEK Test Beam Phase II Plan Makoto Yoshida (Osaka Univ.) MICE FT Daresbury 2005/8/30.
Status & Goals of LHC 1 1pb-1 of delivered and recorded luminosities reached! As of this morning: Delivered: 1420 nb-1 Recorded: 1245 nb-1 New record Inst.
Dr. José Miguel JIMENEZ LS2 Coordinator LHC Performance Workshop (Chamonix 2014) Session 8 - Long Shutdown 2 Strategy and Preparation Chair: José Miguel.
E166 Collaboration J.C. Sheppard SLAC, October, 2003 E166 Background Test Beamtime Request J. C. Sheppard.
13 Nov 2007 Analysis PC 13 Nov Analysis PC Schedule 2007/ 08 Tuesdays alternate weeks, 16:30 – 18:00 GMT, with ad hoc exceptions 30 October  13.
19 March 2012Muon Week - Operations1 Muon Week Muon Operations Session Introduction Status and LHC Schedule Detector Readiness + Preparation for Physics.
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
CDF perspectives and Computing needs KISTI, Dec 5 th 2008 DongHee Kim.
Critical role of group for timely first physics publication on MinBias Physics (Phys.Lett B (2010) 21 Technical : Understanding tracking, vertexing,
WLCG Collaboration Workshop, “Gotham City”, May 2012 Introduction WLCG Collaboration Workshop, “Gotham City”, May 2012 Introduction.
M. Gilchriese ATLAS Upgrade Introduction January 2008.
Status and outlook of the Micromegas modules D. Attié, D.S. Bhattacharya, P. Colas, S. Ganjour, et al. LCTPC Collaboration meeting DESY, 30/05/2014.
All Experimenters’ Meeting November 03, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting February 09, Accelerator Operation Summary Calendar Week # 06 NuMI Weekly Integrated Intensity 6.69 E18 protons Beam.
P. 1Mario Deile – Summary of Likely Running Scenarios ScenarioInelastic PileupLuminosity [cm  s  ]  * = 90 m with crossing angle  < – 10.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Mecklenburg County Public Schools Benchmark Schedule 2012 – 2013 June 13, 2012.
Cosmic-ray session summary David Berge 12. Feb 2013.
ICHEP / 24 Status Report of CERN Axion Solar Telescope (CAST) Experiment Dieter H.H. Hoffmann (Tech. University Darmstadt & GSI – Darmstadt) on.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
NLC Status and Milestones D. L. Burke ISG9 KEK December 10-13, 2002.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Plan. 12/05/ Who are we? PM (Project Management and Resource Planning) – APT – IMPACT – PPTEU2 – Plan LS1 – 2012 –…–… Plan V2 – From LS1 to LS2.
Director’s Review 5/5/03 Spalding DRAFT RLS 1 Project Planning  Documentation to DOE June 1  DOE Review ~July 22 Documents Summary Project Overview,
MOM Report Paul Hodgson Paul Soler Victoria Blackmore VC-139: 14/04/111/8.
Alain Blondel MICE VC 12 March 2009 Brief MICE news 1. Decay solenoid: operations will restart in early July. Criteria for acceptance have been specified.
Post-DC2/Rome Production Kaushik De, Mark Sosebee University of Texas at Arlington U.S. Grid Phone Meeting July 13, 2005.
1 PHENIX WEEKLY PLANNING December 3, 2015 Carter Biggs.
All CMS 30 May07 TSV1 All CMS 3 30 May 2007 LHC machine CMS Progress Overall Schedule.
RBAC Content: LHC Operational Mode Piquet Roles RBAC Strict LHC Operational mode and CMW Acknowledgements: Pierre C., Wojtek S., Stephen P., Lars J., Verena.
March 18, 2008 TJRMICE Beamline Status1 MICE Beamline Status (March 18, 2008) Tom Roberts Muons, Inc. Illinois Institute of Technology.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
Status and plans for role of Japan in HL-LHC Katsuo Tokushuku Institute of Particle Nuclear Studies (IPNS) High Energy Accelerator Research Organization.
All Experimenters’ Meeting January 26, Accelerator Operation Summary Calendar Week # 03 NuMI Weekly Integrated Intensity 2.74 E18 protons Beam.
2nd annual ARTEMIS meeting Le Carré des Sciences Paris 3-4 July 2008 Rosy Nikolaidou CEA Saclay.
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Commissioning Schedule and Shifts – First Call E906 Collaboration Meeting 23 February 2010.
1 LHC and CMS Status Robert M. Harris Fermilab Fermilab All Experimenters Meeting Nov. 10, 2008.
New Trigger Strategies Discussion Perimeter Institute HL-LHC Workshop June 8, 2015 Eva Halkiadakis, Matt Strassler, Gordon Watts.
From the Standard Model to Discoveries - Physics with the CMS Experiment at the Dawn of the LHC Era Dimitri Bourilkov University of Florida CMS Collaboration.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
1 Arnold Pompoš, SUSY03, Tucson, Arizona, June 5-10, 2003.
LHC Machine Status Report Mike Lamont for the LHC team Acknowledgements: Mirko Pojer, Matteo Solfaroli, Katy Foraz et al.
March 4, 2013 Photo by Martin Murphy. Shutdown 2012 Machine Status: Linac running with NTF Treatments, RFQ and Linac commissioning Booster beam commissioning.
Run II preparations Test beam plans Moving from 156 to 169 DT-LHCb coordination meeting June 2, 2015.
G 0 Project Coordinator Report Joe Grames “Big Picture” Schedule Preparations Polarized Source Injector Accelerator Hall C Accelerator Plans for 687 MeV.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC Calendar for 2004   March   May   30 June -1 July  
Preparation for Running Outline Present Schedule Detector Preparation Requests for dedicated runs –Cosmics, Splashes, Alignment Muon Shifts Experts A.
Booster Status, September 4, 2003 – E. Prebys 1 Frantic Shutdown Preparations Continue…
TDAQ and L1Calo and Chamonix (Personal Impressions) 3 Mar2010 Norman Gee.
ATLAS Italia – IBL G. Darbo – INFN / Genova CERN, 2 March 2011 o IBL ATLAS Italia / Referee CERN, March 2 nd 2010 G. Darbo – C. Meroni INFN / GE – MI Agenda:
WP2 (Detector development) Summary Gabriella Pugliese INFN – Politecnico of Bari.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
CERN’s Large Hadron Collider
Various Gave presentation at TIG meeting on p5 control room. Feedback included… Proposal should explicitly cover all phases of CMS operations Running.
LHC during week 45 LHC delivered ~0.837 fb-1 in week 45
LHC schedule.
As energy coordinator for CERN Accelerators & Technology
Completing the Step IV Programme
Baby MIND beam test status
Status of the CBM Experiment – Key Dates for CBM Magnet
LHC nuova schedule dopo Chamonix
LS 1 start date 12th June Schedule Extension 2012 run Extension of 2012 run approved by the DG on 3rd July 2012.
Presentation transcript:

LHC (and ATLAS) Status and Plans Chicagoland LHC Workshop University of Illinois (UIUC) Feb 11, 2015 Mark Neubauer University of Illinois at Urbana-Champaign

From Dusk Till Dawn… … Run 1 Dusk Run 2 Dawn Present state Latin for “Make haste slowly”. Proper balance of urgency and diligence Mark Neubauer Chicagoland LHC Workshop / UIUC / Feb 11, 2015

LHC Status / Plans Mark Neubauer Chicagoland LHC Workshop / UIUC / Feb 11, 2015

LHC Schedule: The Big Picture LS = Long Shutdown Phase-I Install Latin for “Make haste slowly”. Proper balance of urgency and diligence The HL-LHC running starts in 2025 and continues beyond LS4 until 2035 Mark Neubauer Chicagoland LHC Workshop / UIUC / Feb 11, 2015

LHC Schedule through 2015 2015 LHC Schedule 2 week slip Latin for “Make haste slowly”. Proper balance of urgency and diligence Expect 1st beam in the week starting March 23! Physics Mark Neubauer Chicagoland LHC Workshop / UIUC / Feb 11, 2015

LHC Schedule through 2015 2015 LHC Schedule (cont.) Mark Neubauer Latin for “Make haste slowly”. Proper balance of urgency and diligence Physics Mark Neubauer Chicagoland LHC Workshop / UIUC / Feb 11, 2015

LHC Magnet Powering Tests NOT STARTED NOT STARTED NOT STARTED Latin for “Make haste slowly”. Proper balance of urgency and diligence NOT STARTED Mark Neubauer Chicagoland LHC Workshop / UIUC / Feb 11, 2015

Q: How much and when? 2015 Summary (@13 TeV): EPS LP, LHCP Council Moriond 2015 Summary (@13 TeV): ≤ 1 fb-1 with 50 ns by July 5 ~3 fb-1 with 25 ns by Sept 6 ~12 fb-1 with 25 ns by Nov 3 Latin for “Make haste slowly”. Proper balance of urgency and diligence Mark Neubauer Chicagoland LHC Workshop / UIUC / Feb 11, 2015

ATLAS Status / Plans Mark Neubauer Chicagoland LHC Workshop / UIUC / Feb 11, 2015

Mark Neubauer Chicagoland LHC Workshop / UIUC / Feb 11, 2015

ATLAS Run I Analyses & Publications… Run II preparations Trigger menu development New analysis framework, MC generation, etc.. FTK ;) *PC: parachute provided only in exceptional cases Mark Neubauer Chicagoland LHC Workshop / UIUC / Feb 11, 2015

Many Run I results quickly superseded Latin for “Make haste slowly”. Proper balance of urgency and diligence Mark Neubauer Chicagoland LHC Workshop / UIUC / Feb 11, 2015

Summary A feast is coming… LHC is in the midst of magnet conditioning for 13 TeV Expect 1st beam at on 23 March (previously 9 March) “Success-driven schedule”, with ~no contingency in final powering tests ATLAS now in 24/7 shift mode In midst of M8 commissioning work Run I pub  Run 2 prep Expect ~3 (15) fb-1 early Sep (Nov) Many analyses exceed Run 1 sensitivity with a few fb-1 (or less) 0101001011110… Latin for “Make haste slowly”. Proper balance of urgency and diligence Festina Lente! Mark Neubauer Chicagoland LHC Workshop / UIUC / Feb 11, 2015