Presented by: Rick Kendall, NA-17 Integrated Safety Management Best Practices Workshop September 2006; Denver Co. Assessment Criteria and Guidelines for.

Slides:



Advertisements
Similar presentations
Quality Assurance Update Presented byRay Hardwick Presented by: Ray Hardwick.
Advertisements

Department of Energy Quality Assurance Updates Frank Russo Deputy Assistant Secretary Office of Corporate Performance Assessment Energy & Environmental.
QA Programs for Local Health Departments
More CMM Part Two : Details.
Workplace Safety and Insurance Board | Commission de la sécurité professionnelle et de l’assurance contre les accidents du travail 2014 Safety Groups Advantage.
ORP Incorporating Human Performance Improvement Tools into DOE Processes Shirley J. Olinger, Deputy Manager, ORP Brian Harkins, ORP Facility Representative.
Environmental Management Systems An Overview With Practical Applications.
7/16/20151 Quality Assurance Overview. 7/16/20152 Quality Assurance System Overview FY 04/05- new Quality Assurance tools implemented  included CMS Quality.
How to write a Report On Assessment Source: AUN Secretariat.
Departmental Initiative to Enhance Activity-level Work Planning and Control DOE and DOE Contractors Industrial Hygiene Meeting in Conjunction with the.
Purpose of the Standards
Dimensions of Data Quality M&E Capacity Strengthening Workshop, Addis Ababa 4 to 8 June 2012 Arif Rashid, TOPS.
External Defibrillators: Recalls, Inspections, and the Quality System Regulation Melissa Torres Office of Compliance December 15, 2010.
CD NS Chief, Defense Nuclear Safety FIRE PROTECTON FUNCTIONAL AREA CDNS BIENNIAL REVIEWS May 15, 2012 Carl Sykes.
SAFETY AUDIT. 2.1 Definition of audit. Critical systematic inspection of an organization‘s activities in order to minimize losses due to accidents.
S/W Project Management
Work Planning & Control for “All” Activity Level Work Tim Flake Maintenance Advisor Washington Savannah River Company ISMS Work Shop November 28, 2007.
PILOT PROJECT: External audit of quality assurance system on HEIs Agency for Science and Higher Education Zagreb, October 2007.
INTEGRATION OF QA/ISM J. R. Yanek Chair, EFCOG ISM Working Group April 13, 2000.
Org Name Org Site CMM Assessment Kick-off Meeting Dates of assessment.
ISM Workshop 1 Independent Oversight Perspectives Michael A. Kilpatrick Deputy Director Office of Security and Safety Performance Assurance.
VPPPA Mentoring Program. The VPPPA Mentoring Program is a formal process to assist companies and facilities interested in participating in the Voluntary.
S oftware Q uality A ssurance Part One Reviews and Inspections.
Nov Readiness Review Course Implementation Plan - Mod 8 Screening or Scoping Meeting (ORR vs RA, Authorization Authority (AA) Defined, Startup Notification.
Work Planning & Control for R&D Activities – Lessons Learned 2007 ISM Workshop – Brookhaven National Lab John Miller Manager, SRNL Safety Programs Lori.
QUALITY ASSURANCE TRAINING DOE O 414.1C AND 10 CFR 830, SUBPART A
1 DOE IMPLEMENTATION WORKSHOP ASSESSING MY EMS Steven R. Woodbury
ISMS QMS Integration Dr. Thomas Helms, Parsons DOE SRS SWPF Project.
ISMS Best Practices Workshop Initial Steps to Integrate HPI into ISMS Continuous Improvement CH2M HILL Hanford Group, Inc. September 12-13, 2006.
ISM at the Savannah River Site Department of Energy Best Practices Workshop Lesson Learned Program Bill Luce, Manager Regulatory Services Washington Savannah.
2007 ISM Workshop Session E-1 Panel Discussion on Best Practices and Lessons Learned Frank McCoy/Bill Webb.
Margin Management. PAGE 2 Margin Management Plant Shutdowns 1.Late 1990’s – numerous “surprise” long-term plant shutdowns 2.Shutdowns resulted when a.
Elements of Effective Behavior Based Safety Programs
11 FSO Assessment of Fermilab QA Program Status September 14 – 18, 2009.
River Corridor Closure Project 1 Safety Teamwork Disciplined Operations Integrity River Corridor Closure Project Safety Teamwork Disciplined Operations.
Programme Objectives Analyze the main components of a competency-based qualification system (e.g., Singapore Workforce Skills) Analyze the process and.
Circuit Rider Training Program (CRTP) Circuit Rider Professional Association Annual General Meeting and Conference August 30, 2012.
Using ISMS Principles and Functions in Developing an ARRA Readiness Review Process Presented by Linda K. Rogers Assessments & Readiness Programs Manager.
DOE Integrated Safety Management (ISM) Conference Knoxville, TN August 24-27, 2009 Colette Broussard, DOE-HQ Office of Quality Assurance Policy.
ISM at the Savannah River Site Department of Energy Best Practices Workshop Facility Evaluation Board Steve Johnson, Manager Operations Evaluation Department.
ISM at the Savannah River Site Department of Energy Best Practices Workshop Work Planning and Control Tim Flake, Principle Technical Advisor Maintenance.
Integrating EM QA Performance Metrics with Performance Analysis Processes August 26, 2009 Robert Hinds, Manager, Quality Assurance Engineering & Greg Peterson,
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
HSS Inspection of Environment, Safety, and Health Programs at BNL Accelerator Safety Workshop E. Lessard Collider-Accelerator Department August 12-14,
ECOS Information Session Draft EPA Quality Documents February 13, 2013 Presented by EPA Quality Staff, Office of Environmental Information For meeting.
U N C L A S S I F I E D Operated by the Los Alamos National Security, LLC for the DOE/NNSA Improvement of Integrated Work Management and ISM Presented.
CBER Common Problems on Source Plasma Inspections Judy Ellen Ciaraldi BS, MT(ASCP)SBB, CQA(ASQ) CBER, OBRR, DBA September 16, 2009.
Monitoring the Long-Term Effectiveness of Integrated Safety Management System (ISMS) Implementation Through Use of a Performance Dash Board Process Mike.
Independent Oversight Status Report on Workplace Exposure Monitoring ISM Workshop 2007.
Qualification & Training of Work Planners Steven K. Little Work Control Department Manager.
Research and Test Reactor Decommissioning Inspections Gerald A. Schlapper, PhD, PE, CHP Health Physicist Division of Nuclear Materials Safety Region I.
U N C L A S S I F I E D Operated by the Los Alamos National Security, LLC for the DOE/NNSA Los Alamos National Laboratory Maintenance Work Planner Training.
River Corridor Closure Project 1 Safety Teamwork Disciplined Operations Integrity River Corridor Closure Project Safety Teamwork Disciplined Operations.
CHAPTER 3 Management Systems. Learning Objectives Describe the basic business activities and tools necessary to implement successful industrial hygiene.
Planning for Succession
NIEP Evaluation PO&A “How-to” Guide and Issue Classification
Readiness Review Course
Document Evaluation Process May 2005 Revision
The EM/HQ Perspective on Readiness Review
ORR Team Leader May 2005 Revision
The Federal Oversight and Contractor Assurance System Directives Safety Culture Improvement Panel Meeting September 7, 2016 Patricia.
Contractor Assurance Systems (CAS) Summit August 23, 2016
Regulatory Oversight of HOF in Finland
Research and Test Reactor Decommissioning Inspections
Elements of an Effective Safety and Health Program
Elements of an Effective Safety and Health Program
Trending Requirements and Results
Radiopharmaceutical Production
Research and Test Reactor Decommissioning Inspections
Presentation transcript:

Presented by: Rick Kendall, NA-17 Integrated Safety Management Best Practices Workshop September 2006; Denver Co. Assessment Criteria and Guidelines for Performing Assessments of the Effectiveness of Incorporation of Integrated Safety Management (ISM) and Quality Assurance (QA) Principles Into Activity Level Work Planning and Control at NNSA Sites Known as the “Appendix B CRAD” (Criteria, Review, and Approach Document) because it is Appendix B to the NNSA Document: “Activity Level Work Planning and Control Processes - Attributes, Best Practices, and Guidance for Incorporation of Integrated Safety Management and Quality Assurance” (dated January 2006) NNSA CRAD for Assessing Activity Level Work 1

Activity Level Work Planning and Control Processes Attributes, Best Practices, and Guidance for Effective Incorporation of Integrated Safety Management and Quality Assurance NNSA Document January 2006 Attributes There are 40 attributes listed among the following seven headings: 1. Activity Level Work Planning and Control Process; 2. Identify, Prioritize, and Approve Work; 3. Scheduling; 4. Planning Work; 5. Readiness; 6. Performing Work; and 7. Post Work Review and Closeout. Incorporation of the attributes into work planning and control processes will help to ensure that ISM and QA requirements are met at the activity level. Best Practices and Guidance Best practices and guidance information is provided under each of the attributes to help implement them, and thus to meet associated requirements. The best practices/guidance provides suggested approaches/acceptable methods for meeting DOE/NNSA requirements and expectations. CRAD (Appendix B) focused at the work activity level; will complement existing site ISM processes that flowdown nfrequirements from the site and facility levels; interact with workers, work planners, and work supervisors; not resource intensive (people, time, or documentation) compared to mother assessments; use standard forms (part of the CRAD); and results can be used to fulfill other assessment requirements where mappropriate. 2

3 NNSA Document with Appendix B CRAD

4 Appendix B CRAD Scope Focused at the Activity Level - where the problems are! Used for Assessing All Types of Activity Level Work Operations Research and Development Maintenance Construction Modifications Used to Assess a Single/Specific Work Activity

5 Purpose/Goals Ensure reliable, consistent work planning and control performance nfconsistent with requirements/expectations so that mission work is nfaccomplished safely and efficiently Interact with Workers, Work Planners, and Work Supervisors - ensure requirements/expectations appreciated/understood - use their knowledge/experience to improve work planning and nfcontrol process Requirements: - 48 CFR and 48 CFR and CFR DOE O414.1C - 10 CFR 851 Guidance: - DOE G B Vol.

6 Different Assessment Approach No pre-visit, plan of action, entrance meeting, or large team of people on-site nffor a couple of weeks Thorough and Focused (specific work activity) - Generally does not look at ISMS, QAP, or site level or facility level nfpolicies/procedures not germane to work activity being assessed Can be performed by one or two people - Site Office, Contractor, or combination Non-Intrusive - limited/minor impact on mission/facility Results documented using standard forms Documentation requirements are minimal - provide objective evidence where criteria are met - sufficient detail to understand and correct issues - additional explanation where needed Needed flexibility built in (graded approach) Typically short duration (roughly equivalent to work activity) Can be used as input to other assessments/oversight activities Can be used as training tool

7 Assessment Method Comparison Assessment Methodology/Approach Typical Team Assessment (ORR, ISM, SSA/SP, Phase II VSS, etc.) Appendix B CRAD Plan of Action RequiredYesNo Entrance Meeting/Daily Meetings Required YesNo Use of Criteria, Review, and Approach Document (CRAD) Yes Conduct document reviews, interviews, and observations Yes Identified Issues tracked in Site- wide Integrated Issues Management System Yes Preparation and use of qualified and independent assessors Yes Requires Team Leader and large team (e.g., 5-15 people) YesNo Detailed documentation of assessment required Yes Only if criteria are not met, and where explanation is needed Performance FrequencyInfrequent/As Necessary Several times per year at least/As Necessary

8 Approach Benefits Allows assessments to be performed more frequently Can assess different organizations, departments, divisions, crews, teams, nfsubcontractors, etc. Can interact with more workers, planners, and supervisors over shorter nfperiod of time Provides consistent reinforced set of expectations across site and nfcomplex (same rules when move to different job) Works well with other Site Office Action Plan ( #23) actions (e.g., nftraining and qualification of work planners; management on the floor nfinteraction with workers to reinforce ISM; etc) Leads to improvements in work processes (ISM/QA more effectively nfimplemented on the floor) and activity level work (repeat work and nfpersonnel efficiency) Repeated use over time ensures/promotes continued excellence

9 Assessment Form Sample Pages

10 Conclusion The Department’s Implementation Plan for DNFSB Recommendation , Oversight of Complex, High-Hazard Nuclear Operations, states that improvement in reliability and consistency of work planning and work control performance at the activity level is needed, and that that the current ISM system contains minimal expectations, and no explicit requirements, at any level to routinely assess the implementation of work planning and work control processes at the activity level. Institutionalization of the NNSA Appendix B CRAD ( #23 Site Office Action Plans) is intended to address these concerns by helping to achieve needed improvements and ensure that all future work is performed in a safe, efficient, quality manner.

11 Future Work Revise the January 2006 Activity Level Work Planning and Control Processes - Attributes, Best Practices, and Guidance for Incorporation of Integrated Safety Management and Quality Assurance document, including the Appendix B CRAD “Assessment Criteria and Guidelines for Performing Assessments of the Effectiveness of Incorporation of Integrated Safety Management and Quality Assurance (QA) Principles Into Activity Level Work Planning and Control at NNSA Sites” based on: Feedback (comments from reviewers and users - both the main nfdocument and the Appendix B CRAD) DNFSB Tech-36 Human Performance Improvement Principles 10 CFR 851 Worker Safety and Health Rule ISM Champions Workshops (April 2006 and September 2006) Please provide feedback/comments/suggestions for improving these documents to: or )

12 Final Thought - Leading Indicators Assessments conducted using the NNSA Appendix B CRAD can be used to identify real-time leading performance measures/indicators of safety culture problems: Failure to implement ISM - Failure to adequately define the scope of work - Working outside the approved envelope (scope creep) - Failure to identify all hazards (work and site) - Failure to work within approved controls Failure to implement Conduct of Operations - Lockout/Tagout violations - Failure to follow procedures - Failure to properly perform independent verifications - Failure to record field conditions, errors, near misses, etc. - Failure to ensure unexpected conditions are analyzed and understood before nfproceeding As compared to conventional reporting mechanisms (e.g., ORPS), collecting and analyzing this information may provide a more accurate and leading indication of pending safety problems, and lead to taking corrective actions that prevent future unacceptable outcomes/events