Monte Carlo Methods Focus on the Project: Now that there are two folders (9am and 9pm) that contain a Queue Focus.xls file, we will create two more folders.

Slides:



Advertisements
Similar presentations
EA Testing Instructions By Ross Todd. Open C Drive.
Advertisements

Spreadsheets in Finance and Forecasting Week 4: Using Formulae.
1 CA202 Spreadsheet Application Combining Data from Multiple Sources Lecture # 6.
Tutorial 6: Managing Multiple Worksheets and Workbooks
Example 5.6 Non-logistics Network Models | 5.2 | 5.3 | 5.4 | 5.5 | 5.7 | 5.8 | 5.9 | 5.10 | 5.10a a Background Information.
MyFloridaMarketPlace Analysis 2.0 Functional Overview December 18 - December 19, 2007.
Session 9b. Decision Models -- Prof. Juran2 Overview Finance Simulation Models Securities Pricing –Black-Scholes –Electricity Option Miscellaneous –Monte.
Class 21: Bidding Strategy and Simulation What is a “bidding strategy”? –System of determining what to bid –For example: signal with winner’s curse subtracted.
Mathematics for Business Decisions, Part 1.5a Managing ATM Queues.
Probability Distributions
Solutions to Chapter 12 Exercises
What’s in the Focus file and how do we edit it? Project 2, 115a.
Project 7 Forecasting Values With What-If Analysis: Using Data Tables, Scenarios, Goal Seek, and Solver Jason C. H. Chen, Ph.D. Professor of Management.
Histograms & Summary Data.  Summarizing large of amounts of data in two ways: Histograms: graphs give a pictorial representation of the data Numerical.
LSP 121 Week 2 Intro to Statistics and SPSS/PASW.
ATM QUEUES Kemal Cilengir Kristina Feye Jared Kredit James Winfield.
Monte Carlo Methods A Monte Carlo simulation creates samples from a known distribution For example, if you know that a coin is weighted so that heads will.
Importing COST function to the Team file. D, R, C, & P, Focus on the project Calculus, Mathematics, Tests, Homework, Computers Marketing Computer Drives.
Project 2: ATM’s & Queues
Introduction to Spreadsheets Microsoft Excel. What is a spreadsheet? Enter data. Analyze data. Make graphs.
Strategy 1-Bid $264.9M - Bid your signal. What will happen? Give reasoning for your analysis Had all companies bid their signals, the losses would have.
Project 2-Guidelines. Recall- Class Project-Goals  Determine what would be expected to happen if each company bid the same amount as its signal.  Determine.
Mathematics for Business Decisions, Part 1.5a Managing ATM Queues.
Random Sampling  In the real world, most R.V.’s for practical applications are continuous, and have no generalized formula for f X (x) and F X (x). 
Check it out! : Simple Random Sampling. Players of a dice game roll five dice and earn points according to the combinations of numbers they roll.
Monte Carlo Methods A Monte Carlo simulation creates samples from a known distribution For example, if you know that a coin is weighted so that heads will.
Simulation Output Analysis
Verification & Validation
WOOD 492 MODELLING FOR DECISION SUPPORT Lecture 27 Simulation.
MS Excel Introduction Short Course Warilla High School April 2008.
Project 2: ATM’s & Queues. ATM’s & Queues  Certain business situations require customers to wait in line for a service Examples:  Waiting to use an.
 For this particular example, we will be creating a Light Bulb fundraising sheet.  Columns A-F will be utilized as well as multiple rows, which depends.
EXAM REVIEW PROJECT Microsoft Excel Exam 1. EXAM PROCEDURES 10 minutes to review project before starting 60 minutes to complete the exam In this presentation,
Tips for Writing Lab Reports
ESD.70J Engineering Economy Module - Session 21 ESD.70J Engineering Economy Fall 2006 Session Two Alex Fadeev - Link for this PPT:
ESD.70J Engineering Economy Module - Session 21 ESD.70J Engineering Economy Fall 2009 Session Two Michel-Alexandre Cardin – Prof. Richard.
Extended Contract Record Directions Go to and click on DEPARTMENTS. Click on PreK-12 CURRICULUM..
Simulation Using computers to simulate real- world observations.
Microsoft® Excel Key and format dates and times. 1 Use Date & Time functions. 2 Use date and time arithmetic. 3 Use the IF function. 4 Create.
M/M/1 Queues Customers arrive according to a Poisson process with rate. There is only one server. Service time is exponential with rate  j-1 jj+1...
GET READY Questions will run automatically. Set 9 Question 1 How many sides does a heptagon have?
Vocabulary Basic Spreadsheet Formulas Copyright © Texas Education Agency, All rights reserved.
Using Microsoft® Excel This presentation is designed for Chapter 1, Section 1.2.
Density Column Project. This project is worth 5 points towards your grade. 3= Completed a 5-layer liquid density column with density calculations on a.
Simulation in Healthcare Ozcan: Chapter 15 ISE 491 Fall 2009 Dr. Burtner.
Random Name Picker. Instructions 1.Either enter a list of new names or load a set previously saved names by clicking the load button. 2.Click start. Known.
Use SPSS for solving the problems Lecture#21. Opening SPSS The default window will have the data editor There are two sheets in the window: 1. Data view2.
Example 14.3 Queuing | 14.2 | 14.4 | 14.5 | 14.6 | 14.7 |14.8 | Background Information n County Bank has several.
Microsoft Project 2010 ® Tutorial 5: Tracking Progress and Closing the Project.
Example 9.10 Sales Response to Coupons for Discounts on Appliances Confidence Interval for the Difference Between Proportions.
MyFloridaMarketPlace Analysis 2.0 Functional Overview.
Monte Carlo Methods Focus on the Project: Enter mean time between arrivals for variable A in cell B31 of the sheet 1 ATM for the Excel file Queue Focus.xls.
Starter! Get Ready to Learn! ClassworkFriday 10th October 2014 Bags under desks No drinks bottles near electrical equipment Log on to the School Computer.
Using the Excel Creation Template to Create a Variable Parameter Problem (Macro Enabled “Alpha 1.4.2”) Getting started – Example 1 Note – You should be.
Modeling and Simulation CS 313
Open Office Calc Session 01 Class Management Report
TUTORIAL 2: Creating Query for Bill Processing Using
Excel Spreadsheets 1/28 I can… BW… Work with basic functions in Excel
Solutions Hwk Que3 1 The port of Miami has 3 docking berths for loading and unloading ships but is considering adding a 4th berth.
Introduction to Excel Spreadsheets I can…
 1. Go to the following address on the Internet:
Solutions Queueing Theory 1
Ch. 6 – The Definite Integral
Solutions Queueing Theory 1
Solutions Hwk Que3 1 The port of Miami has 3 docking berths for loading and unloading ships but is considering adding a 4th berth.
A few tricks to take you beyond the basics of Microsoft Office
Getting started – Example 1
A Quick Guide to Preparing FDIC AHP Annual Reports
This is my sheet And this is my sheet.
Presentation transcript:

Monte Carlo Methods Focus on the Project: Now that there are two folders (9am and 9pm) that contain a Queue Focus.xls file, we will create two more folders One folder should contain the Queue Focus.xls file using 9am data and one should have the Queue Focus.xls file using the 9pm data (we can call these folders “9am irritated” and “9pm irritated”

Monte Carlo Methods Focus on the Project: For the 9am irritated claim, we will open the third copy of Queue Focus.xls (in 9am irritated folder) We will find the percent irritated value for each of the four ATM models

Monte Carlo Methods Focus on the Project: In the sheet 1 ATM, column K contains Delayed information This will be changed to find Irritated information

Monte Carlo Methods Focus on the Project: Cell K35 contains the following formula: =IF(ISNUMBER(F35),IF( J35 >$D$31,"yes","no"),"") Change J35 to L35 and copy the formula to the end of the table

Monte Carlo Methods Focus on the Project: In addition, the value in cell D31 must be changed from 5 to 3 Recall, a customer is irritated if there are more than 3 customers waiting to use an ATM

Monte Carlo Methods Focus on the Project: Run the macro One_ATM The solution will appear in cell V39 (Percent Delayed label)

Monte Carlo Methods Focus on the Project: In the sheet 2 ATMs, column O contains Delayed information This will be changed to find Irritated information

Monte Carlo Methods Focus on the Project: Cell O35 contains the following formula: =IF(ISNUMBER(F35),IF( N35 >$D$30,"yes","no"),"") Change N35 to P35 and copy the formula to the end of the table

Monte Carlo Methods Focus on the Project: In addition, the value in cell D30 must be changed from 5 to 3 Recall, a customer is irritated if there are more than 3 customers waiting to use an ATM

Monte Carlo Methods Focus on the Project: Run the macro Two_ATMs The solution will appear in cell AC39 (Percent Delayed label)

Monte Carlo Methods Focus on the Project: In the sheet 3 ATMs, column R contains Delayed information This will be changed to find Irritated information

Monte Carlo Methods Focus on the Project: Cell R35 contains the following formula: =IF(ISNUMBER(F35),IF( Q35 >$D$30,"yes","no"),"") Change Q35 to S35 and copy the formula to the end of the table

Monte Carlo Methods Focus on the Project: In addition, the value in cell D30 must be changed from 5 to 3 Recall, a customer is irritated if there are more than 3 customers waiting to use an ATM

Monte Carlo Methods Focus on the Project: Run the macro Three_ATMs The solution will appear in cell AF39 (Percent Delayed label)

Monte Carlo Methods Focus on the Project: In the sheet 3 ATMs Serpentine, column R contains Delayed information This will be changed to find Irritated information

Monte Carlo Methods Focus on the Project: Cell R35 contains the following formula: =IF(ISNUMBER(F35),IF( Q35 >$D$30,"yes","no"),"") Change Q35 to S35 and copy the formula to the end of the table

Monte Carlo Methods Focus on the Project: In addition, the value in cell D30 must be changed from 5 to 9 We use 9 since 3 ATM’s with a serpentine queue should move 3 times faster than a single queue behind a single ATM Recall, a customer is irritated if there are more than 3 customers waiting to use an ATM

Monte Carlo Methods Focus on the Project: Run the macro Three_ATMs_Serpentine The solution will appear in cell AF39 (Percent Delayed label)

Monte Carlo Methods Focus on the Project: A summary of the findings appears below: Claim is that at most 3.0% will be irritated (3 ATMs) Percent Irritated 1 ATM95.1% 2 ATMs75.4% 3 ATMs2.7% 3 ATMs Serp2.5%

Monte Carlo Methods Focus on the Project: Summary (9 am) Mean Wait Time Max Wait Time Percent Delayed Mean # in Queue Max # in Queue Percent Irritated 1 ATM % % 2 ATMs % % 3 ATMs % % 3 ATMs Serp % % Claims % %

Monte Carlo Methods Focus on the Project: Save the new Queue Focus.xls file in your 9am irritated folder Do all of the same calculations for 9pm irritated

Monte Carlo Methods Focus on the Project: Summary (9 pm) Mean Wait Time Max Wait Time Percent Delayed Mean # in Queue Max # in Queue Percent Irritated 1 ATM % % 2 ATMs % % 3 ATMs % % 3 ATMs Serp % % Claims % %

Monte Carlo Methods Focus on the Project: Final steps are to determine the cost of the gift certificate program as is and to determine the cost if 70% of customers who are eligible use the gift certificates

Monte Carlo Methods Focus on the Project: During the 9 am hour, the mean time between arrivals was 0.48 (for my data) This gives customers per hour

Monte Carlo Methods Focus on the Project: It is estimated (from simulation) that 1.0% of customers will be delayed using 3 ATMs Serpentine This gives us delayed customers per hour

Monte Carlo Methods Focus on the Project: According to my sample data, the gift certificates are worth $35 Each hour would cost in gift certificates The maintenance cost is $21 per hour

Monte Carlo Methods Focus on the Project: The total cost would be $ $21 = $64.75 This is the cost if all customers who are eligible for gift certificates actually use them

Monte Carlo Methods Focus on the Project: However, some customers will not use the gift certificate program If 70% of those eligible to use the gift certificates actually use them, then the hourly cost of gift certificates changes from $43.75 to $43.75(0.70) = $30.63

Monte Carlo Methods Focus on the Project: The overall cost would be $ $21 = $51.63 This is the cost if 70% of eligible customers used their gift certificate