Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Public Information Meeting.

Slides:



Advertisements
Similar presentations
Replacement of the Queens Approach Bronx-Whitestone Bridge
Advertisements

New York State Department of Transportation Region 11 Reconstruction of Jamaica Avenue Bridge over I-678 Van Wyck Expressway The Roll-in/Roll Out Method.
Local Agency Bridge (LABP) Program Overview Informational Presentation – January 7, 2011 Carol Olsen, ODOT LGS Bridge Program Manager Local.
Project Development Process (PDP) Structures. PDP – Three Project Levels Major Project ~ 14 Steps Major Project ~ 14 Steps Minor Project ~ 10 Steps Minor.
Caltrans District 4 EMERGENCY REPLACEMENT STATE ROUTE 128 RUSSIAN RIVER BRIDGE COMMUNITY INFORMATIONAL MEETING March 9,
ROUTE 72 BRIDGE IMPROVEMENTS TP 708 Pre-Proposal Meeting May 2, 2008.
State Project No /195 Rehabilitation of Bridge Nos and I-84 over Marion Ave Southington, Connecticut Rehabilitation of Bridge Nos.
Innovative Contracting Techniques that Consider Driver Impacts Use of A+B Bidding Presented by: David L. Kent P.E. New York State Department of Transportation.
Maryland State Highway Administration Office of Structures Maryland State Highway Administration Office of Structures West Nursery Road over MD 295 (Baltimore-
Bridge over BNSF Railroad 7 km East of Windham - East Bridge Replacement Project Using Accelerated Bridge Construction.
1 Canyonero Parkway Cost Estimate Review Close out presentation October 5, 2007.
Rating of Local Bridges for SHVs Using Virtis Software Virtis/Opis User Group Meeting August 3-4, 2010 Moises C. Dimaculangan, P.E. Minnesota Department.
Bridge No over the Spokane River at State Line (looking south) 1 of 19.
DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING & CONSTRUCTION STRUCTURAL DESIGN SECTION REPLACEMENT OF BRIDGE NO. B-0427 ON DAIRY ROAD OVER OWL BRANCH.
10 miles on I-80 from Robb Dr. to Vista Blvd. Reconstruction through congested downtown Installation of new 10-mile ITS system Preserved Operational Capacity.
Hardin County Engineering Department September 12, 2006.
U.S. 421 Bridge DES# Thursday, July 17, :30 p.m. Frankfort Community Public Library 208 West Clinton Street, Frankfort, IN.
Clinton Street Bridge over the Maumee River ODOT Project DEF December 2, 2014 Stakeholder’s Meeting.
Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.
HERO UNIT Training Module Work Zone Traffic Control And Incident Management Operations.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Route 110 over Route 27 Design-Build Project (PIN , D900027) Town of Babylon, Suffolk County Request.
I-5, Skagit River Bridge Collapse First Annual Missouri Bridge Conference April 9, 2015 Columbia, MO Jugesh Kapur, PE, SE.
Bridge Rehabilitation W Interstate 290 over CSX Railroad and 4 City Streets I-290 Viaduct Reconstruction.
MaSSENA LATERAL BRIDGE SLIDE CASE STUDY
Public Information Meeting Rehabilitation of Bridge No Flat Rock Hill Road over I-95 Old Lyme, Connecticut Rehabilitation of Bridge No Flat.
The New I-64 Design-Build Project October Three Design-Build Contracts Legislative authorization in 2004 I-64, St. Louis –Awarded November 2006.
Bridge Building Timelines Presented by The Richland County Engineers Office Thomas E. Beck, PE, PS 77 North Mulberry Street Mansfield, Ohio Jan.
Page 1 MINISTRY OF TRANSPORTATION Cyrville Road Bridge Replacement at Highway 417 (Ottawa Queensway) Detail Design Study Group Work Project
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Alternatives Presentation.
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
From Planning to Pouring: The Evolution of Safe Routes to School Julie Walcoff, Ohio DOT, Columbus, OH Alex Smith, Columbus Public Health, Columbus, OH.
 The Project Team › Design, Planning & Construction:  Hubbell, Roth & Clark, Inc. (HRC)  Grissim, Metz, Andriese Associates (GMA)  O’Neal Construction.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
WVDOH Accelerated Construction Concepts Benjamin Beerman, PE.
SHRP 2 - FIRST DEMO PROJECT KEG CREEK, IOWA R04 – “BRIDGE DESIGNS FOR RAPID RENEWAL” Sandra Larson, P.E. Iowa Department of Transportation Research and.
St Johnsbury BF 7000(20) Bridge 6 on VT Route 2B over the Lamoille Valley Rail Trail Presenter: John Byatt, PE Consultant Project Manager.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
STATE ROUTE 1 ALAMITOS BAY BRIDGE IMPROVEMENT PROJECT SCOPING MEETING AUGUST 5, :00 p.m.Open House 6:30 p.m.Presentation 7:00 p.m.Public Comment.
Project Scoping Fundamentals Alan Lively Project Delivery Specialist Local Government Section April 6, 2010.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Region 9 Design-Build Project (PIN , D900020) Broome, Delaware,
SR 1 BLUFFTON Public Hearing September 25, INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
Office of Traffic, Safety and Technology Module 4 Work Zone Applications Traffic Control Plan Development Course.
Purpose of Work Shop Share Ohio’s experience with a full closure reconstruction: the rationale, challenges, implementation and benefit.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Standardizing Transportation Project Submittals to DNR Team Jim Doperalski WDNR Mike Halsted WDNR Janet Smith WisDOT Troy Stapelmann WisDOT Standard Submittal.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
Bristol BF 021-1(33) Regional Concerns Meeting VT Route 116 – Bridge #12 over Baldwin Creek April 27, 2015.
Presented By: Jeffrey T. Folden, P.E. Assistant Chief, Innovative Contracting Division.
1 MnDOT Metro District Proposed Transportation Improvement Program (TIP) Amendment Metropolitan Council January 17, 2007.
Justin Hardee, P.E. Lee County Engineer.  ALDOT Policy  Construction Process  Status  Lee County’s Bridge Inventory  2010 Bond Issuance for Bridges.
VT 100 over the Mad River Bridge Replacement July 13, 2015.
SR 256 Road Rehabilitation Town of Austin January 18, :00pm Austin Elementary School.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Geometric Design: General Concept CE331 Transportation Engineering.
1905 NW Thurman St Bridge. Project Location Thurman St Bridge.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project March 12, 2002 Contractor Outreach.
Item 6b. Project Vicinity Park Ave Bridge Existing Park Avenue Bridge.
The Project Concept Phase - Concept Report Requirements Presented by the Georgia Department of Transportation Roxana Ene – LCI Coordinator
Construction Manager/General Contractor Pilot Program Construction Management Association of America February 18, 2016 California Department of Transportation.
Maintenance and Temporary Traffic Control
Brookeville Bypass Final Design Presentation Initech May 6, 2004.
TOTAL BRIDGE REPLACEMENT OF M-13 OVER CHEBOYGANING CREEK
Value Engineering Study and Risk Assessment
Project Purpose and Objective
Aaron Crowley, Ph.D. KSWA Travis Smith, P.E. TDOT Biloxi, Mississippi
General Tab Project, Cost Schedule, and Work Limits Roadway Character
General Tab Project, Cost Schedule, and Work Limits Roadway Character
S.R. 26 Road Rehabilitation in Clinton County
Walker Street Reconstruction Project 25% Design Public Hearing
Presentation transcript:

Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Public Information Meeting

TH 47 BR 46 PROJECT LOCATION

Meeting Outline Purpose of the Meeting Structures Section re-organization Existing bridge deficiencies Proposed Project Summary and Questions-

Purpose of Meeting Present the proposed project Answer questions Obtain approval to proceed with project-

Phases of Development Project DefinitionProject DesignConstruction Project Funded Project Defined Contract Award Identify resources & constraints Evaluate alternatives Public Participation Build Consensus Quantify areas of impact Environmental permits Right-of-Way Process Utility Coordination Develop plans, estimate and specifications

Accelerated Bridge Program Began in January 2012 Bridges are deteriorating faster than we can fix them Accelerated Bridge Construction (ABC) is key Impacts to property and resources is minimized Standard details repeated on many projects Shift from individual projects to programmatic approach Accelerated Project Delivery Goal of 2 year design phase for ABP (5 years conventional) Goal of 25% of projects into Accelerated Bridge Program-

Project Initiation & Innovation Team Part of re-organization in January 2012 Currently team of 5 All projects will begin in the PIIT Very efficient process Look for innovative solutions whenever possible Involved until Project Scope is defined Hand off to PM to continue Project Design phase -

Project Background Priority 20 in the Town Highway Bridge Program The structure is owned and maintained by the Town TH 2 is a Class 2 Town Highway Existing bridge is a single-span steel beam bridge with a concrete deck (replaced with temporary Mabey bridge) Span of 47 feet and width of 18 feet The bridge was built in 1924 Bridge is structurally deficient and has a Federal sufficiency rating of 9.0 (out of 100) -

Project Background (Cont) Traffic Data AADT DHV ADTT4555 %T Design speed = 50 mph

Description of Terms Used Beams (Superstructure) Deck Abutment (Substructure) Bridge Rail

EXISTING BRIDGE DEFICIENCIES Deficiencies The deck, superstructure and substructure are in critical to poor condition The bridge width does not meet the current standard. Inspection Report Information (Based on a scale of 9) Deck Rating3 Critical Superstructure Rating4 Poor Substructure Rating4 Poor Channel Rating5 Fair

18’ Width of Bridge

Bridge Side View

Existing Site Conditions Bridge Width (Face-Face Rail) = 18’-0” Design Speed Limit = 50 mph No Postings for Weight Restriction Overhead Utilities present (cross over bridge)-

Layout Showing Constraints

Proposed Project Complete bridge replacement warranted Use 10’ lanes w/ 2’ shoulders (24’ rail-rail width) Approximately 48’ span -

Proposed Bridge Typical

Layout

Profile

Bridge Closure Details 4 week closure will be specified in contract Timing of closure will be made w/ input from Town (to minimize community impacts) Closure must be between June 1 – September 1 Town responsible for detour route (location, signing, installing, maintaining) One route adds 3 miles and is 11 miles end-end Local share cut in half w/ closure-

Summary Need written approval from Town to advance project Finance & Maintenance Agreement needs Town signature (will be sent shortly) Project has been added into the Accelerated Bridge Program based on Town letter allowing closure Project will be handed off to Design Project Manager to complete project Currently scheduled for construction in 2014

Questions