PRESENTATION FOR POLO SETTIMO TORINESE PROJECT Nov.25 th.2009.

Slides:



Advertisements
Similar presentations
Potential sources of asbestos in buildings
Advertisements

East Hampton High School July 2013 – July 2014 Design Phases.
Update on FCPS Construction/Renovation Projects August 2009.
April 21, 2010 Barbara C. Jordan Elementary School Update Presented by.
Monthly Management Report November Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
Skyscraper Construction
DG Inyorkern Weekly Project Summary 1/17/14. DG Inyokern 1/17/14: Percentage Overview Demolition: Pad Prep: 100% Finished and ceriified Footing & Foundation:
Project Management System SharePoint Application Designed for 2010, 2013, Office365.
IWTP Facility. Holes Drilled for Detailed Blast Drilling and Blasting for final grade prior to construction in 2011.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
SNOLAB Facility Status Fraser Duncan SNOLAB Workshop 27 August 2009.
CENF – Civil Engineering Extension B887 CERN: An accelerator complex unique in the world -Prevessin site complex- -EHN1 Extension Area- EHN1 Extension.
Industry information day INDUSTRY INFORMATION DAY Assembly & Installation Laurent Schmieder Buildings Infrastructure and Power Supplies Project.
David Saenz Far Experimental Hall - June 17, Far Experimental Hall - Hutches Scope Budget Schedule.
1 Infrastructure issues Andy Nichols, STFC – RAL MICE Collaboration Meeting, Harbin, 13-17th January 2009.
David Saenz FAC November 11, 2008 SLAC National Accelerator Laboratory 1 Far Experimental Hutches David Saenz Project Manager.
MEP201 Mechanical Engineering Drawing 1 st semester S R Kale Lecture Piping Drawings.
 Familiarization of system  Locations of: Hydrants FDC Knox Box FACP Sprinkler Riser Room Liquid Oxygen  Unique Fire Protection Element Smoke Curtain.
FPF190: Fire Protection Fundamentals FPF190 Fire Protection Fundamentals 1 Code Consultant.
ILC Mechanical & Electrical Review Conventional Electrical System Americas Region Design Summary March 21, 2012 Randy Wielgos, FNAL Parsons Electrical.
By: Brian Toomer ET-494 Senior Design Dr. Cris Koutsougeras Advisor: Mr. Rode’
Project Control WeekCost ($)Cumulative CostWeek StartingBCWSACWPBCWP 1$6, /17/10$6,672.50$4,070.23$4, $53,407.33$60, /24/10$60,079.83$51,068.68$17,
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
LAYOUT OF COMMERCIAL BUILDINGS
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
Construction Drawing Occupational Safety and Fundamentals
Monthly Management Report October Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
1. Outline:  Introduction.  Architectural Design.  Structural Design.  Environmental Design.  Mechanical & Electrical Design.  Safety Design. 
08/31/07Shutdown’07 Week 4 F.G. Garcia1 MTA beam line installation Weekly Report August 31, 2007 Period covered: August 24 th to August 31 st (Week 4)
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
Progress on Remote Handling Systems TAC 12 Magnus Göhran – WPM 15 th October 2015.
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
Access for All – The WMI Elevator Project What started as a dream several years ago is now becoming a reality. By the fall of 2010, the WMI will have a.
Orthographic Drawings
2005/06/22 ALBA Building Project David Carles Engineering Services Division - CELLS.
Sprinkler Loads on Trusses
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/21.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
ESS KAY CONSULTANTS MEP CONSULTANTS. WHAT IS MEP ??? MECHANICAL ELECTRICAL MEP PLUMBING.
CEE 578 Senior Capstone Design Types of Construction Drawings
Sprinkler Loads on Trusses Educational Presentation.
Estimating and Scheduling CEE 492
Fundamental Concepts for Design of Special Hazard and Fire Alarm Systems Chapter 1.
FRONT VIEW OF PETROLEUM HOUSE 1. PLOT SIZE.175 ft x 200ft (35000 Sft) ( Sq yard) (7.778 Kannals) 2. DATE OF START STIPULATED.
Water and Waste Department 2016 CAPITAL WORKS CONSTRUCTION PROGRAM Presentation to Manitoba Heavy Construction Association April 20,
ESKOM - MWP NEW ENERGY CENTRE Mechanical Installation 16 April 2014.
Symbols and Room Finishes
21 January Summary: Updating of the activities carried out on-site (Done) in DEC + ½JAN List activities on going (Next steps) and scheduled till.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/14.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/02/04.
Session 1: Identifying Construction Drawings and Drawing Components.
Upon completion of this module, you will be able to:
SR1 extension follow up 27-Mar-17 Marco Ciapetti.
FIRE PROTECTION & SECURITY in ELI Beamlines
San Luis Potosi – New plant April 24th 2015
Construction Documents
INSTALLATION SEQUENCE
Heating, Ventilating, and Air Conditioning
FRESNO COUNTY WEST ANNEX JAIL
MAIN 220 Equipment Installation
Potential sources of asbestos in buildings
Heating, Ventilating, and Air-Conditioning
Minuteman Vocational Technical Regional High School Progress
Introduction to Construction Drawings
The sport hall.
Minuteman Vocational Technical Regional High School Progress
Value of contract: Length of contract: Contract start date:
Minuteman Vocational Technical Regional High School Progress
Far Experimental Hall - Hutches
Presentation transcript:

PRESENTATION FOR POLO SETTIMO TORINESE PROJECT Nov.25 th.2009

Presentation for NPST 1.Previous Minute Meeting (27 th.Oct) 2.General Description 3.Schedule 4.Critical Points

1.Foundation fixed out of Building 101. Issues Previous Minute Meeting (28 th.Oct) 1.The foundations for Silos of 101 have not been confirmed yet. Status 2.Hangar East 2.The hanger east had been started on Nov.13th, HQCEC have require ROSSO to prepare the detail time schedule. And the new tank and pump station will finish connection with existing system before Dec.10 th, then, the interference will be avoided.

3.Anticipate the start of compressed air, MV Cabinet and Industrial Water in the hangar. Previous Minute Meeting (28 th.Oct) 3.Following civil construction time schedule of hangar east we will organize the work. 4.Facade panels: they are ordered and in production. Delayed is the “moke up” to fix monitoring quality and procedure. 4.According to the job site situation, the progress of façade is following the time schedule. Issues Status

General Description 1.In 102~106, Inside wall finished 70%, water proof of roof finished 70%, outside wall finished 65%. 2.The prefabricated parts in 101 finished 60%. 3.Civil work of Hangar East started on Nov.13 th. 4.BUSI start the site work since 19 th.Oct.2009, and finish 5 lines in 104 piping trench. 5.EUSEBI finished the foundation of tank and continued the underground piping and sprinkler system. 6.The progress for underground piping are following the schedule 7.Cerrato started the crane beam installation today.

Schedule of 102~106 Trenches & Equipment Foundations in 103NT & T Trench 1 Trench 2 Trench 3 Main Trench 103-NT Trench in 103-NT Trench 1 in 104: Finished Trench 2 in 104: Finished Trench 3 in 104: Finished Main trench in 104: 10th Dec Trench in 103-NT: 5 th.Oct.2009~24 th.Dec.2009, From 1st Dec can start the work for piping

103-T 103-NT Schedule of 102~106 Process Equipment Foundations 102 Foundations in 102: 1 st.Dec.2009 ~ 15 th.Jan.2009 Foundations in 105: 15 th.Dec.2009 ~ 30 st.Dec.2009 Creel room in 102: 1°Main steel structure: 7 th.Dec.2009 ~ 20 th.Jan °External wall: 25 th.Dec.2009 ~ 30 th. Jan.2010

Schedule of 102~106 Internal Partition Wall T 103-NT Step 1: Finished Step 2: Working, will finish on 30 th.Nov.2009 Step 3: 28 th.Nov.2009 ~ 15 th.Dec.2009

Schedule of 102~106 Roof Construction Area 1: will finish before 1 st.Dec.2009 Area 2: will finish before 5 th.Dec.2009 Area 3: will finish before 15 th.Dec.2009 Part 2: 9 th.Nov.2009 ~ 24 th.Dec.2009 Area 3 Area 2 Area 1 Part 2 Part 1: Water-proof of tegula and installation of suspended ceiling finished. For other roof work: Part 1 Area 4 Area 4: will finish before 20 th.Dec.2009

Schedule of 102~106 External Wall Step 1: 12 th.Sep.2009 ~ 15 th.Dec.2009 Step 2: 20 th.Sep.2009 ~ 25 th.Dec.2009 Step 3: 25 th.Nov.2009 ~ 5 th.Jan.2010 Step 4: 15 th.Dec.2009 ~ 19 th.Jan.2010 Time schedule Actual work: Finished

Schedule of 102~106 Floor Construction Step 1: 7 th.Dec.2009 ~ 13 th.Dec.2009 Step 2: 14 th.Dec.2009 ~ 15 th.Dec.2009 Step 3: 16 th.Dec.2009 ~ 20 th.Dec.2009 Step 4: 21 th.Dec.2009 ~ 23 th.Dec T 103-NT Step 5: 28 st.Dec.2009 ~ 31 st.Dec.2009 Step 3 Step 7 Step 6 Step 8 Step 9 Step 1 Step 5 Step 2 Step 6: 4 th.Jan.2009 ~ 11 th.Jan.2009 Step 7: 12 th.Jan.2009 ~ 13 th.Jan.2009 Step 8: 14 th.Jan.2009 ~ 15 th.Jan.2009 Step 9: 18 th.Jan.2009 ~ 20 th.Jan.2009 Step 10: 21 st.Jan.2009 ~ 22 nd.Jan.2009 Step 10 Step 4

Schedule of 102~106 Fire Fighting System T 103-NT : 18 st.Nov.2009 ~ 5 th.Dec T: 23 th.Nov.2009 ~ 2 nd.Dec NT: 30 th.Nov.2009 ~ 11 th.Dec : 8 th.Dec.2009 ~ 29 th.Dec : 7 th.Dec.2009 ~ 25 th.Dec : 10 th.Dec.2009 ~ 29 th.Dec.2009

Schedule of 102~106 Electrical System Installation 103-T: 16 th.Nov.2009 ~ 7 th.Jan : 15 th.Dec.2009 ~ 30 th.Jan : 27 th.Nov.2009 ~ 13 th.Jan : 27 th.Nov.2009 ~ 13 th.Jan T 103-NT : 9 th.Dec.2009 ~ 23 rd.Jan NT: 3 rd.Dec.2009 ~ 19 th.Jan.2010

Schedule of 102~106 Piping System Installation 103-T: 11 th.Nov.2009 ~ 1 st.Jan : 16 th.Dec.2009 ~ 19 th.Jan :11 th.Nov.2009 ~ 13 th.Jan : 19 th.Oct.2009 ~ 9 th.Dec T 103-NT : 4 th.Dec.2009 ~19 th.Jan NT: 23 rd.Nov.2009 ~ 13 th.Jan.2010

Schedule of 102~106 HVAC System Installation 103-T: 14 th.Dec.2009 ~ 7 th.Jan : 20 th.Jan.2010 ~ 11 th.Feb : 23 rd.Nov.2009 ~ 26 th.Dec : 28 th.Dec.2009 ~ 13 th.Jan T 103-NT : 8 th.Jan.2010 ~11 th.Feb NT: 16 th.Dec.2009 ~ 19 th.Jan.2010

Schedule of 101 Civil Work Step 1: finished Step 2: finished Step 3: finished Step 1 Step 2 Step 3 Step 4 Step 5 Step 4: 19 th.Nov.2009 ~ 9 th.Dec.2009 Step 5: 6 th.Dec.2009 ~ 31 st.Dec.2009

Schedule of 101 Steel Structure & Crane, Elevator Steel structure for BY2 & BY6 : 7 th.Dec.2009 ~ 30 th.Jan.2010 Steel structure for BY4 & BY7: 15 th.Dec.2009 ~ 25 th.Feb.2010 Crane: 1°Steel beam installation: 25 th.Nov.2009 ~ 11 th.Dec °Crane bridge installation: 1 st.Dec.2009 ~ 18 th.Dec °Elevator: Available in the end of Feb °Elevator: Available in the middle of Mar.2009

Schedule of 101 Mezzanine & Silo Foundation Mezzanine: 25 th.Nov.2009 ~ 19 th.Jan.2010 Silo foundation: to be defined

Schedule of 101 Floor & External Wall Floor Step 1: 15 th.Dec.2009 ~ 10 th.Jan.2010 Floor Step 2: 11 th.Jan.2010 ~ 25 th.Jan.2010 Discharge Trench: 25 th.Nov.2009 ~ 30 th.Dec.2009 External Wall: 16 th.Nov.2009 ~ 4 th.Mar.2010 Step 1 Step 2

Schedule of 101 Utility & Electrical & Fire Fighting System Installation Electrical Power System: 16 th.Nov.2009 ~ 5 th.Feb.2010 Piping System: 7 th.Dec.2009 ~ 28 th.Jan.2010 HVAC System: 14 th.Dec.2009 ~ 20 th.Feb.2010 Fire Fighting System: Mixing Room, 27 th. Dec.2009 ~ 20 th.Jan.2010 Fire Alarm System: 16 th.Nov.2009 ~ 12 th.Feb.2010 Warehouse and others, 4 th.Jan.2010 ~ 29 th.Jan.2010

~106 HV Substation Fire Fighting Tanks Fire Fighting Tanks Schedule of Electrical System Civil Work & System Installation HV (10MVA Transformer): 20 th.Oct ~ 25 th.Jan.2010 MV-A/C: 20 th.Oct.2009 ~ 19 th.Feb.2010 Utility MV-A MV-B MV-C MV-D MV-B/D: 20 th.Oct.2009 ~ 2 nd.Feb.2010

~106 HV Substation Fire Fighting Tanks Fire Fighting Tanks Schedule of Electrical System Power Supply Date MV Transformer: 25 th.Jan.2010 MV-B & D: 30 th.Jan.2010 Utility MV-A MV-B MV-C MV-D MV-A & C : 5 th.Feb.2010

Critical Points 1.Hangar East

Hangar Est 1.The interference between the utility building and the existent fire fighting pump station 1. The work activities of Hangar East will be delayed 1.HQCEC(SH) are checking with ROSSO and EUSEBI to find out the solution Status Influence Solutions

Thank You