IEFC 22 March 2011T. Eriksson CERN BE/OP How to ensure a bright future of the AD.

Slides:



Advertisements
Similar presentations
T.Eriksson on behalf of the AD-team CERN, BE department, 1211 Geneva 15 September 2011COOL11 T. Eriksson CERN BE/OP.
Advertisements

Summary of the Design Report and Next Steps Edda Gschwendtner for the CERN AWAKE Project Team Edda Gschwendtner, CERN1.
Spin Filtering Studies at COSY and AD Alexander Nass for the collaboration University of Erlangen-Nürnberg SPIN 2008, Charlottesville,VA,USA, October 8,
1 Low-energy RHIC electron Cooler (LEReC) Update November 17, 2014.
16.Feb.2005MC meeting, LBNL1 CERN infrastructure A.Fabich, CERN AB-ATB All information available at
Re-commissioning the Recycler Storage Ring at Fermilab Martin Murphy, Fermilab Presented August 10, 2012 at SLAC National Laboratory for the Workshop on.
Thomas Roser RHIC Open Planning Meeting December 3-4, 2003 RHIC II machine plans Electron cooling at RHIC Luminosity upgrade parameters.
Electron Cooling Expected Performance & Construction.
Status of the PSB 2 GeV Upgrade and the RCS Study SGUI Meeting B. Mikulec, 07 July 2011.
COULOMB ’05 Experiments with Cooled Beams at COSY A.Lehrach, H.J.Stein, J. Dietrich, H.Stockhorst, R.Maier, D.Prasuhn, V.Kamerdjiev, COSY, Juelich, I.Meshkov,
AD status in 2012, foreseen consolidations at AD ADUC 20/11/2012T. Eriksson CERN BE/OP.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
Low Emittance RF Gun Developments for PAL-XFEL
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
1 Antimatter 1Antimatter and the Universe 2Antimatter in the Laboratory 3Antimatter in Daily Life.
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
Diagnostics for intense e-cooled ion beams by Vsevolod Kamerdzhiev Forschungszentrum Jülich, IKP, COSY ICFA-HB2004, Bensheim, October 19, 2004.
Francois BUTIN CERN EN/MEF.  Future of AD is clearer and deserves investment  New AEGIS experiment being prepared, requires new control room  Existing.
Status of the AD ADUC 13/6/2012T. Eriksson CERN BE/OP.
Status and Prospects for the AD and ELENA
ECOOL Meeting 03/26/10 1 Low-E cooler baseline decisions: 1.FNAL’s cooling section “as is” – with weak solenoids, correctors, etc. (to prevent over focusing.
Accelerator Issues Fermilab Antiproton Experiment Keith Gollwitzer Antiproton Source Department Accelerator Division Fermilab.
ELENA Project GBAR Experimental area L ayout / time scales / questions F. Butin / ELENA collaboration.
FLAIR meeting, GSI March Positron Ring for Antihydrogen Production A.Sidorin for LEPTA collaboration JINR, Dubna.
AD start-up 2014 A rough and brief summary MSWG 16/01/2015T.Eriksson BE/OP1.
Perspectives for polarized antiprotons Paolo Lenisa Università di Ferrara and INFN - Italy Perspectives for Polarized Antiprotons MENU 2013 – Rome, September.
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
ATC/ABOC 2007T. Eriksson CERN AB/OP AD Machine and Experimental Areas – Operation and major problems in 2006, outlook for 2007.
AD/ELENA (B193) Integration and constraints F. BUTIN / ELENA collaboration.
1 NICA Project Report of The Group I S.L.Bogomolov, A.V.Butenko, A.V.Efremov, E.D.Donets, I.N.Meshkov, V.A.Mikhailov, A.O.Sidorin, A.V.Smirnov, Round Table.
Lau Gatignon. The open session of this meeting was fully dedicated to the AD program with 6 presentations by AEGIS, ACE, GBAR, ASACUSA, ATRAP and ALPHA.
Horst Breuker Review Oct ELENA Safety and Radio Protection ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive, Demonstrative (Risk.
MERIT review, Dec. 2005CERN AB-ATB1 CERN installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.
ELENA: Commissioning & operation ELENA beam commissioning Operation 12/11/2015T.Eriksson CERN BE/OP/AD1.
LEPTA: Low Energy Particle Toroidal Accumulator Presented by: Mkhatshwa S. L. Nkabi N. Loqo T. Mbebe N. Supervisor: A. Sidorin SA STUDENT PRACTICE 2010.
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
19 January 2006 PS&SPS DAYS AD equipment tests and startup with beam Slide 1 AD and AD experimental areas: equipment tests and startup with beam Tommy.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
Villars, 26 September Extra Low Energy Antiproton Ring (ELENA) for antiproton deceleration after the AD Pavel Belochitskii for the AD team On behalf.
ELENA KICKERS AND SEPTA ELENA Meeting, Prepared by J. Borburgh, E. Carlier, A. Fowler, L. Sermeus TE/ABT.
13 January 2005 PS&SPS DAYS How can we restart AD in 2006? Slide 1 How can we restart AD in 2006 ? Tommy Eriksson AB/OP/AD.
Progress of Bunched Beam Electron Cooling Demo L.J.Mao (IMP), H.Zhang (Jlab) On behalf of colleagues from Jlab, BINP and IMP.
T.Eriksson P.Belochitskii G.Tranquille CERN, BE department, 1211 Geneva 9 September 2011T. Eriksson CERN BE/OP.
Low Energy Antiproton Facility at CERN Christian Carli on behalf of the AD and ELENA team …. with special thanks to P.Beloshitskii, T.Eriksson and S. Maury.
Slide 1 Overview Introduction Stochastic Cooling History of the Antiproton machines at CERN The AD and ELENA Conclusion.
ELENA installation progress F. Butin / ELENA collaboration.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
Installation at Isolde (and costs) TSR at Isolde workshop CERN, 29/30 October 2012 Isolde Erwin Siesling.
Steering committee ELENA Project Structure S. Maury, project leader C. Carli, deputy project leader Beam physics and Performance Committee (G. Tranquille,
Vacuum System P. Chiggiato TE-VSC
Parameters of ejected beam
ESR Slow highly charged ions and antiprotons
Status of HESR 18th March Gießen Dieter Prasuhn.
Overview of Extra Low ENergy Antiproton ring (ELENA) and TE-EPC contribution to the project TE-EPC Group Meeting Michal Dudek 25th June 2015.
ELENA installation and commissioning status
Alternative/complementary Possibilities
Options and Recommendations for TL and Dumps
AD consolidation activities in LS2
ELENA Beam Transfer Workpackage
ELENA Overview and Layout Start of ELENA Commissioning Next Steps
SPSC123 Summary Lau Gatignon/EN-EA IEFC, 4 November 2016.
Siara Fabbri University of Manchester
How can we restart AD in 2006 ? Tommy Eriksson AB/OP/AD
ELENA Extra Low ENergy Antiproton Ring
J. Seeman Assistant Director for PPA/LCLS
Cooling Time Measurements
HESR for SPARC 25th November FAIR MAC Dieter Prasuhn.
Plans for future electron cooling needs PS BD/AC
Presentation transcript:

IEFC 22 March 2011T. Eriksson CERN BE/OP How to ensure a bright future of the AD

Contents Present and future projects: –AEGIS –PAX –Gbar –Other Impact of ELENA installation AD consolidation IEFC 22 March 2011T. Eriksson CERN BE/OP

AEGIS IEFC 22 March 2011T. Eriksson CERN BE/OP Approved experiment: AD-6 Will share beamtime with the 3 existing main users ALPHA, ASACUSA and ATRAP. Physics goals: Measurements of gravitational interaction matter-antimatter Hbar spectroscopy Etc.

AEGIS IEFC 22 March 2011T. Eriksson CERN BE/OP

AEGIS – present status Concrete support structure for ATRAP positron installation replaced to make place. Water pipes re-routed Beamline/vacuum installed Magnets/power converters/interlocks installed and tested in 2010 GEM detectors installation to be finalized 03/2011 IEFC 22 March 2011T. Eriksson CERN BE/OP

AEGIS plan IEFC 22 March 2011T. Eriksson CERN BE/OP 2011: April/May: preparation of the zone for positron accumulator, magnets (incl. power and cabling) June/July: arrival and installation of the positron accumulator August/September: installation of the 5 T magnet + transfer section + traps October: cryogenics installation/commissioning November: commissioning of trapping of antiprotons 2012: January/February/March: installation of the 1T magnet + lasers April/May: commissioning June-November: commissioning of the different physics processes 2013: work with protons : work with antiprotons, antihydrogen, antihydrogen beam

PAX Spin filtering of antiprotons with internal polarized gas target Build up polarized pbar beams in AD (0.3 to 1 GeV/c) Low-beta insertion in AD sect.15/16 including openable cell Upgrade of electron cooler (40 => 300 kV) Stacking in AD Siberian snake in sect. 42/43 (longitudinal polarization) to follow Step-by-step approach proposed for installation Tests and studies with protons ongoing at Cosy IEFC 22 March 2011T. Eriksson CERN BE/OP

PAX plan, ~5 yrs 1:st stage: Low beta section –Set-up AD with insertion (6 quads), QDN15 remains in place –PAX optics setup, beam lifetime 2:nd stage: Experiment installation –Remove QDN15, install PAX target chamber –Inject polarized H atoms, measure transverse beam polarization 3:rd stage: 300 keV electron cooler –Measure transverse polarization at higher energies 4:th stage: Siberian Snake –Install 2Tm solenoids, measure longitudinal polarization IEFC 22 March 2011T. Eriksson CERN BE/OP

PAX layout IEFC 22 March 2011T. Eriksson CERN BE/OP

PAX 1:st stage: Insertion 15/16, spin filtering at 300MeV/c IEFC 22 March 2011T. Eriksson CERN BE/OP

PAX status A detailed step-by-step plan has been worked out All equipment will be supplied by PAX A rough identification has been made of: –CERN manpower needs (~5 MY) –Risks Set-up duration AD performance Insertion optics Vacuum –Impact on existing physics program Proposal submitted to SPSC – under consideration IEFC 22 March 2011T. Eriksson CERN BE/OP

Gbar Gravitational Behaviour of Antihydrogen at Rest Saclay project – continuation of SOPHI R&D (Irfu) Competition with AEGIS Proposal being prepared Trap (tested at Riken) High intensity Positron source (need space in AD hall) Need to consider new location of AD kicker platform IEFC 22 March 2011T. Eriksson CERN BE/OP

Gbar IEFC 22 March 2011T. Eriksson CERN BE/OP

Other: new ASACUSA sub-group New ASACUSA experiment proposal (SPSC in 2011?) Internal gas-jet target Requires circulating beam at 40keV Need only a few thousand turns Initially planned as new e-static ring in ASACUSA zone Could be done in ELENA by deceleration down to 40 keV –Deceleration with e-cooler => avoid beam blow-up –Main B field 500 => 300 G –No vacuum improvement needed IEFC 22 March 2011T. Eriksson CERN BE/OP

IEFC 22 March 2011T. Eriksson CERN BE/OP Extra Low ENergy Antiproton ring for antiproton deceleration after the AD ELENA

ELENA layout in AD Hall IEFC 22 March 2011T. Eriksson CERN BE/OP

ELENA main parameters Momentum range, MeV/c Energy range, MeV Circumference, m30.4 Intensity of injected beam3 × 10 7 Intensity of ejected beam2.5 × 10 7 Number of extracted bunches4 Emittances (h/v) at 100 KeV, π·mm·mrad, [95%]4 / 4 ∆p/p after cooling, [95%]10 −4 Bunch length at 100 keV, m / ns1.3 / 300 Required (dynamic) vacuum, Torr3 × 10 −12 IEFC 22 March 2011T. Eriksson CERN BE/OP

ItemMaterial (kCHF)Manpower FSU or charged (kCHF) CERN Manpower FTE (MY) Needed manpower contribution FTE (MY) Magnets (ring+inj. line) 1590(*) Power converters Injection/ejection septa Injection/ejection kickers Electron cooler Vacuum, ring+inj.line RF + Schottky diagnostics B-trains Diagnostics Controls H- source Experimental area:lines, vacuum, monitors Mech. Design/Drawings 347kCHF/4 MY (**) 13.0 Div Total (MCHF/MY) Grand Total (MCHF/MY) ELENA cost estimate

ELENA - status Updated ELENA project and cost estimate has been presented to various CERN committees  IEFC, SPSC, SPC  recommendation made at RB in December: "An updated cost and feasibility study has been finalized for the ELENA upgrade of the AD facility [8], validated by the IEFC committee. The SPSC re-iterated its strong support to the project. The motivation has been strengthened by recent breakthrough at the AD with the successful trapping of antihydrogen. The Research Board endorsed the strong scientific case for ELENA. All efforts are encouraged to ensure that the required resources are found, within the collaboration or elsewhere, so that ELENA can go ahead, securing the long-term future of the AD program." IEFC 22 March 2011T. Eriksson CERN BE/OP No approval in March 2011 RB, but very positive outlook:  Project structure under discussion => answer soon…  TDR to be started ASAP  Should be put in MTP

Planning Planning stretched in order to minimize impact on physics program 1. Design, fabrication, installation of ELENA whilst using the existing ejection lines for 5.3 MeV => ~ 3 years 2. Commissioning of ELENA in parallel with physics => ~ 6 months 3. Installation and commissioning of new 100 keV ejection lines (physics stopped) => 0.5 to 1 year =>Total duration 4 to 4.5 yrs IEFC 22 March 2011T. Eriksson CERN BE/OP

Possible ELENA planning IEFC 22 March 2011T. Eriksson CERN BE/OP

IEFC 22 March 2011T. Eriksson CERN BE/OP CERN Pbar timeline AA –3.57 GeV/c Antiproton Accumulator ring; –10^12 pbars stored (peak). p/pbar collisions in SPS –+ low energy experiments in LEAR AAC (AA+AC) –Large acceptance Antiproton Collector ring added. Production rate increased 10-fold to 6*10^10 pbars/h ?AD –AC converted from fixed energy storage ring to Decelerator. 5*10^7 pbars slowed down to 100 MeV/c (5.3MeV kinetic). Local experimental area. 2016?-2026+AD/ELENA? –Small post-decelerator ring to be added –Cooling and deceleratoin to 100 keV –Electrostatic beamlines and new experiments…

IEFC 22 March 2011T. Eriksson CERN BE/OP Consolidation – AD machine A limited consolidation program was launched in 2009 in view of continued AD operation until 2016/17 (=1/3 of the proposed items/budget): ItemGroupRSRS after  manpower MM M09M10M11M12M13 MYkSfr AD MagnetsTE-MSC156<2.4 (*) AD power convertersTE-EPC103<4.3 (*) AD controlsBE-CON.A 0000 AD vacuum ion pumpsTE-VSC AD vacuum ion pump power supplies&controlsTE-VSC AD Stochastic cooling p/u&kicker movementBE-RF92150 AD Stochastic cooling electronicsBE-RF AD C02 systemBE-RF AD target area ventilation & interlocksEN-STI AD target water cooling + ctrlsEN-STI AD kicker oil systemTE-ABT AD kicker power supply/controls upgradeTE-ABT AD ejection line power convertersTE-EPC AD C10 systemBE-RF AD power converter sparesTE-EPC Yearly total (kSfr) Grand total (kSfr)2280

AD consolidation For running until >2026: –Re-iterate 2009 exercise => –~ 40 items such as: Target area Stochastic cooling tanks Etc. –Infrastructure… –Consolidation campaign started in 2010 for the experimental hall: safety, user facilities etc. ==  IEFC 22 March 2011T. Eriksson CERN BE/OP

New storage bdg (2012) New control rooms ( ) New gangway (2011) Suppress AEGIS gangway (2011) Emergency exit Crete Rack space on 2 floors Workshop Kicker platform ? ELENA ? New access (2011) Visits to AD machine ExitExit =new access control (5) Create exit Infrastructure consolidation: Access control upgade RP shields upgrade New gangways for circulation and evacuation improvement New control rooms for ALARA respect and racks/ storage space increase Cranes upgrade for more efficient and safer handling Cryogens distribution audit Ventilation system audit Review needs for smoke/ODH detection Provide long term (bdg 133) and short term (new building) storage facilities New cafeteria/ toilets / meeting room / parking New visit itineraries and procedures Consolidation AD Hall+ infrastructure

New control rooms for AD experiments nd Stage (2012): 5.Cafeteria 6.ATRAP control room 7.ACE Ccontrol room 8.Toilets 1 st Stage (2011): 1.Toilets 2.AEGIS Control Room 3. Entry module level1 4.Technical room 9 3 rd Stage (2013): 9.Stairs exit module level 1 10.Stairs entry module level 2 11.Toilets 12.ASACUSA Control room 13.ALPHA control room 14. Meeting room 15.ELENA related control room 16.Toilets 17.Stairs exit module level 2