ISAS/JAXA Tracking station. Usuda Deep Space Center Diameter 10m –AE 44% expected Feed & Receiver –Ka-band Trx < 50K expected –cooled LNA –Tsys 140 K.

Slides:



Advertisements
Similar presentations
KVN Multi-frequency Phase Referencing: with the KVN and beyond R.Dodson 1,2 T.H. Jung 1, M. Rioja 2,3 KVN, Korea: ICRAR, UWA, Australia: OAN, Spain.
Advertisements

KVN Recent Progress of Daejeon Correlator Se-Jin Oh Duk-Gyoo Roh, Jae-Hwam Yeom, ChungSik Oh, Jinseung Jung, Dong-Kyu Jung, Youngjoo Yun, A. Miyazaki,
Mark 5C VLBI Data System Alan Whitney MIT Haystack Observatory 16 June 2008 e-VLBI workshop Shanghai, China.
Status of KVN Instrumental Phase Calibration System Development Do-Heung Je 1, Moon-Hee Chung 1, Ji-Man Kang 1, Seung-Rae Kim 1, Min-Kyu Song 1, Sung-Mo.
Digital PM Demodulator for Brazilian Data Collecting System José Marcelo L. Duarte – UFRN – Natal, Brazil Francisco Mota das Chagas – UFRN – Natal, Brazil.
Status and future plan of VERA project H.Kobayashi Mizusawa VLBI observatory Mizusawa VLBI observatory National Astronomical Observatory of Japan 2009.July.21.
Japanese VLBI programs, East Asian VLBI Network and Space VLBI;VSOP-2 H.Kobayashi(NAOJ) 2011, Jan., 27 Future of VLBA.
Current status of OCTAVE
KVN Single-dish Test Observations of the KVN Yonsei telescope at 22/43 GHz - Performance of KVN Yonsei telescope at 22/43GHz Sang-Sung Lee March 18, 2009.
Space radio astronomy observations Y.Hagiwara (NAOJ)
Implement a 2x2 MIMO OFDM-based channel measurement system (no data yet) at 2.4 GHz Perform baseband processing and digital up and down conversion on Nallatech.
January 2007 backnext All rights reserved © 2007, Alcatel Alenia Space Page 1  BepiColombo: Ka-band Translator  R. Giordani, L. Simone  February 27,
Very Long Baseline Interferometry (VLBI) – Techniques and Applications Steven Tingay ATNF Astronomical Synthesis Imaging Workshop Narrabri, 24 – 28 September,
Communications - Access Schemes 1 Introduction to Space Systems and Spacecraft Design Space Systems Design.
Bearing Systems General Principle: Need two signals: –1. One whose phase varies with bearing from (or to) the transmitter –2. A reference signal whose.
Communication and Ground Station 12 October 2008.
Ongoing e-VLBI Developments with K5 VLBI System Hiroshi Takeuchi, Tetsuro Kondo, Yasuhiro Koyama, and Moritaka Kimura Kashima Space Research Center/NICT.
LOFAR Antenna Systems Dion Kant, Wim van Cappellen AAVP – 10 December 2010, Cambridge, UK.
AuthorMeeting Title Date 1 EVLA Systems PDR Receivers/Feeds Daniel (Mert) MertelyEVLA System PDR:Receivers/Feeds 28 November, 2001.
VSOP-2 Ground Link Station - Tracking Station Requirements - National Astronomical Observatory of Japan Y. Kono.
E-VLBI developments with the K5 VLBI system Koyama Yasuhiro *1, Kondo Tetsuro *1, Kimura Moritaka *1, Takeuchi Hiroshi *1, and Masaki Hirabaru *2 *1 Kashima.
KVN Current Status of Daejeon Correlator for EAVN Se-Jin Oh and staff of Correlator team of KASI/NAOJ 8 th East Asian VLBI Workshop, 8~10 July
Next Space VLBI mission: VSOP-2
Status of Korean Participation in the SKA Project Minho Choi (KASI) SKA Japan Workshop NAOJ, Mitaka.
KVN RAS in KOREA Current status. RAFCAP 7 th meeting, Tokyo, 5 June, 2010 Final Goals for Freedom Challenge and Change - Domestic and International Activities.
Grant Hodgson G8UBN New Microwave Transverter Concepts.
上海天文台 Shanghai Astronomical Observatory e-VLBI Progress in China Zhang Xiuzhong, team of Chinese VLBI Network Shanghai Astronomical Observatory Chinese.
VLBI2010 Reference antenna for antenna deformations and site ties East Coast Geodetic VLBI Meeting Feb, 2011, Haystack Observatory Bill Petrachenko.
Recent determination of Gamma with Cassini M.T. Crosta, F. Mignard CNRS-O.C.A. 5th RRFWG, June, Estec.
上海天文台 Shanghai Astronomical Observatory Recent VLBI Activities in China Zhi-Qiang Shen (Shanghai Astronomical Observatory) 2009 East Asia VLBI Workshop.
1 1 January 27, 2009 VLBI2010 Proof-of-Concept Signal Chain Arthur Niell MIT Haystack Observatory.
THE SOFTWARE CORRELATOR FOR ESA DELTA-DOR L. Iess, R. Abelló, A
The OCTAVE-DAS and correlator system for VERA, JVN, Japanese e-VLBI(OCTAVE) and KJJVC Tomoaki Oyama1, Yusuke Kohno1, Syunsaku Suzuki1, Masahiro Kanaguchi1,
Closing Remarks Mar , 2009 LG Convention Hall, Ewha Womans Univ.
1 Gbps Disk-Based VLBI Observation for Future East Asia VLBI Observations Kiyoaki Wajima 18 March 2009 동아시아 VLBI 워크샵 Yamaguchi University Introduction.
Possible Engineering Support for Dual Polarization and Ultra Wide Band Observation with EAVN N. Kawaguchi National Astronomical Observatory East Asia VLBI.
Japanese VLBI activities and East Asian VLBI Network H.Kobayashi(NAOJ)November,23, South African SKA, Postgraduate Bursary Conference.
The Progress Report for KVN Construction Seog-Tae Han and KVN staffs Korea Astronomy and Space Science Institute March18 th 2009.
Status and future of East Asia VLBI network H.Kobayashi(NAOJ) East Asia VLBI
ASTRO-G project VSOP-2 – VLBI Space Observatory Programme times higher sensitivity. 10 times higher frequency observation 10 times higher resolution.
Answers from the Working Group on AGN and jets G. Moellenbrock, J. Romney, H. Schmitt, V. Altunin, J. Anderson, K. Kellermann, D. Jones, J. Machalski,
2005 October 17East Coast Geodetic VLBI Meeting1 Instrumental effects in geodetic VLBI Brian Corey (with copious cribbing from Alan Rogers’s 1991 Chapman.
The ALMA Phasing Project (APP) APP is an ongoing ALMA Development Project (approved in 2012) to provide the hardware and software necessary to coherently.
Leon Abeyta LO-IF Engineer EVLA LO-IF PDR 22 January EVLA LO/IF Central and Antenna Reference Generation.
Multi-frequency Phase Referencing VLBI Observation - Phase Referenced Image - Tae Hyun Jung, Bong Won Sohn, Hideyuki Kobayashi, Tetsuo Sasao, Tomoya Hirota,
Giga-bit Geodesy e-VLBI at 22GHz Hiroshi Takaba Gifu University, Japan.
VLBI Oct Development Status of Broadband VLBI System (Gala-V) -(II) M.Sekido (1), K.Takefuji (1), H.Ujihara (1), M.Tsutsumi.
Canada’s Natural Resources – Now and for the Future Broadband Delay Tutorial Bill Petrachenko, NRCan, FRFF workshop, Wettzell, Germany, March 18, 2009.
ASTRO-G Ground Tracking Station Plan Y.Murata (JAXA) Start from HALCA design Functions –Uplink reference signal –Data demodulation –Data recording –Telemetry.
Possible eVLBI connection between Eastern Asian Observatories Noriyuki KAWAGUCHI National Astronomical Observatory, Japan eVLBI Workshop
Next Generation Space VLBI Project: VSOP-2 Inoue, M. 1, Nagai, H. 1, Asada, K. 2, Saito, H. 2, Tsuboi, M. 2, and the Next Generation Space VLBI Working.
Single Dish Summer School, Green Bank 2007 Things to do with Single Dish: VLBI Tapasi Ghosh NAIC/Arecibo Observatory Outline: Interferometry Basic.
About JVN about JVN Status Status Results Results Future plans Future plans Japanese VLBI Network (JVN): recent results and future plans for EAVN Kenta.
1 Date Uniboard Application for Korean VLBI Network (KVN) Jae-Hwan Yeom, MiYoung Jung & Bong Won Sohn.
Status Following these success of VSOP, science targets of VSOP-2 approach the central region of AGN. studies of accretion disks and jets in AGN studies.
National Astronomical Observatory of Japan Yusuke Kono
Improvement of PCAL Signal Distribution on RT-32 Radio Telescopes
Geodetic VLBI activities in China
Haystack Geodesy Program and Technical Development
Radio Astronomy in Japan
EVLA System PDR System Overview
Field Measurements of 2x2 MIMO Communications
Simultaneous Multi-Frequency Obs. -Phase Compensation, mm-VLBI
(National Astronomical Observatory of Japan)
Groundstation workshop : A Flashback
VSOP-2 project Update Hisashi Hirabayashi /JAXA VSOP-2 Project status
Action Items Following these success of VSOP, science targets of VSOP-2 approach the central region of AGN. studies of accretion disks and jets in AGN.
160 MHz Transmissions Date: Authors: July 2010 Month Year
EVLA Advisory Panel Mtg. System Overview
Gunter Neugebauer VE7CLD
Presentation transcript:

ISAS/JAXA Tracking station

Usuda Deep Space Center Diameter 10m –AE 44% expected Feed & Receiver –Ka-band Trx < 50K expected –cooled LNA –Tsys 140 K (fine condition)

Feed DIP TX- AMP U/C D/CLNA H-Maser DDS O/EE/O O/E LO O/EE/O U/C DDS LO D/C LO DEMPD FMT CLK GEN LO Mark5B Cooled VSOP-2 Ground System (Based on halca method) PC OBS Simulator CMD/MON Freq, Phase Controller 40.0 GHz 37.5 GHz 100MHz (±2MHz) 100MHz 1100MHz 100MHz (±2MHz) 500 MHz 5,900MHz 7,000MHz 26,000MHz 4,500MHz 7,000MHz 6,500MHz 100MHz 500MHz 100MHz10MHz VSI-H 1PPS 100MHz 400MHz Freq, Phase Control 26,000MHz Software Spectro- scope Ether Freq, Phase Control Network Ether 7,000MHz EtherGP-IB Antenna RoomOperation Center U/C 1,000MHz LO FIFO Carrier track

Feed DIP TX- AMP U/C D/CLNA H-Maser O/EE/O O/E LO O/EE/O LO D/CDEMPD FMT LO Mark5B Cooled VSOP-2 Ground System (w/o Doppler Comp.) PC OBS Simulator CMD/MON Freq, Phase Controller 40.0 GHz 37.5 GHz 100MHz 500 MHz 7,000MHz 26,000MHz 4,500MHz 7,000MHz 6,500MHz 100MHz 500MHz 100MHz10MHz VSI-H 1PPS 26,000MHz Software Spectro- scope Ether Network Ether 7,000MHz EtherGP-IB Antenna RoomOperation Center LO FIFO

Doppler compensation needed? Related Matters –Band mismatch –PLL Loop stress –Phase characteristics of onboard instruments –Correlator capability –System construction cost

Band mismatch Doppler shift: ~1MHz (f=40GHz, rr=7km/s) Band-mismatch: 126 MHz (128 – 2 MHz) Degradation of SNR : 0.99 (√126/ 128)

PLL Loop stress Relation between Doppler rate and PLL : Natural angular frequency of second order loop(rad/sec) : Rate of change of angular frequency (rad/sec2) : Phase error of Phase Lock Loop, threshold ( ~12deg.)

Phase characteristics of instruments Phase fluctuation dφ by df : Easy estimation –H up (f)- H down (f)=2πfτ –Group delay characteristicsτ: ~ 1nsec –Phase fluctuation dφ ~ 0.36 deg (df~1MHz) Phase characteristics measurements needed before launch

Data Storage Storage Terminal with VSI –Mark5B (Haystack) –K5-VSI (NiCT) –Clock fluctuation compensated by FIFO? Corrlator interface –VLBA correlatorMark5 –ENV correlatorMark5 –EAVN* correlatorMark5, K5, VERA terminal *EAVN (East Asia VLBI Network)

East Asia VLBI Network Correlator Korea-Japan Joint VLBI Correlator (KJJVC) –KVN and NAOJ KVN, VERA, JVN, VSOP-2 Seoul 16 stations Data buffer Data rate –Max. 8 Gbps/st

Summary UDSC 10m antenna is expected to VSOP- 2 GTS Doppler compensation system depends on cost. Several VSI storages are available –Mark5B is better for operational easiness at three correlators.