ALICE TPC Status, Meeting with LHCC referees 30.6.031 ALICE TPC – Status Report Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader:

Slides:



Advertisements
Similar presentations
Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Advertisements

Front-end electronics for the LPTPC Outline of the talk:  System lay out  Mechanics for the front-end electronics  End-cap and panels  Connectors and.
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
TPC meeting, NBI, 2-3 September 2002Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, Copenhagen, 2-3 September 2002 Børge Svane Nielsen, Jørn.
TPC meeting, CERN, 7-8 October 2003Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, CERN, 7-8 October 2003 Børge Svane Nielsen, Niels Lindegaard,
8-3-05Jens Jørgen Gaardhøje. NBI. ALICE-CR5 1 ALICE Forward Detectors Technical Design Report Editorial team: I.G. Bearden (NBI) H. Bøggild (NBI) C.Holm.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
ALICE TPC field cage status Sardinia May 2004 Michael Hoch Cern-TA2.
Status of the ATLAS MM project
HEP2005, Lisboa July 05 Roberto Campagnolo - CERN 1 HEP2005 International Europhysics Conference on High Energy Physics ( Lisboa-Portugal,
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
Technical Forum Alice week Clemens Adler Transition Radiation Detector Status Participating Institutions: Athens University, NIPNE Bukarest, JINR.
LHCC referees meeting, 10 October 2005Børge Svane Nielsen, NBI1 Status of the FMD LHCC referees meeting, 10 October 2005 Børge Svane Nielsen Niels Bohr.
1 FEE Installation & Commissioning TPC Meeting, 21 April 2006 L. Musa.
LHCb MUON MPWC STATUS OF TOOLING, SITES, PRODUCTION AND MATERIAL PROCUREMENT.
Hans-Åke GustafssonLHCC review January 31, ALICE meets LHCC referees 31/01/ :00  Milestones report H-A Gustafsson  FMD questions H. Boggild.
1 SBS Spectrometer / GEP5 Conf.. 2 Tracking Requirements Requirements Tracking Technology DriftMPGDSilicon High Rate: MHz/cm 2 (Front Tracker)
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
ALICE-LHCC Review January 29-30, 2001 Thomas C. Meyer/EP-AIT1 General Layout Four separate vessels: –Outer containment vessel –Inner containment vessel.
TPC-Meeting : Københaven Ne-CO 2 Gas System : Status CO 2 - Gas System : Insulating Gap Resistor Rod : –Contacts –Cooling --> Liquid –Cooling -->
February 12 th, 2004 Heidelberg TPC Meeting J.B. TPC SECTOR TEST at T10 May 3 rd – June 2 nd MOTIVATION REQUIREMENTS STATUS OF SYSTEM TIME SCHEDULE CONCLUSIONS.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
TB Peter Glässel, Heidelberg1 TPC Progress Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
FEE + ROC cooling S. Popescu CERN, U. Frankenfeld, H.R. Schmidt GSI.
ALICE-LHCC Review May 14, 2001 Thomas C. Meyer/EP-AIT1 TPC Field Cage Progress Report Project Schedule Technical Progress & Prototyping Contractual Matters.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
TB Peter Glässel, Heidelberg1 TPC Progress.
S.Vereschagin, Yu.Zanevsky, F.Levchanovskiy S.Chernenko, G.Cheremukhina, S.Zaporozhets, A.Averyanov R&D FOR TPC MPD/NICA READOUT ELECTRONICS Varna, 2013.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
ALICE TPC, Schleching The ALICE TPC Team Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
Installation Review March ‘03 TPC Thomas C. Meyer/EP-AIT 1 Pre-installation and Functional Tests StartFinish  Certification of field cage…………………
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
G. Carboni – Muon Meeting – April 2002 Muon Meeting LHC schedule is now official (Council Committee) First protons (Pilot run) delayed to
The ALICE TPC C. Garabatos, GSI. Vienna 2004C. Garabatos, GSI Darmstadt2 TPC |  | < 0.9 (full length tracks) |  | < 0.9 (full length tracks) 845 < r.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
17th March 2005Bernardo Mota / CERN - PH TPC FEE Status and Planning CERN, 7th March 2005 Content  Introduction  Status and Milestones  PASA, ALTRO.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
1 HBD update Itzhak Tserruya DC Upgrades meeting, January 14, 2005 NIM paper II: Generic R&D ~ completed Full scale prototype construction Pending issues.
Como, October 15-19, 2001H.R. Schmidt, GSI Darmstadt 1 The Time Projection Chamber for the CERN- LHC Heavy-Ion Experiment ALICE ALICE Detector overview.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
A New GEM Module for a Large Prototype TPC: Status and Plans By Stefano Caiazza On behalf of the FLC DESY.
Muon Meeting April 2004JsG Status of Chambers Production at CERN Jean-Sebastien Graulich o Open Questions from the PRR O-ring Aging, Aging tests, Storage.
G. Carboni - Muon Meeting – Muon Meeting 12/ Agenda IntroductionGiovanni (30’) GEM and TDR AddendumWalter (20’) Update on M1 ratesAlessia.
TB Peter Glässel, Heidelberg1 TPC Status Report Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
Technical FORUM, Peter Glässel, Heidelberg1 TPC Progress Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel,
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
TPC electronics Status, Plans, Needs Marcus Larwill April
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
1 19 th January 2009 M. Mager - L. Musa Charge Readout Chip Development & System Level Considerations.
IBL – UniGe involvements UniGe Team : G. Barbier, F. Cadoux, A. Clark, S. Débieux, D. Ferrère, C. Husi, G. Iacobucci, M. Weber Other member (KEK): Y. Takubo.
Trigger efficicency on double tracks Trigger efficiency on isolated tracks Final results of the Trigger Test on the 25ns beam Bx NUMBER Fraction of Triggers.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
T2 GEM Production in Helsinki Kari Kurvinen TOTEM T2 EDR meeting Radiation Detector Laboratory of Helsinki Institute of Physics (HIP) and Department.
The ALICE TPC Readout Control Unit 10th Workshop on Electronics for LHC and future Experiments 13 – 17 September 2004, BOSTON, USA Carmen González Gutierrez.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
1 16 July 2009, Kraków EPS-HEP 2009 Adam Matyja ALICE TPC design and performance Outline Components  ReadOut chambers  Drift voltage system  Gas system.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
21 Mar 2007ALICE - Paul Dauncey1 ALICE CR07: Installation and Commissioning Paul Dauncey Material from: L. Leistam: “ALICE Status” W. Riegler: “Commissioning.
September 5, Burkhard Schmidt Integration and Installation Outline: Integration and Infrastructure issues -Suspended platforms -Cable chains -Beam.
Technical Design for the Mu3e Detector
Pre-installation and Functional Tests
New field cage LP2 Ole Bach, Bernd Beyer, Volker Prahl
TPC Field Cage Progress Report
TPC Detector Control System
SALTRO16 activities in Lund
Presentation transcript:

ALICE TPC Status, Meeting with LHCC referees ALICE TPC – Status Report Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg Technical coordinator: Peter Glässel, Heidelberg Bergen D. Röhrich Data acquisition BratislavaB. Sitar 1/2 IROC series production CERN T. Meyer Field cage CERN L. Musa Electronics Copenhagen B.S. Nielsen Laser system KrakowM. Kowalski Simulations Darmstadt GSI H.R. Schmidt ROC engineering, prototyping, series production, simulations Darmstadt TU H. Oeschler Electronics testing Frankfurt R. Renfordt Electronics testing, installation Heidelberg KIP V. Lindenstruth Data acquisition, HLT Heidelberg PIJ. Stachel Electronics, engineering, IROC production, OROC production Lund H.A. Gustafsson Electronics

ALICE TPC Status, Meeting with LHCC referees Outline Field cage Readout chambers Laser system Cooling system Gas system Readout electronics Schedule

ALICE TPC Status, Meeting with LHCC referees TPC Field Cage Overview Inner and outer Isolation vessels Aluminum End Plates housing ROC’s Field defining system: strips supported by rods

ALICE TPC Status, Meeting with LHCC referees Field Cage Parts, Overview Drift volume Isolation volume End wheel Central membrane OCV OFV IFV Central drum cone ICV

ALICE TPC Status, Meeting with LHCC referees Field Cage: Mounting Rod Supports

ALICE TPC Status, Meeting with LHCC referees Field Cage: Rod Assembly

ALICE TPC Status, Meeting with LHCC referees Resistor Rod status Completed: Gas-cooled prototype Contacts ok Still a few improvements needed Rather complicated to produce Needs separate CO 2 gas system Water-cooled prototype Full prototype end July03 HV tests both successful Resistor tests: stability, overvoltage tolerance Water-cooled rod preferred solution In progress: Tooling and pieces for production (water cooled) Concerns: Tight schedule (first 2 rods needed Dec03), manpower

ALICE TPC Status, Meeting with LHCC referees Resistor Rod Cooling gas cooled water cooled High-resistivity water 10 G10 Separator Resistor Cu-heat bridges Ceramic pipeResistor insulation volume (gas) gnd100 kV

ALICE TPC Status, Meeting with LHCC referees Field Cage Inner Drum Delivered by Fischer Al strips (ground) prepared

ALICE TPC Status, Meeting with LHCC referees The Inner FC vessel is being rebuilt What happened: Leak test: 25 Feb03 --> leaks at glue joint between composite and flange Ultrasonic test: 27 Feb03 --> faulty glue bonds First repair by Fischer: Mar03, only on outer joint Decision to rebuild: 24 Apr03, order 6 May03 Consequences: Repeat work: Assembly at CERN Jul03 Leak test, guard rings, vias, Resistor chain, rod supports Total delay 7 months, Ready to install rods Dec03 Complete FC equipment Jul04 Defective vessel

ALICE TPC Status, Meeting with LHCC referees Impact of FC Schedule on Pre-Installation 7 months 3 month float Pre-commissioning of TPC shortened from 13 to 6 month

ALICE TPC Status, Meeting with LHCC referees Field Cage: Central Electrode

ALICE TPC Status, Meeting with LHCC referees Field Cage: Central Electrode Completed: Modification of stretching machine Stock of 6m wide glued mylar foil Stretching and rupture test electrode frames and manipulation tool Not started yet: Production of 3 electrodes (not earlier than needed)

ALICE TPC Status, Meeting with LHCC referees Field Cage Status Summary Completed: Mounting rod supports on OFV Inner cones Central drum In progress: Gluing standard rods Gluing laser rods Not started yet: Rebuild of IFV (assembly at CERN Jul03) Testing and equipment of new IFV Load test on outer insulation volume Rebuild of one inner cone (change of dimensions at muon absorber)

ALICE TPC Status, Meeting with LHCC referees Service Support Wheel Completed: Design of frame and services Prototype sectors for FEE assembly trial In progress: Construction Design of details for connection to ITS services and beam pipe Concerns: Installation of FEC’s difficult, tight space Carries FEE and services

ALICE TPC Status, Meeting with LHCC referees Front End Card Installation FEC in Cu sandwich 6 cables per FEC connectors with locks Model setup at GSI to study FEE installation development of tool for cable insertion, connector locking/ unlocking IROC

ALICE TPC Status, Meeting with LHCC referees IROC Production Bratislava Quality good Very uniform wire spacing Very uniform wire tension Leak and gain tests lagging behind due to (trivial) technical problems, mostly solved already Production running smoothly now at 2 ch/month not on critical path

ALICE TPC Status, Meeting with LHCC referees OROC Production Heidelberg/GSI Initial problems with segmented pad planes solved, but still more difficult than anticipated (2 padplanes out of 14 have to be redone) Leak rate lower per area than IROC Each chamber is surveyed, geometry within specs Production running at 1 ch/week now

ALICE TPC Status, Meeting with LHCC referees OROC Production Heidelberg/GSI Survey of planarity and pad geometry

ALICE TPC Status, Meeting with LHCC referees OROC Production Heidelberg/GSI Coarse and fine adjustment of a wire plane

ALICE TPC Status, Meeting with LHCC referees OROC Production Heidelberg/GSI Measuring wire tension

ALICE TPC Status, Meeting with LHCC referees OROC Production Heidelberg/GSI Chamber in test setup

ALICE TPC Status, Meeting with LHCC referees ROC Status Summary Completed: Assembled: IROC 27, OROC 12 Tested: IROC 18, OROC 5 In progress: Production rates: OROC 1 ch/week, IROC 2 ch/mo Expect to finish early 2004 Concerns: OROC: gluing of pad plane (4 sectors) more difficult than anticipated Testing in Bratislava not yet fully operational

ALICE TPC Status, Meeting with LHCC referees Laser System Completed: Micro-mirrors: delivered, tested and selected Preparation of laser rod segments and mirror holders Tooling for gluing rods In progress: Assembly of laser rods (till Sep03) Procurement/construction of optics elements Concerns: none

ALICE TPC Status, Meeting with LHCC referees Electronics Cooling 27 kW to be removed System design nearly completed, draft document exists PRR in fall FEE cooling ROC padplane thermal screen

ALICE TPC Status, Meeting with LHCC referees TPC Gas System In progress: System for drift gas Ne/CO 2 (90/10) Construction nearly finished, commissioning till Dec03 Connection to pre-installation site SXL2 (existing lines) Not yet started: CO 2 for insulation volumes: still to be done very simple in case of water cooled resistor rod Concerns: none

ALICE TPC Status, Meeting with LHCC referees TPC PASA Final submission 27 May03 engineering sample 500 chips Sep03 rest of production (40,000 chips) Jan04, testing Feb-Jul04 * typical 12 pF, slope 16.5 e/pF *

ALICE TPC Status, Meeting with LHCC referees High Occupancy events from Cosmics

ALICE TPC Status, Meeting with LHCC referees ALTRO digital tail cancellation and baseline restoration PG:

ALICE TPC Status, Meeting with LHCC referees Front-end Card final version 128 ch

ALICE TPC Status, Meeting with LHCC referees Front-end Card Status Completed: Improved features EEPROM card id Improved Front-end Bus design: multilayer-flexible instead of cable Geographical address Assembly of prototype Standalone tests In progress: Adaptation of cooling plates Characterization with ROC Test equipment Production of 4500 FEC Nov03-Aug04, test Apr04-Nov04 Concerns: tight schedule

ALICE TPC Status, Meeting with LHCC referees Readout Control Unit (RCU) Completed: Production of prototype RCU-2 (small series for test setups) PCI-card, problems to get them to work reliably Final design (standalone RCU): motherboard layout done In progress: Solve RCU-2 problem (fall-back RCU-1, decision Jul03) Final design (standalone): DCS/Trigger cards (common for TPC/TRD) under test FPGA firmware till end Aug03 System tests from Sep03 Not started yet: Production (216 cards + spares) Apr04 - Jul04 Testing Aug04 - Mar05 Concerns: tight schedule

ALICE TPC Status, Meeting with LHCC referees Schedule Overview