Subcommittee on Hydrology/ACWI New Extreme Storm Work Group Status and Plans.

Slides:



Advertisements
Similar presentations
WECC/TEPPC Response to DOE Funding Opportunity Status Update June 29, 2009 Bradley Nickell Renewable Integration and Planning Director.
Advertisements

ENEF WG Risks / Bernard Fourest 12 September 2012 PRAGUEBRATISLAVA ENEF WG RISKS Current activities of the SWG Nuclear Installation Safety Bernard Fourest.
Status Update on Future Water Quality Strategies for the Refuge Kenneth G. Ammon, P.E., Deputy Executive Director, Everglades Restoration and Capital Projects.
Streamgaging Task Force Final Report Advisory Committee on Water Information Herndon, Virginia April 3, 2002.
US Army Corps of Engineers Northwestern Division Northwestern Division 1 System Flood Control Review: Regional Agency Review Briefing Lonnie Mettler Northwestern.
Overview of FEMA Actions and Accomplishments Doug Bellomo July 13, 2009 National Flood Risk Management Summit.
1 High Production Volume (HPV) Challenge Program – Future Directions Jim Willis Director, Chemical Control Division, Office of Pollution Prevention and.
US Army Corps of Engineers BUILDING STRONG ® FOLSOM DAM MODIFICATIONS APPROACH CHANNEL EIS/EIR Major Robert Dion and Cameron Sessions Project Managers.
Subcommittee on Hydrology ( SOH) 2007 Report February 21, 2008 Steve Blanchard USGS.
FASAB Update CIGIE/GAO Financial Statement Audit Conference Wendy Payne Executive Director March 30, 2011.
Risk and Emergency Management Division Southside Hampton Roads Hazard Mitigation Plan.
US Army Corps of Engineers BUILDING STRONG ® Missouri River Flood Task Force (MRFTF) Concept Briefing
Flood Risk Management Program Rolf Olsen Institute for Water Resources U.S. Army Corps of Engineers.
History and Evolution of the PMP/PMF
Status of the U.S. Nuclear Regulatory Commission’s Initiatives on the Use of Cesium-137 Chloride Sources March 10, 2009 Regulatory Information Conference.
Briefing to the Central Valley Flood Protection Board on Status of the FCSA July 12, 2013 Central Valley Integrated Flood Management Study.
SUBCOMMITTEE ON HYDROLOGY Overall Goal – from purpose statement: “To improve the availability and reliability of (surface water) information needed for.
An update from the National Committee on Levee Safety Presented to the TWCA by Karin M. Jacoby, PE, Esq. June 17, of 14An Involved Public and Reliable.
Presentation to Contra Costa County Climate Leaders October 3, 2013.
Dam Hazard Consequences Assessment
1 International/OECD Nanotechnology Activities EPA/DoD Meeting on Nanotechnology March 9, 2007 Jim Willis, EPA/OPPT.
DRR workshop WMO Commission for Hydrology Geneva June 2013 Ann Calver 1.
Bay Area Integrated Regional Water Management Plan North Bay Watershed Association Meeting November 3, 2006 Working together to enhance sustainable water.
Relevant, Ready, Responsive, Reliable 1 Addressing the Flood Risk Challenge.
WMO Blue Peace - Water Security in the Middle East: Strategic Management of Hydrological and Meteorological Data and Information Product Generation Al-Hamndou.
Homeland Security Grant Program 2015 Process Michelle Hanneken Illinois Emergency Management Agency.
Developing a National Levee Safety Program Mike Stankiewicz - NCLS Arizona Floodplain Management Association November 3, Update on the National.
Mitigation Plan for Four New Jersey Counties Municipal Mitigation Measures prepared for: Camden, Cumberland, Gloucester, and Salem Counties prepared by:
Industry & Research: Issues, needs and conclusions from the US IMPACT Investigation of Extreme Flood Processes & Uncertainty Workshop at HR Wallingford,
Office of the Federal Coordinator for Meteorology OFCM Crosscut Assessment of Hydrometerological Products, Services, and Supporting Research Robert J.
SUBCOMMITTEE ON HYDROLOGY Overall Goal – from purpose statement: “To improve the availability and reliability of surface water quantity information needed.
Local Government Reform in the Wellington Region Council Workshop - 18 April )Invitation from Greater Wellington Regional Council 2)Preparation for.
Reclamation Climate Variabilaity Activities March 28, 2014 Tucson, AZ.
4733 Bethesda Ave, Suite 600 Bethesda, MD (P) Developing Criteria for Project Programming.
Ninth Annual Meeting of the WG: Objectives and Agenda Jennifer H. Madans U.S.A.
- DCWAC - Where we’ve come from, Where we are, Where we’re headed.
Workshop on the Strategy and Action Plan of the WMO Flood Forecasting Initiative WMO Headquarters Geneva, 08 – 10 December 2009 INTRODUCTION TO THE WORKSHOP.
1 Current Issues in Siting Safety Reviews Michelle Hart, Sr. Reactor Engineer Division of Site and Environmental Reviews NRC Regulatory Information Conference.
SUBCOMMITTEE ON HYDROLOGY Overall Goal – from purpose statement: “To improve the availability and reliability of (surface water) information needed for.
St. Louis – February 25-28, 2008 Extremely Successful -Close to 500 Participants  Jointly Sponsored by ASFPM & NASMA – Supported by Corps and FEMA High.
Millbrook Dam Environmental Assessment Study Dan Marinigh CAO/Secretary-Treasurer Otonabee Region Conservation Authority October 20, 2015 Otonabee Conservation.
Streamgaging Task Force Summary Report Advisory Committee on Water Information Herndon, Virginia September 10, 2003.
Mississippi River Recovery Task Force Bob Hainly Task Force Member 2012 USACE Flood Risk Management Representing: and Silver Jackets Workshop USGS Water.
Martin Rule Curve Study Ashley McVicar, APC Maurice James, Water Resources Consulting LLC.
Monmouth County Multi-Jurisdictional Hazard Mitigation Plan Update.
International Workshop on Flash Flood Forecasting – Costa Rica March 2006 WORLD METEOROLOGICAL ORGANIZATION Weather, Climate and Water INTERNATIONAL WORKSHOP.
Probable Maximum Precipitation Needs Assessment for Montana.
US Army Corps of Engineers BUILDING STRONG ® Emergency Response Policy Revision Update ( ER & EP ) Jeffrey Jensen CECW-HS USACE Flood Risk Management.
Rebuilding the System Reducing the Risk California Water Plan Plenary Session October 22-23, 2007.
Central Valley Flood Protection Board Meeting – Agenda Item No. 7D Methylmercury Open Water Workplan.
Refrigerator Decommissioning: Next Steps for Measure Update March 18th,
Mitigation & Education (MES) Subcommittee Update Chris Jonientz-Trisler, FEMA Co-Chair.
Some issues in flood hydrology in the climate context
California’s Flood Future Recommendations for Managing the State’s Flood Risk Flood Risk Management & Silver Jackets Workshop August 21, 2012.
Section 4.9 Work Group Members Kris Hafner, Chair, Board Member Rob Kondziolka, MAC Chair Maury Galbraith, WIRAB Shelley Longmuir, Governance Committee.
Watershed Monitoring *Background Watershed Stewardship Plan-2004 Gap Projects IRWMP-Dec Policies SFEI study-2007 Joint TC/WC meeting-June 2010 *Proposed.
Subcommittee on Hydrology, ACWI New Extreme Storm Work Group Status and Plans.
U.S. DEPARTMENT OF ENERGY Joint IEPR Workshop on Climate Adaptation and Resiliency for the Energy Sector Energy Sector Climate Resilience CRAIG ZAMUDA,
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
K1 Proposed National Levee Safety Program An Introduction for the Tribal Assistance Coordination Group May 12, 2011.
GMD Research FERC Order No. 830 Research Work Plan Mark Olson, NERC
Office of Nuclear Material Safety and Safeguards (NMSS)
COMMISSION FOR HYDROLOGY (CHy)
WMO Global Multi-Hazard Alert System
Incorporating Climate Change Considerations
NERC Reliability Standards Development Plan
Revolutionize USACE Civil Works
GMD Research FERC Order No. 830 Research Work Plan Mark Olson, NERC
NERC Reliability Standards Development Plan
Sacramento Environmental Commission January 2019.
Presentation transcript:

Subcommittee on Hydrology/ACWI New Extreme Storm Work Group Status and Plans

Outline of Presentation Background, Need and Recent Workshops Proposal Presented to SOH – October 2007 Task Force – January-April 2008 Draft Work Plan – April 2008

Extreme Storm Events Background Federal Agencies developed cooperative Probable Maximum Precipitation (PMP) studies beginning in 1940s National Weather Service (USWB) developed Depth-Area Duration (D-A-D) storm data analysis techniques, followed by storm transposition and maximization Cooperating agencies Corps of Engineers and Bureau of Reclamation, for design of large Federal dams Generalized PMP studies began in 1960s and used today Cooperative PMP Methods summarized in papers by Stallings et al. (1986) and Hansen (1987)

Extreme Storm Events Background National Research Council (1994) endorsed current operational PMP methods but suggested further research on radar data, storm-based probability methods and numerical modeling in mountainous regions U.S. PMP methods are basis for World Meteorology Organization (WMO) approach U.S. PMP methods are being challenged by some private consultants Private consultants conduct site-specific PMP studies with substantially reduced rainfall amounts; some studies accepted by regulatory agencies

Current Generalized PMP HMR Reports

Generalized HydroMet Report Status HMR No. Report Publication Date Latest Storm Used Sept. 3-7, June 1978June 19-23, AJune 1988Aug. 1-4, October 1994 Dec , 1980 (general) Aug. 16, 1990 (local) 59February 1999Feb , 1986 over 20 to 40 YEARS more data since generalized reports!

Example Data Gaps – HMR 55A

Recent Extreme Storm Workshops & Needs Identified National Research Council, 1988 “Estimating Probabilities of Extreme Floods” Nuclear Regulatory Commission Sponsor National Research Council, 1994 “Estimating Bounds on Extreme Precipitation Events” FERC Sponsor with Workshop Bureau of Reclamation, 1999 “A Framework for Characterizing Extreme Floods for Dam Safety” Report from 1997 Utah State Univ. Workshop, Reclamation Sponsor FEMA, 2001 “Hydrologic Research Needs for Dam Safety” Report from 2001 Workshop, Corps of Engineers and FEMA Sponsor

2001 FEMA Workshop Priorities Top Ten Priorities Meteorology

Activities to Commence Extreme Storm Events Work Group Presentation at SOH meeting on October 18, 2007 – Proposal and Terms of Reference SOH October, 2007 Decision: The SOH decided to pursue the formation of an Extreme Storm Work Group SOH, January 2008 meeting: revisited the Extreme Storm Work Group Proposal. Assigned a Task Force to the effort. Task Force commenced in February and held meetings on March 3, 2008 and April 16, 2008

Extreme Storm Events Task Force Task Force Charge: Determine the need for and level of cooperation for updating databases and developing new methods for estimating extreme storm events. Focus should be on estimating various storm properties for assessing flood hazards. Task Force is to report back to the SOH on the feasibility of establishing a standing working group to update Federal guidelines on estimating extreme storm events and to utilize the estimates within in a probabilistic, risk- based approach.

Extreme Storm Events Task Force Results Reached Consensus on: Federal Government sets the standards for Probable Maximum Precipitation National Weather Service should be lead agency in maintaining storm databases, estimating PMP and revising Hydromet. Reports Agencies have immediate, short-term needs in PMP and extreme storms Long-term commitment of funding for NWS to update the HMRs and to maintain capabilities needs to be addressed, with meeting Agencies long-term needs

Activities to Commence Extreme Storm Events Work Group Task Force Results : There is sufficient interest to proceed with a new Extreme Storm Events Work Group. A Draft Charter has been prepared. Includes Terms of Reference and a Statement of Work Consensus that it is a Federal Responsibility and NOAA/NWS is key to accomplishing the work.

Remaining Concerns Is there sufficient short-term resources and commitments to proceed with a new Extreme Storm Events Work Group? Can a long-term commitment be developed to support NOAA/NWS obtaining more staff to do the work?

Extreme Storm Events Work Group Next Steps Prior to official formation of a Work Group, the Task Force has identified some interim steps: 1.Complete draft charter and proposal using technical references and Task Force discussions. 2.Identify short-term and long-term agency needs. 3.Resolve NOAA/NWS availability to participate in PMP studies. 4.Present plan to SOH to include discussion of Dam Safety Act responsibilities.

Levees and Floodplain Management Yuba City/Marysville, CA February 1986 Mississippi River 1993

Levees and Floodplain Management Louisiana/Mississippi 2005

Design Flows for Hydraulic Structures

Spillway Evaluations and Risk Analysis for Dams

Environmental Studies Glen Canyon Flushing Flows

Folsom Dam, American River, Sacramento, CA 1997 flood