UZAIR KAMAL Mohsin Murad MAJID KHAN. Major Power Project Of The Country 92 miles downstream the confluence of Kabul and Indus Rivers 260 ft high structure.

Slides:



Advertisements
Similar presentations
Payment for Environmental Services Extracted from work by Ffemke Griffoen FAO-APO TZ.
Advertisements

INWEPF 4th Steering Meeting and Symposium (5-7 July 2007)
Cost-Benefit Analysis
MONGOLIA: Cost Benefit Analysis (CBA) Project selection Team members present at the training: Ms.Tsendsuren Batsuuri, Ministry of Environment and Green.
LECTURE XIII FORESTRY ECONOMICS AND MANAGEMENT. Introduction  If forestry is to contribute its full share to a more abundant life for the world’s increasing.
Cost Benefit Analysis of the Three Gorges Dam
The Benefits of Investing In Conservation… …and the Costs of Not Investing Developed by Daniel Mountjoy USDA - Natural Resources Conservation Service Laura.
Environmental of Impacts
PRESENTATION ON MANGLA DAM MADE BY: SYED ALI ZULQADAR. ROLL NO: 37.MAJOR: SES 5 th.
L-THIA Long-Term Hydrologic Impact Assessment Model ….provides relative estimates of change of runoff and non point source pollutants caused due to land.
Ghana’s Initial National Communication William K. Agyemang-Bonsu EPA.
By: Alizar Rizvi Fatima Raza VIII-A. Mangla Dam is located on the Jhelum river. Kashmir, Pakistan. It is the 16th largest dam in the world. It was built.
Economics of Riparian Restoration on Western Washington Farms June 29, 2004 American Water Resource Association Olympic Valley, CA Carolyn J. Henri, PhD.
Bureau of Reclamation Overview Christopher Cutler Deputy Chief Boulder Canyon Operations Office.
Three Gorges Project: A Project of the Century By: Xinyu Huang.
NRCS Watershed Rehabilitation
1 Sustainable Agricultural Economic benefits of reservoir scale expansion in Balkh Basin, Afghanistan Abdelaziz A. Gohar & Frank A. Ward New Mexico State.
WLI REGIONAL KNOWLEDGE EXCHANGE WORKSHOP ON DECISION-SUPPORT TOOLS AND MODELS SEPTEMBER, 2013, JERBA, TUNISIA Economic analysis of improved water.
Introduction to Cost-Benefit Analysis: Using Market Prices
Eftec Economics for the Environment Consultancy Using ecosystem services for cost benefit analysis of forestry decisions Roundtable on Cost / Benefit of.
Future of the Columbia River Treaty A British Columbia Perspective 2014 PNWA Summer Conference Coeur d’Alene June 23, 2014 Kathy Eichenberger B.C. Ministry.
Townley Chapter 7 Problems in Project Evaluation.
Three Gorges Dam David Homsher & George Lyons Yangtze River Over 3,900 miles long (6,300 km). Third longest in the world. The land area of Yangtze river.
The Economics of Climate Change Adaptation
Project preparation and appraisal. Preparation of project report and appraisal are intimately tied up.
TA Project: “Improving Emissions Control” Session 2 Scenarios for Emissions Management Dr Russell C Frost Project Team Leader.
COST BENEFIT ANALYSIS- PUBLIC SECTOR INVESTMENTS Lucky Yona.
Investment in Sustainable Natural Resource Management (focus: Agriculture) increases in agricultural productivity have come in part at the expense of deterioration.
The Three Gorges Dam IB SL. Hydroelectric Power A dam is built to trap water, usually in a valley where there is an existing lake. Water is allowed to.
Three Gorges Dam The Worlds Largest Hydro-Electric Plant.
Putting Economic Value to Nature Protection Direct and Indirect Costs and Benefits by Gernot Bäurle
Ecosystem Valuation Social and Environmental Aspects Kathryn Benson CE 397 November 25, 2003.
Hydroelectric power Group 3. Leader - Jerald Kiew 12 Members Chu Yuan 3 Leom Sheng Teng 13 Gregory Loh 15 Wong Choon Pin 24 The Team.
Srinakarin Dam ครูจันทนา คำอนุกูล. The Srinakarin Dam is one of the important dams in Kanchanaburi, which is situated in Srisawat District. The atmosphere.
ELLEN BRENNA AND ANDREW ORTHOBER 9/30/11 The Effects of Hydropower on Rural Communities.
Chapter 33 Dam Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Give reasons why.
TOPIC 3.2 ENSURING ADEQUATED WATER RESOURCES AND STORAGE INFRASTRUCTURE TO MEET AGRICULTURAL, ENERGY AND URBAN NEEDS.
China & 3 Gorges Dam. Satellite View of Three Gorges Dam at Yangtze River using Google Earth Data View of the largest hydroelectric dam in the world.Three.
LINING IMPACT ON WATER LOSSES IN WATERCOURSES Dr. M. Arshad Dr. Q. Zaman Dr. A. Madani.
Compiled by E.I. See Montgomery County Public Schools, Maryland Curriculum 2.0 – Grade
Biggest hydroelectric power plants in world
Sustainable Development and Environmental Awareness1.
BUILDING STRONG SM Northwestern Division Presented by Lori Rux Chief, Program Support Division June 11, 2009 BPA Direct Funding for Corps Hydropower Projects.
El Gallo Hydroelectricity Project PDD Analysis
Cost of Inaction June Reyes and Erika Kociolek. Inaction “All too infrequently, inaction is motivated by the perceived high cost of reducing greenhouse.
AGEC 608 Lecture 01, p. 1 AGEC 608: Lecture 1 Objective: Introduction to main concepts Readings: –Boardman, Chapter 1 –Kankakee, summary of Draft Assessment.
Environmental Management Module V
Columbia River Treaty Past, Present and Future Status of Columbia River Treaty Discussions: a BC government perspective October 7, 2015 Osoyoos, BC Kathy.
The Three Gorges Dam Project. Three Gorges Dam The largest dam in the world. Over a mile and a half long and 600 feet high. Has displaced over 1.5 million.
Cost benefit analysis (COBA) is a technique for assessing the monetary social costs and benefits of a capital investment project over a given time period.
Water Resources Planning and Management Daene C. McKinney Economic Analysis of Alternative Water Plans: 1. Benefit/Cost Analysis.
Social – The effects on people/ society/ communities Economic – Concerns; money/ industry/ jobs/ investment/ local and national economy Environmental –
ICAP SAFA Conference 2016 South Asia: Corridor of Opportunities Lahore, January 30, 2016 Mirza Hamid Hasan.
Hydroelectric Potential in Developing Countries By: Sean Morrison University of Wisconsin Eau Claire Department of Geography and Anthropology.
Economic Valuation of Environment: Overview
Network for Certification and Conservation of Forests.
Reclamation and Hoover Dam It’s All About The Water.
1 Bonneville Power Administration. 2 BPA markets power from 31 federally owned dams, one non-federal nuclear plant, and wind energy generation facilities.
KALABAGH DAM PROJECT General Reservations of Provinces on KBD Feasibility PROJECT BY RABIA RASHEED SHEHRBANO AKBAR ZIL-E-HUMA AKBAR.
Tourism Industry at Risk: The Economic Impact of Climate Change
RUPES Workshop, Cagayan de Oro , September 2012
A Quick Intro to Non-Market Valuation
How the environment supports the aims of the LEP
Environmental and Natural Resource Economics 3rd ed. Jonathan M
Cost Benefit Analysis of the Three Gorges Dam
Other renewable energy sources
Learning Unit 8: Big dams
Presented By Samuel Muriithi HEAD OF ECONOMICS AND PLANNING:
The River Nile 5/24/2019.
What is happening here? Deforestation in Borneo.
Presentation transcript:

UZAIR KAMAL Mohsin Murad MAJID KHAN

Major Power Project Of The Country 92 miles downstream the confluence of Kabul and Indus Rivers 260 ft high structure and would create a reservoir 6.1 million acres feet (MAF) of usable storage About 11,200 GWh, generated by hydro power plant of 2400 MW capacity Estimated Cost Is Around US $5.153 billion

A cost-benefit analysis (CBA) is an economic evaluation technique. It can be used to appraise whether a dam project is worth undertaking Define a referent group. Select a portfolio of alternative projects. Identify potential (physical) impacts of the project. Predict quantitative impacts over the life of the project. Monetize all impacts. Discount for time to find present values. Sum: Add up benefits and costs. Perform sensitivity analysis. Recommend the alternative with the largest net social welfare value.

Group of individuals whose welfare will be accounted for when assessing the cost and benefit of a project. Not always the people affected by the project. But in Pakistan these projects are undertaken from a national perspective considering the people of all the provinces. Hence the referent group will be the entire population.

Potential Impacts of a Dam Project Impacts Negative ImpactsPositive Impacts Physical costs Resettlement cost Risk of dam failure Land acquisition Externalities Hydroelectric power Irrigation water Reduction of flood losses and seawater intrusion damage Municipal and industrial water supply Net benefits to/from fishery & recreational facilities River navigation Physical impacts are composed of construction, operation and maintenance, mitigation and decommissioning costs.

Negative ImpactsMeasurement Physical costs (Construction, O&M, Mitigation and Decommissioning Costs) Units of employed inputs Resettlement costPhysical property (e.g. # of houses) Risk of dam failurePhysical property (e.g. # of houses) Land acquisition - Deforestation Area unit (e.g. Rai, hectare, acre) - Depends on project site Externalities - Greenhouse gas - Social and cultural loss - Waterlogging and salinity - Volume of greenhouse gas emission - Depends on project site - Decrease in farm productivity Positive ImpactsMeasurement Flood and seawater intrusion controlLevel of flood, days of flood Irrigated waterCubic metre of water (Expansion of irrigation area and multiple crop cultivation) ElectricityKWH/year Net fishery and recreationDay visit - day loss / tonnes of fish Water supplyCubic metre of water River navigationTransportation time saved Once all impacts have been identified, analysts have to quantify them into physical terms. Useful economic life of over 50 years, without requiring any major replacement of machines and E&M equipment

Physical ImpactsAppropriate Valuation Method COSTS 1.Construction, O&M, mitigation, decommissioning Capital goods Materials Labour Market price 2.Resettlement 2.1CompensationProperty lossesMarket price, Revealed preferences (RCM), and stated preferences (CVM) 2.2Assistant expensesCapital goods Materials Labour Market price 3.Risk of dam failurePropertyMarket price, Revealed preferences (RCM) 4.Land acquisitionForest landMarket price Commercial agriculture timber, non- timber forest products and wildlife Market price, Revealed preferences, Stated preferences Non-commercial timber, non timber forest products and wildlife Revealed preferences (RCM), Stated preferences (CVM) Ecosystem and biodiversity losses, species extinctionStated preferences (CVM) 5.ExternalitiesSocial losses (loss in historic site, erosion of cultural identity, community fragmentation) Stated preferences (CVM) Waterlogging and salinity(Inclusively estimated with irrigation water benefits)

BENEFITS 1.Flood and seawater intrusion controlIncremental productivityRevealed preferences (FIM) Market price (for WTP) 2.Water for irrigationElectricity generatedMarket price, Shadow prices, Revealed preferences (RCM) 3.Hydroelectric power Net days of visitMarket price, Revealed preferences (RCM, TCM, HPM, FIM), 4.Net fishery and recreationTime savingRevealed preferences (RCM), Stated preferences (CVM) 5.River navigationTime savingRevealed preferences (RCM), Stated preferences (CVM)

Description With Kalabagh (US $ million) P.V. construction cost of Kalabagh2,234 P.V. construction cost of project0 P.V. construction cost of thermal plant0 P.V. incremental thermal operating cost0 Total P.V. Cost:2,234

Average Annual Power Benefits Rs Billion Average Annual Irrigation BenefitsRs Billion Average Annual Flood Alleviation BenefitsRs Billion Additional Power From TarbelaRs Billion AVERAGE YEARLY BENEFITSRs Billion The total project cost at June 1998 price level, including contingencies, price escalation and interest during construction, is estimated as US$ 5,700 million. The project will pay back its investment cost in a period of less than 10 years, as projected project annual benefits are US $ Million

The alternatives to Kalabagh Dam are: Raising water level in Mangla dam to offset the effect of silting. A de-silted Tarbela would yield the same irrigation benefits as Kalabagh, but at one- seventh the cost in net present value terms A thermal power plant of equivalent capacity to Kalabagh were constructed, the cost would still be lower by one-third Description With Kalabagh (US $ million) Tarbela Action Plan (US $ million) P.V. construction cost of Kalabagh2,2340 P.V. construction cost of project0343 P.V. construction cost of thermal plant0918 P.V. incremental thermal operating cost020 Total P.V. Cost:2,2341,461