Sixth Northwest Conservation & Electric Power Plan Proposed Heavy-duty Combustion Turbine Planning Assumptions Jeff King Northwest Power and Conservation.

Slides:



Advertisements
Similar presentations
Spinning Reserve from Load Consideration of a Trial at Xcel Energys Cabin Creek Station Presentation to CMOPS January 7, 2005 John Kueck ORNL Brendan Kirby.
Advertisements

What’s the only thing that moves slower than the a glacier? An IOU Power Generation Technologies.
Duke Energy Carolinas Dan River Combined Cycle Project 8/17/10 For Vogt Power, my best estimate is 214 shipments (rail, truck, LTL, and small parcel- UPS.
CVP Cost Allocation Public Workshop – January 18, 2013 “PLEXOS Methodology and Assumptions”
Ad Hoc West-wide Resource Assessment Team (WRAT) : Assessment of Western System Adequacy in the Short-term Jeff King Northwest Power Planning Council Presentation.
Toward a Sustainable Future Name of Conference, Event, or Audience Date Presenter’s Name | ©2011 Synapse Energy Economics Inc. All.
Sixth Northwest Conservation & Electric Power Plan Actual vs. Modeled Operation of Combined-Cycle Combustion Turbines in the Pacific Northwest Maury Galbraith.
COMBINED HEAT & POWER J.R. Simplot Mountain Home, Idaho.
ANCILLARY SERVICES THE NEXT STEP IN MARKET GRANULARISATION.
Electricity Supply in Alaska Frank Abegg, PE Fairbanks, Alaska April 2006 Frank Abegg, PE Fairbanks, Alaska April 2006.
Economic Analyses of FPL’s New Nuclear Projects: An Overview Dr. Steven Sim Senior Manager, Resource Assessment & Planning Florida Power & Light Company.
1 The Effects of Integrating Wind Power on Transmission System Planning, Reliability, and Operations Phase 1 Preliminary Overall Reliability Assessment.
Sixth Northwest Conservation & Electric Power Plan Discussion of Proposed Generating Resource Action Items Jeff King Northwest Power and Conservation Council.
Overview of Distributed Generation Technologies June 16, 2003 Harrisburg, PA Joel Bluestein Energy and Environmental Analysis, Inc.
Long Term Study Task Force Update to ETWG ERCOT Long-Term Study: Scenarios, New Software, and Emerging Technology Assumptions January 27, 2012.
Study Results Drought Scenario Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the impact in the interconection.
Cogeneration at UC July 18, Welcome 3 Transformation of the Power Plant POWER PLANT CENTER OF CAMPUS CENTRAL UTILITY PLANT 2007.
Sixth Northwest Conservation & Electric Power Plan Proposed Aeroderivative Combustion Turbine Planning Assumptions Jeff King Northwest Power and Conservation.
COMBINED HEAT & POWER J.R. Simplot Mountain Home, Idaho.
1 Atmospheric Vortex Engine Development and Economic.
March 19, 2009 Sixth Northwest Conservation & Electric Power Plan Central-station Solar Photovoltaic Resource Assessment Jeff King Northwest Power and.
Sixth Northwest Conservation & Electric Power Plan Adding Incremental Flexibility to the Pacific Northwest Power System? Maury Galbraith Northwest Power.
Lansing Board of Water & Light REO Town Headquarters & Cogeneration Plant REO Town Cogeneration: Concept to Commercial Operation.
Freeport Generating Project Project Description Modernization projects at Power Plant #2 Developers – Freeport Electric and Selected Development Company.
February 10, 2008 Sixth Northwest Conservation & Electric Power Plan Woody Biomass Resource Assessment Jeff King Northwest Power and Conservation Council.
Avoided Costs of Generation
ETAAC Energy Sector Energy Storage Smart Grid July 12, 2007 San Francisco, CA.
Northwest Power and Conservation Council Slide 1 Direct Use of Natural Gas Economic Fuel Choices from the Regional Power System and Consumer’s Perspective.
Sixth Northwest Conservation & Electric Power Plan Proposed Combined-cycle Power Plant Capital Cost Assumptions Jeff King Northwest Power and Conservation.
Wholesale Power Price Forecast 01/28/03 Current Trends Update March 11, 2003.
Discussion of Resource Plans Michael Schilmoeller for the Northwest Power and Conservation Council Wednesday, June 10, 2009.
Sixth Northwest Electric Power and Conservation Plan Generating Resource Assessments Jeff King Northwest Power and Conservation Council Portland, OR July.
Economics CAFI II Stage Gate Review Denver, CO May 1, 2007 Tim Eggeman* - Neoterics International Richard Elander - National Renewable Energy Laboratory.
Preliminary Results with the Regional Portfolio Model Michael Schilmoeller for the Northwest Power and Conservation Council Generation Resource Advisory.
Sixth Northwest Conservation & Electric Power Plan Adding Incremental Flexibility to the Pacific Northwest Power System? Maury Galbraith Northwest Power.
OVERVIEW OF ISSUES DR AND AMI HELP SOLVE Dr. Eric Woychik Executive Consultant, Strategy Integration, LLC APSC Workshop on DR and AMI.
Sixth Northwest Conservation & Electric Power Plan Resource Development Parameters Jeff King Northwest Power and Conservation Council Generating Resources.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Northwest Power and Conservation Council Generating.
GHG BACT Analysis Case Study Russell City Energy Center May 2010 Donald Neal Vice President, EHS.
Transmission Equivalence Richard V. Kowalski Manager, Transmission Planning ISO New England.
Wholesale Power Price Forecast 01/28/03 Current Trends Update Jeff King January 31, 2003.
December 9, 2008 Sixth Northwest Conservation & Electric Power Plan Integrated Coal-fired Gasification Plant Resource Assessment Jeff King Northwest Power.
Sixth Northwest Conservation & Electric Power Plan Proposed Wind Plant Capital Cost Assumption Jeff King Northwest Power and Conservation Council Portland,
Wholesale Electricity Price Forecast Draft Current Trends Forecast Jeff King Conservation Resource Advisory Committee September 30, 2002.
Sixth Northwest Conservation & Electric Power Plan Geothermal Power Generation Resource Assessment Jeff King Northwest Power and Conservation Council Power.
Northwest Power Planning Council, January 2001 Electricity Price Forecast Sensitivity Analysis Jeff King Regional Technical Forum January 9, 2001.
Northwest Power and Conservation Council A Look At The Council’s Conservation Planning Methodology and Assumptions A Look At The Council’s Conservation.
July 17, GRAC 7/17/08 - Wrap-up I 1)Are the reference plant assumptions reasonable? More or less specificity? Important variations? 2)Should other.
Energy Management and Planning MSJ0210 Energy generation 2 Eduard Latõšov.
Southern California Edison The San Onofre Nuclear Generating Station April 14, 2011.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Northwest Wind Integration Action Plan Jeff King Northwest Power & Conservation Council June 27, 2007.
PNW RoofTop Unit Working Group - RTUG – RTU Savings Research Project Phase 3 December 15, 2009.
DWG – Dependable Capacity Kevin Harris, ColumbiaGrid TEPPC\Hydro Modeling Task Force - Chair.
Sixth Northwest Conservation & Electric Power Plan Interim Wholesale Electricity Price and Carbon Dioxide Production Forecasts Maury Galbraith Northwest.
The Iowa Stored Energy Plant A Project Review and Update May 2005 Bob Haug, Executive Director Iowa Association of Municipal Utilities.
MWG Meeting March 7, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
1 11. PROFITABILITY EVALUATION OF NEW POWER PLANT ALTERNATIVES Asko Vuorinen.
Optimization of IGCC power plant Samantha Chase David Granum Ming Chen Tang Irena Vankova Sung Yoon Five Gasifiers.
Reliability-Must-Run (RMR) Cost Evaluation and Settlement Basis Ino González ERCOT RMR Workshop May 24, 2016.
1 10. BUSINESS STRATEGIES IN ANCILLARY SERVICE MARKETS Asko Vuorinen.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Generating Resource Advisory Committee Meeting.
Northwest Power and Conservation Council Slide 1 Direct Use of Natural Gas Economic Fuel Choices from the Regional Power System and Consumer’s Perspective.
04/16/ Planning New Generation APPA Operations & Engineering Conference April 10, 2006 Jay Hudson, PE Manager, Environmental Management.
Lincoln Energy Center Overview
Northwest Power and Conservation Council
Status of Northwest Gas-fired Power Plants
Brownsville Overview Management Presentation December 2000
Jeff King Northwest Power & Conservation Council July 28, 2010
Marginal Cost Pricing: Why Is It Important? Have We Achieved It?
Presentation transcript:

Sixth Northwest Conservation & Electric Power Plan Proposed Heavy-duty Combustion Turbine Planning Assumptions Jeff King Northwest Power and Conservation Council Portland, OR July 17, 2008

2 Reference plant Twin 85 MW (nominal) natural gas-fired gas turbine generators and ancillary equipment, control building and switchyard. Inlet air evaporative cooling. Low-NOx combustors and water injection for NOx control. Characteristics generally based on GE Frame 7EA.

July 17, Heavy-duty GT applications:  Energy generation  Cogeneration (requires heat recovery & integration equipment)  Regulating reserve (requires AGC)  Load-following (requires AGC)  Spinning reserve (requires AGC)  Non-spinning reserve  Replacement reserve  Voltage control (VAR support) (requires clutch)  Black start (requires auxilliary diesel generator)  Local emergency service Status: Commercially mature

July 17, H. D. GT operating characteristics I 5 th PlanProposed Base rating (net ISO MW, lifecycle average) 2 80 MW/unit 2 82 MW/unit ISO rating less 2% plant losses, less 2% degradation Rating at reference PNW locations PNW Westside (200’) PNW Eastside (700’) S. ID (3000’) E. MT (5500’) Minimum load (% rated power)25%Same Ramp rate (%/hr)>100%SameCold start to min. load < min Minimum run time (hr)1 hour< 1 hr Minimum down time (hr)1 hour< 1 hr

July 17, H. D. GT operating characteristics II 5 th PlanProposed Scheduled outage factor7% (26 day/yr average) ReviewAssume hours-dependent or starts-dependent maintenance in PNW? Need H.D. GT maintenance schedule to review. Equivalent forced outage rate7%??NERA is 3.7%. Review GADS Mean time between failures--???New parameter for PRM; will review GADS Mean time to repair51 hrSameGADS value ca: Will review GADS Heat rate (HHV, full load, lifecycle ave) 10,500 Btu/kWh11,800 Btu/kWhGTW nominal + 2.1% ave. lifecycle degradation. Vintage heat rate improvement- 0.5%/yr averageSame5% learning rate Service life30 yearsSame

July 17, H. D. GT Costs (2006 dollar values) 5 th PlanProposed Overnight construction cost$700/kW$430/kWSee following slides Vintage capital cost escalation-0.5%/yrDiscussion to follow Non-fuel Fixed O&M$7.00/kW/yrDiscussion to follow Exclusive of property taxes & insurance Non-fuel Variable O&M$4.60/MWhDiscussion to follow Startup Cost--Fuel for 20 min operation at min load Gas Turbine Handbook Shutdown Cost--Fuel for 30 min operation at min load Gas Turbine Handbook Transmission CostNoneSameAssumed to be located at load center Transmission LossesNoneSameAssumed to be located at load center

July 17, Heavy-duty GT construction cost analysis NPCC database contains reported construction cost for 7 WECC plants comprising 8 units, Normalized capital cost using MICROFIN Assume cost is vintaged as of beginning of construction (YOL - 1) 2006 dollar values "Overnight" construction + development cost Nominal ISO capacity Unit-weighted (we need an average cost value for a potential mix of plant configurations)

July 17, Normalized heavy-duty GT cost Proposed 2008 cost: $430/kW "Overnight", 2006$, 2009 service

July 17, Schedule, Cash Flows & Option phases Portfolio Risk model development phases > Development“Optional” Construction “Committed Construction” MilestonesFeasibility study through completion of permitting Notice to proceed to major equipment foundations complete Accept major equipment to commercial operation Time to complete18 mo12 mo(3) 6 mo Cash expended2 %93 %5 % Cost to suspend ($/kW)Negligible-- Cost to hold ($/kW/yr)$ 1.16 ($95,000/yr)-- Maximum hold time60 mo -- Cost of termination following suspension ($/kW) Negligible-- Cost of immediate termination ($/kW) Negligible--

July 17, Environmental 5 th PlanProposed Particulates--Values from recent permit? NPCC does not use & few if any requests SO2 -- ''NPCC does not use & few if any requests NOx -- ''NPCC does not use & few if any requests CO--''NPCC does not use & few if any requests Hydrocarbons/VOC--''NPCC does not use & few if any requests CO2 – Embedded--??? CO2 – Direct operation614 T/GWh690 T/GWhRevised heat rate CO2 – Indirect operation--???