M. OnoNSTX 5yr plan 1 M. Ono For the NSTX National Team DOE Review of NSTX Five-Year Research Program Proposal June 30 – July 2, 2003 NSTX Scope, Costs,

Slides:



Advertisements
Similar presentations
Berkery – Kinetic Stabilization NSTX Jack Berkery Kinetic Effects on RWM Stabilization in NSTX: Initial Results Supported by Columbia U Comp-X General.
Advertisements

E D Fredrickson a, J Menard a, D. Stutman b, K. Tritz b a Princeton Plasma Physics Laboratory, NJ b Johns Hopkins University, MD 46 th Annual Meeting of.
NSTX-U T&T TSG Contributions to FY15 JRT NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U.
C. Kessel Princeton Plasma Physics Laboratory For the NSTX National Team DOE Review of NSTX Five-Year Research Program Proposal June 30 – July 2, 2003.
Development and characterization of intermediate- δ discharge with lithium coatings XP-919 Josh Kallman Final XP Review June 5, 2009 NSTX Supported by.
NSTX Status and Plans College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics New York.
NSTX XP830 review – J.W. Berkery J.W. Berkery, S.A. Sabbagh, H. Reimerdes Supported by Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL.
NSTX SAS – APS DPP ‘05 Supported by Office of Science S.A. Sabbagh 1, A.C. Sontag 1, W. Zhu 1, M.G. Bell 2, R. E. Bell 2, J. Bialek 1, D.A. Gates 2, A.
J. Manickam, C. Kessel and J. Menard Princeton Plasma Physics Laboratory Special thanks to R. Maingi, ORNL and S. Sabbagh, Columbia U. 45 th Annual Meeting.
NSTX Team Meeting May 28, 2008 Supported by Office of Science College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL.
J.R. Wilson, R.E. Bell, S. Bernabei, T. Biewer, J. C. Hosea, B. LeBlanc, M. Ono, C. K. Phillips Princeton Plasma Physics Laboratory P. Ryan, D.W Swain.
ISTP (and other…) Update Stefan Gerhardt NSTX-U Monday Physics Meeting Feb. 20, 2015 B318 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima.
EP-TSG session Meeting agenda et al. M. Podestà NSTX-U Research Forum 2015 EP-TSG session PPPL, Room B252 02/24/2015 NSTX-U Supported by Culham Sci Ctr.
1 Update on Run Schedule R. Raman NSTX Team Meeting PPPL, Princeton, NJ, 08 February, 2006 Work supported by DOE contract numbers DE-FG02-99ER54519 AM08,
RF Operations: Commissioning the RF systems and antenna conditioning J. Hosea et al. NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima.
Supported by Office of Science Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U NIFS Niigata U U.
NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U NIFS Niigata U U Tokyo JAEA Hebrew.
Radiative divertor with impurity seeding in NSTX V. A. Soukhanovskii (LLNL) Acknowledgements: NSTX Team NSTX Results Review Princeton, NJ Wednesday, 1.
NSTX Effects of NTSX Upgrades on DiagnosticsFebruary 8, NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL Johns.
Prototype Multi-Energy Soft X-ray Diagnostic for EAST Kevin Tritz Johns Hopkins University NSTX-U Monday Physics Meeting PPPL, Princeton, NJ June 25 th,
Supported by NSTX Team Meeting June17, 2004 Columbia U Comp-X GA INEL JHU LANL LLNL Lodestar MIT Nova Photonics NYU ORNL PPPL PSI SNL UC Davis UC Irvine.
Beam Ion Profiles with the SSNPA Diagnostic Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics NYU ORNL PPPL.
NSTX-U Program Update J. Menard NSTX-U Team Meeting B318 May 7, 2013 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto.
Supported by Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics NYU ORNL PPPL PSI SNL UC Davis UC Irvine UCLA.
Second Switching Power Amplifier (SPA) Upgrade Physics Considerations Discussion S.A. Sabbagh 1, and the NSTX Research Team 1 Department of Applied Physics,
Summary of the SFPS XPs R. Raman, D. Mueller University of Washington Princeton Plasma Physics Laboratory and the NSTX Research Team FY09 NSTX Results.
Wave Heating and Current Drive TSG: XMP for Recomissioning the HHFW System R.J. Perkins, J. C. Hosea Theory & Modeling: N. Bertelli NSTX-U Supported by.
XP817: Transient CHI – Solenoid free Plasma Startup and Coupling to Induction Office of Science R. Raman, B.A. Nelson, D. Mueller, T.R. Jarboe, M.G. Bell.
1 R Raman, B.A. Nelson, D. Mueller 1, T.R. Jarboe, M.G. Bell 1, J. Menard 1, R. Maqueda 2 et al. University of Washington, Seattle 1 Princeton Plasma Physics.
Xp705: Multimode ion transport: TAE avalanches E D Fredrickson, N A Crocker, N N Gorelenkov, W W Heidbrink, S Kubota, F M Levinton, H Yuh, R E Bell NSTX.
NSTX WZ – XP524 - NSTX Results Review ‘05 Supported by Office of Science Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT.
NSTX XP818: ELM mitigation w/midplane coils - SAS S. A. Sabbagh, J-K. Park, T. Evans, S. Gerhardt, R. Maingi, J.E. Menard, many others… (joint ELM mitigation.
1 Roger Raman for the NSTX Research Team University of Washington, Seattle NSTX Run Usage 27 February – 5 May, 2006 NSTX Mid-Run Assessment PPPL, Princeton,
NSTX Team Meeting February 7, 2007 Supported by Office of Science College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U.
Development and characterization of intermediate- δ discharge with lithium coatings XP-919 Josh Kallman XP Review - ASC Feb 2, 2009 NSTX Supported by College.
Supported by Office of Science NSTX S.M. Kaye, PPPL For the NSTX Research Team ITPA T&C Mtg. Naka, Japan 31 March – 2 April 2009 The Effect of Rotation.
Solenoid Free Plasma Startup Progress and Plans R. Raman, D. Mueller S.C. Jardin (Theory) for the NSTX Research Team NSTX PAC-29 PPPL B318 January 26-28,
1 Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics NYU ORNL PPPL PSI SNL UC Davis UC Irvine UCLA UCSD U Maryland.
NSTX S. A. Sabbagh 1, J. Bialek 1, A. Sontag 1, W. Zhu 1, B. LeBlanc 2, R. E. Bell 2, A. H. Glasser 3, L. L. Lao 4, J.E. Menard 2, M. Bell 2, T. Biewer.
Overview of Results from the FY10 National Spherical Torus Experiment Run Eric Fredrickson For the NSTX Team NSTX Supported by College W&M Colorado Sch.
NSTX Team Meeting December 21, 2009 College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics.
NSTX XP1031: MHD/ELM stability vs. thermoelectric J, edge J, and collisionality -NSTX Physics Mtg. 6/28/10 - S.A. Sabbagh, et al. S.A. Sabbagh 1, T.E.
Enhancement of edge stability with lithium wall coatings in NSTX Rajesh Maingi, Oak Ridge National Lab R.E. Bell, B.P. LeBlanc, R. Kaita, H.W. Kugel, J.
Effect of 3-D fields on edge power/particle fluxes between and during ELMs (XP1026) A. Loarte, J-W. Ahn, J. M. Canik, R. Maingi, and J.-K. Park and the.
NSTX NSTX Team Meeting May 7, 2013 NSTX Team Meeting May 7, 2013 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu.
First results of fast IR camera diagnostic J-W. Ahn and R. Maingi ORNL NSTX Monday Physics Meeting LSB-318, PPPL June 22, 2009 NSTX Supported by College.
Tom Egebo PPPL Review of the NSTX TF Coil Repair Effort September 3 - 4, 2003 Cost & Schedule to Completion Supported by Columbia U Comp-X General Atomics.
NSTX NSTX TF, PF and umbrella Upgrade Internal ReviewFeb 24, NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL.
Supported by Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics NYU ORNL PPPL PSI SNL UC Davis UC Irvine UCLA.
NSTX Team Meeting June 30, 2009 College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics.
V. A. Soukhanovskii, NSTX FY2009 Mid-run assessment meeting, 17 June 2009, Princeton, NJ 1 of 9 NSTX Boundary Physics Topical Science Group Summary V.
NSTX Sabbagh/Shaing S. A. Sabbagh 1, K.C. Shaing 2, et al. XP743: Island-induced neoclassical toroidal viscosity and dependence on i Supported by Columbia.
1 Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics NYU ORNL PPPL PSI SNL UC Davis UC Irvine UCLA UCSD U Maryland.
Supported by Office of Science NSTX S.M. Kaye, PPPL ITPA PPPL 5-7 Oct Confinement and Transport in NSTX: Lithiumized vs non-Lithiumized Plasmas Culham.
SMK – IAEA ‘041 Stanley M. Kaye for the NSTX Research Team PPPL, Princeton University, U.S.A. 20 th IAEA Fusion Energy Conference Vilamoura, Portugal November.
Planning for Toroidal Lithium Divertor Target for NSTX and Supporting Experiments on CDX-U/LTX R. Kaita Boundary Physics Science Focus Group Meeting July.
Upgrades to PCS Hardware (Incomplete) KE, DAG, SPG, EK, DM, PS NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo.
NSTX 2007 MHD XP Review – J. Menard 1 Optimization of RFA detection algorithms during dynamic error field correction Presented by: J.E. Menard, PPPL Final.
NSTX Electron Bernstein Wave Research - Taylor 1 of 8 Supported by Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics.
Preliminary Results from XP1020 RFA Measurements J.W. Berkery Department of Applied Physics, Columbia University, New York, NY, USA NSTX Monday Physics.
Raman, Dec051 Solenoid-free Plasma Start-up in NSTX using Transient CHI R. Raman 1, T.R. Jarboe 1, B.A. Nelson 1, M.G. Bell 2, D.Mueller 2, R. Maqueda.
V. A. Soukhanovskii, XP1002 Review, 9 June 2010, Princeton, NJ 1 of 9 XP 1002: Core impurity density and P rad reduction using divertor condition modifications.
NSTX NSTX Team Meeting –Masa Ono August 15, 2014 NSTX-U Team Meeting August 15, 2014 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo.
Advanced Scenario Development on NSTX D. A. Gates, PPPL For the NSTX Research Team 50th APS-DPP meeting Dallas, TX November 17, 2008 College W&M Colorado.
1 Status of the 2008 ASC TSG Run plan Presented by D. A. Gates (J. Menard Deputy) At the NSTX Mid-run asessment PPPL April 16, 2008 Supported by Office.
1 Roger Raman for the NSTX Research Team University of Washington, Seattle Update on the NSTX Run Plan PPPL, Princeton, NJ, 15 May, 2006 Supported by Office.
Monitoring impact of the LLD Adam McLean, ORNL T. Gray, R. Maingi Lithium, TSG group preliminary research forum PPPL, B252 Nov. 23, 2009 NSTX Supported.
GO : Progress toward fully non-inductive operation in NSTX Jonathan Menard, PPPL For the NSTX Team 47 th Annual Meeting of the DPP Monday–Friday,
NSTX Team Meeting April 5, 2006 Supported by Office of Science College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL.
NSTX NSTX Upgrade Project – Final Design ReviewJune 22-24, NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL.
Presentation transcript:

M. OnoNSTX 5yr plan 1 M. Ono For the NSTX National Team DOE Review of NSTX Five-Year Research Program Proposal June 30 – July 2, 2003 NSTX Scope, Costs, and Schedules Supported by Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics NYU ORNL PPPL PSI SNL UC Davis UC Irvine UCLA UCSD U Maryland U New Mexico U Rochester U Washington U Wisconsin Culham Sci Ctr Hiroshima U HIST Kyushu Tokai U Niigata U Tsukuba U U Tokyo Ioffe Inst TRINITI KBSI KAIST ENEA, Frascati CEA, Cadarache IPP, Garching IPP, Jülich U Quebec

M. OnoNSTX 5yr plan 2 MAJOR FACILITY GOALS ACHIEVED ON SCHEDULE Major NSTX MilestonesPlannedAchieved Commence First Plasma 1 Apr. 1999Feb Achieve 1 MA OH Discharges 2 Sept. 2000Dec Commence CHI OperationsSept Commence HHFW OperationsSept. 2000Oct Commence NBI Operations 3 Oct. 2000Sept High  near no-wall limit (~25%) 4 Sept. 2002June NSTX Construction (~$24M) completed on budget and schedule; received NJ Governor’s safety award on the construction project. 2 The plasma current capability further increased to 1.5 MA in June NBI construction project (~ $6M) completed on schedule and on budget. 4 Followed by the achievement of  T ~ 35% in June 2002.

M. OnoNSTX 5yr plan 3 NSTX FACILITY OPERATED ~ 90% AVAILABILITY High operational availability (~90%) maintained while ramping up the facility and diagnostic capability (and sophistication.) While the TF joint failure was an unfortunate event, the newly designed TF joint should significantly improve operational reliability needed to achieve the five year plan - 21 run weeks per year. Total FY run weeks achieved 48 weeks compared with the planned 54 weeks. ISM (Integrated Safety Management) culture emphasized; N.J. Governor’s safety awards in 2001 and Cost of a spare OH solenoid budgeted in FY FY 00FY 01FY 02FY 03FY Run weeks planned Run weeks achieved15~16134 Hours of operations Average shots/week

M. OnoNSTX 5yr plan 4 Boundary & fueling HHFW/ EBW/ CHI Heating, CD demo Solenoid-free ops Optimize V-s in highest performance Heat flux scalings Particle control, no pump Advanced particle & heat flux control Transport FY MHD Passive limits with rotation Active controlOptimize stability Optimize P, J BS, J NBI Understand: turbulence/theory comparisions Characterize IPPA: attractiveness stability and high beta,  >>  E IPPA: extrapolable,   >>  skin, high performance Integration Solenoid- free  T = 30   HH = 1  N = 5: > no wall limit ∆t pulse >  E I NI > 60%, ∆t pulse ~  skin Non-solenoid startup demo Highest performance  T = 40% ∆t pulse >>  skin  with wall limit HH = 1.5 I NI ~ 100%  T = 40%, HH = 1.2, ∆t pulse >  E   N ~ 8, ~ with-wall limit, ∆t pulse >>  E I NI ~ 100%, ∆t pulse >  skin Solenoid-free ramp to hi  p NSTX Planned Facility/Diagnostic Upgrades Support the Exciting Research Program for FY

M. OnoNSTX 5yr plan 5 DiagnosticsFacility MHD –EBW radiometer, fast  T e –MSE/CIF, LIF polarimeter [Nova] Transport & Turbulence –High & low-k  -wave scattering [UCLA, UCD] –  -wave imaging reflectometer [UCD] –GPI – Planar LIF edge fluctuations [C- Mod, DIII-D, Nova, PSI, SBIR] Edge & Divertor –Divertor laser Thomson scattering Astrophysics & Diagnostic Development –X-ray imaging crystal spectrometer [LLNL, Chandra, C-mod, KSTAR, Adv. Diagnostics Program] Very High  –Ex-vessel field and mode control coils [CU] –Modification of PF1A (k=2.6,  =0.6) –Active mode control systems [CU] CD, MHD, Integrated Scenarios –EBW (1  4 MW source power) [VLT, MIT, ORNL] Startup –EBW –CHI absorber control coils –Outboard PF-only induction Particle & Edge Plasma Control –Cryopumps –Lithium pellets, coating, flowing surface module [VLT-PFC, CDX-U] Diagnostic and Facility Upgrades are Proposed to Support Research Plan

M. OnoNSTX 5yr plan 6 BUDGET ESTIMATE ASSUMPTIONS 21 weeks per year operations estimated are based on past operational experiences. The proposed 5 year budget is ~ 10 % above the FY 04 presidential level for both PPPL and collaborators; relatively flat for future years. Upgrade cost is estimated bottom-up where possible, with contingency based on experience. Avoided strong front loading of upgrades: - implementations timed to match the program plan. - consistent with personnel availability We made some tough choices.

M. OnoNSTX 5yr plan 7 FY 03 - FY 08 NSTX BUDGET OVERVIEW Presidential Budget Runweeks 12(4)

M. OnoNSTX 5yr plan 8 FY 03 - FY 08 NSTX PPPL FTE OVERVIEW The NSTX PPPL staff level is relatively flat at 110. Runweeks

M. OnoNSTX 5yr plan 9 PPPL FACILITY OPERATIONS BUDGET 21 run weeks per year Essentially inflation adjusted flat budget. Budgeted for spare OH solenoid. Anticipated savings from NCSX parallel operation in FY 08 not included. : 21 run weeks per year

M. OnoNSTX 5yr plan 10 RESEARCH BUDGET Collaborations research contributes strongly to diagnostics. EBW upgrade collaboration opportunities not included. : 21 run weeks per year

M. OnoNSTX 5yr plan 11 FACILITY UPGRADES BUDGET * In collaboration with VLT * * * * * *

M. OnoNSTX 5yr plan 12 4 MW EBW UPGRADE BUDGET In collaboration with ORNL, MIT, GA, VLT, Industry EBW System: 4 x 1 MW tube at 15 GHz to deliver 3 MW in plasma EBW tube developed in collaboration with VLT/MIT/Industry Cost effective with existing NBI 120 keV power supply and utilities at PPPL 1 MW tube capability to be available in FY 06 Significant collaboration/industry opportunities EBW System Budget ($k) Total budget $ 8,900k PPPL $1,950k Collaboration/industry $6,950k VLT role (~ $400k) is crucial for the tube development.

M. OnoNSTX 5yr plan 13 Plasma Diagnostic Plan: Strong Collaboration Contributions * Innovative Diagnostic Initiatives * * * * *

M. OnoNSTX 5yr plan 14 PPPL DIAGNOSTIC UPGRADES CRUCIAL ELEMENTS OF 5 YEAR RESEARCH PLAN

M. OnoNSTX 5yr plan 15 The NSTX 5-Year Plan is an Exciting and Cost-Effective Element of the U.S. Fusion Energy Science Program Quality and Relevance are High Research facility and integrated national research team are both world class Forefront scientific results and innovative plans in all key areas: –Stability, Transport, Startup and Sustainment, Boundary, Integrated Scenarios Plans are directly aligned with FESAC IPPA goals Collaboration across a broad frontier: –ICC’s, Tokamaks, Astrophysics, Fusion Technology Contributes to ITPA Providing scientific basis for attractive CTF and Demo Facility Operation and Upgrades are Cost Effective Three NJ Governor’s Safety Awards 90% availability, average of 112 shots per operational week since FY 01 –Thorough plan to fix TF joints and avoid future losses of run time Innovative facility and diagnostic upgrades support each area of research –PPPL NSTX upgrade costs average 10.5% of total budget over five year period Total proposed yearly budget about 10% above FY2004 President’s request