Muon trigger upgrades, missing since not aimed towards DOE funding PHENIX upgrades: view presented to DOE R&D $3.5M Construction $16.6M Au-Au p-p 200 Si-Si.

Slides:



Advertisements
Similar presentations
FVTX Transition to Operations PHENIX FVTX Close Out April 23, 2012 BNL 1 FVTX Close Out Review Ed OBrien April 23, 2012.
Advertisements

David M. Lee Los Alamos National Laboratory Heavy Ion Program 1. Dave Lee – Heavy Ion Program – 15 min 2.Mike Leitch – pp, dAu – 30 min 3.Pat.
A “BTeV” Hybrid Pixel Telescope for MTest David Christian May 4, 2007.
3 Oct Cost and Schedule Update Craig Ogilvie, Iowa State University Analysis of system risks Update schedule  Critical path.
PHENIX Vertex Tracker Atsushi Taketani for PHENIX collaboration RIKEN Nishina Center RIKEN Brookhaven Research Center 1.Over view of Vertex detector 2.Physics.
PXL Electronics Status update for HFT TC meeting on May 11, 2010 at LBNL 1HFT TC 05/11/ LG.
The BTeV Tracking Systems David Christian Fermilab f January 11, 2001.
3D chip and sensor Status of the VICTOR chip and associated sensor Bonding and interconnect of chip and sensor Input on sensor design and interconnection.
US CMS Phase 2 R&D Discussion 30-July-2013 “Phase 2 muon R&D” J. Hauser, UCLA  Add redundancy (power) to trigger where most needed  First and innermost.
David L. Winter for the PHENIX Collaboration PHENIX Silicon Detector Upgrades RHIC & AGS Annual Users' Meeting Workshop 3 RHIC Future: New Physics Through.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
Bump Bonding and Thinning of Hybrid Pixel Detectors Kiyoshi Tanida (RIKEN) Johann M. Heuser (RIKEN) PHENIX upgrade workshop, Aug 2002 Contents Bump bonding.
D. Lissauer, BNL. 1 ATLAS ID Upgrade Scope R&D Plans for ATLAS Tracker First thoughts on Schedule and Cost.
Jon S Kapustinsky 11/17/2010 Jon S Kapustinsky FVTX Commissioning Plan 1.71 Jon S Kapustinsky 1.
Simulation issue Y. Akiba. Main goals stated in LOI Measurement of charm and beauty using DCA in barrel –c  e + X –D  K , K , etc –b  e + X –B 
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
Pixel Upgrade Status and Plan G.M. Bilei Firenze Mar. 6 th 2013.
Gerd J. Kunde - LANL1 The FVTX Technology  Outline Overall Picture Silicon Detector –Geometry, Layout, Process Readout Chip –FNAL Chips, New Chip PHX.
DOE/NSF Review of the U.S. ATLAS Construction Project June 3-4, 2002 WBS 1.1 Silicon Subsystem Abe Seiden UC Santa Cruz.
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
Charles University in Prague Institute of Particle and Nuclear Physics Brief presentation Zdenek Dolezal.
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
U N C L A S S I F I E D 7 Feb 2005 Los Alamos RHIC Program David M. Lee Heavy Ion and Medium Energy 7 February 2005.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese U.S. ATLAS Review Revised Version November 29, 2000.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
M. Brooks, LANL 1 02/19/07 Review Schedule The FVTX upgrade project Melynda Brooks Silicon Sensor, Chip, ReadoutJon Kapustinsky Mechanics Walt Sondheim.
Lab Coordination Meeting 3/21/13LHC IR Quadrupole Plan – G. Sabbi 1 LARP Magnet Systems Plan GianLuca Sabbi Lab Coordination Meeting March 21, 2013.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
A Silicon vertex tracker prototype for CBM Material for the FP6 Design application.
2 Silicon pixel part Done and to be written Written! Under way To be done Introduction 1.Hybrid Pixel Assembly Concept 2.Silicon sensor 1.First thinned.
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
David Lee, FVTX Review Nov Cost and Schedule WBS 1.0 David M. Lee Los Alamos National Lab Deputy Project Leader.
Thin Silicon R&D for LC applications D. Bortoletto Purdue University Status report Hybrid Pixel Detectors for LC.
Hybrid Pixel R&D After BTeV As of two years ago: –FNAL-designed readout chip had two minor fatal flaws. –No system demonstration had yet been done. An.
Vertex Detector Options and R&D Requirements Upgrade DC Meeting December 11, 2002 Yuji Goto (RIKEN/RBRC) for the Silicon USG.
PHENIX Silicon Vertex Tracker. Mechanical Requirements Stability requirement, short and long25 µm Low radiation length
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
Silicon Strips for PHENIX SVTX Status and Plans for Silicon Strips in PHENIX SVTX Abhay Deshpande Recent development: Possibility of the second Si Pixel.
UCSC August 12, 2008 U.S. Upgrade R&D Meeting: Strip Detector  Seiden.
Axel Drees, Stony Brook University BNL review of RHIC detector upgrades, March 14 th 2006 Overview of PHENIX upgrades Goals of PHENIX upgrades program.
Aug 2003 Craig Ogilvie 1 Landscape/Goals for R&D  Goal: Barrel+structure ready Summer/Fall 06 (run07)  Goal: Endcaps ready Summer/Fall 07 (run08)  RIKEN.
Tasks and time scale T. Tsuboyama (KEK). DSSD production Test production by Micron and SINTEF (Talk by M. Valentan) HPK decided to restart DSSD business.
Brenna Flaugher Sept. 24 th Lehman Review1 Run IIB Silicon Upgrade: Cost and Schedule Lehman Review Sept. 24, 2002 Brenna Flaugher Run IIB Silicon Project.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Cost and Schedule.
Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs Cost Schedule.
1 FVTX Monthly/Quarterly Report January 2009 Cost Summary Schedule Summary Current technical status of each WBS item.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
Jun 2003 Craig Ogilvie 1 Landscape/Goals for R&D  Goal: Barrel+structure ready Summer/Fall 06 (run07)  Goal: Endcaps ready Summer/Fall 07 (run08)  RIKEN.
PHENIX BNL 6/3/2005 Walter Sondheim, Jan Boissevain, Dave Lee PHENIX UPGRADES: SVTX + SI ENDCAPS.
PHENIX Timetable FY 2002 FY 2003 Prepare S  S  with Au-Au beams May 2001 March 2002 Jan 2001 June 2002 Sept st  physics (J/  suppression &
LANL Nuclear Physics 15/10/2006 Personnel and Budgets Mike Leitch, P-25 Personnel in the Program LANL Leadership Roles Physics and Budgets for the next.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
Robert Pak VTX Meeting Sept. 7, 2004 VTX. Robert Pak VTX Meeting Sept. 7, 2004 PHENIX Central Region From VTX Proposal (dims in mm) HBD is standalone.
M. Brooks, 16-Dec-00 Muon Collaboration Meeting North FEE Schedule Assume installation in 2002 shutdown, June-October(?), gives 1.5 years to complete pre-installation.
1 KU MRI What is the MRI? What is KU doing? Firmware/testboards Optical hybrids Sensors.
Robert Pak VTX Meeting June 3, Robert Pak 1 VTX Meeting June 3, 2005 General Progress Started general integration meetings for detector upgrades.
March 25, FVTX Monthly/Quarterly Report June, 2009 Technical Status, Cost & Schedule Melynda Brooks, LANL.
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
Executive Committee, Toronto August 3, 2005 TRT Barrel WBS 1.2/3.2 Harold Ogren Indiana University.
Silicon strip detector R&D issues –readout chip decision –interface with PHENIX –ladder Technical options –SVX4 or MVD-TGV+AMU/ADC recut –other sensors.
Rene BellwiedSTAR Tracking Upgrade Meeting, Boston, 07/10/06 1 ALICE Silicon Pixel Detector (SPD) Rene Bellwied, Wayne State University Layout, Mechanics.
RD program on hybrids & Interconnects Background & motivation At sLHC the luminosity will increase by a factor 10 The physics requirement on the tracker.
B => J/     Gerd J. Kunde PHENIX Silicon Endcap  Mini-strips (50um*2mm – 50um*11mm)  Will not use ALICE chip  Instead custom design based on.
David M. Lee Los Alamos National Laboratory DOE Review of the Heavy Ion Program Agenda Introduction – Joel Moss 1. David M. Lee – KB02 program.
1 FVTX Quarterly/Monthly Report July 2008 Melynda Brooks, Dave Lee.
Evidence for Strongly Interacting Opaque Plasma
P. Morettini Towards Pixel TDR PM - ITk Italia - Introduction 8/2/2017.
Silicon Pixel Detector for the PHENIX experiment at the BNL RHIC
SVT – SuperB Workshop – Frascati Sept. 2010
Perugia SuperB Workshop June 16-19, 2009
Presentation transcript:

Muon trigger upgrades, missing since not aimed towards DOE funding PHENIX upgrades: view presented to DOE R&D $3.5M Construction $16.6M Au-Au p-p 200 Si-Si ++ p-p 500 Au-Au

PHENIX D M Lee

PHENIX D M Lee

PHENIX Institutional Responsibilities D M Lee taskinstitution mechanical support, coolingHYTEC/LANL integration, infrastructureBNL pixel hybrids, sensor/readoutLANL pixel pilotISU pixel assembly, ladder busLANL pixel femSUNY-S/B DCM’sColumbia

Simulations Tasks endcap Implementation of new geometry in PISA Continual update of geometry with evolving mechanical design Ministrip size determination - Detailed simulation of pp capability Detailed simulation of Au-Au capability Vertex tracking code Detailed track matching Integration with barrel and HPD/TPC Overall coordination - UNM, Doug Fields has expressed an interest in helping with the simulation and has a student. He hasn’t defined the level of effort yet. The simulations to date for the end caps have been done by Pat McGaughey and Dave Lee and the new geometry has been done by Hua Pei. Some interest in simulations has been expressed by Pat,Gerd, and Dave. Mechanical Tasks endcap and barrel Overall coordinaton Lee Ladder prototyping cooling test HYTEC Overall structure prototype HYTEC Production liason Lee, HYTEC Ladder assembly - Combined endcap/barrel assembly - Cooling system production Integration with PHENIX/HBD/TPC - Dave Lee has been working with a company, HYTEC, to do the mechanical design of the total support structure and cooling design for the barrel and endcap. They produced a conceptual design based on their work on ATLAS that covered ladder structures, cooling, and the combined barrel and endcap support. D M Lee

Sensor Tasks endcap Overall coordination - Ministrip Design Prototyping - Testing Testing with bump bonded frontend chip Bump bonding - Production liason Electronics endcap Overall coordination Kunde? Frontend ministrip chip design Kunde Prototype Frontend chip fermilab Testing frontend chip Kunde, fermilab Production frontend chip Kunde, fermilab Supporting chip design, pilot chip/chips Test supporting chip Slow control HV design - Readout cable design Power plant DCM liason to Chi Gerd Kunde has established a collaboration with Ray Yarema of FERMILAB to design the frontend chip to bump bond to the sensors. In addition all facilities at FERMILAB are available to us for Q/A, assembly testing, etc. Construction where ? Coordinator Integration electrical and mechanical who? D M Lee

FermiLab Electronics Cost Estimate Chip design/testing – 2 man-years - $275K (includes all overhead costs) Prototype chip fabrication- $40K (small chip), or $80K (large chip) Test board $5K Engineering run (10-12 wafers) $200K 9 Extra wafers using same masks - $45K Production wafer level testing –engineering, tech time, circuit board, probe card - $60K Contingency?? PHENIX Beginning cost basis D M Lee

Fermilab Electronics Schedule Estimate Design specifications completed 10/03 Start design 12/03 Submit prototype 7/04 Prototype testing completed 12/04 Redesign completed for engineering run 1/05 Engineering run back 3/05 PHENIX D M Lee

PHENIX D M Lee

Physicist- mechanical liason, electronic liason, simulation – 3 FTE Electronic Engineer – Fermilab – construction Budget – 2 FTE Electronic Integration Engineer – construction Budget FTE Tech – construction budget – 2 FTE Lab space, Q/A,Assembly Infrastructure – lab space, testing assembly, FNAL, HYTEC, LANL, BNL Institutionals LANL, ISU,Columbia,UofCol,UNM,NMSU?,Ecole Poly?, Saclay?, SUNY-SB, PHENIX LANL Manpower Estimate D M Lee

Construction Project 2 – EndCapsDOE (k$) Mechanical support and cooling (2 endcaps)195 Hybrid pixel layers (2 encaps)4766 Management100 Total5061 Overhead on DOE contribution % contingency2458 Total8849 PHENIX Initial endcap cost estimate D M Lee

PhysicistPhysics AnalysisSilicon Upgrade Barnes2020 Brooks7525 Burward-Hoy100 Kunde40 40 Lee2550 Leitch100 Liu7525 McGaughey50 50 Moss20 Silvermyr100 Sullivan40 vanHecke5050 PHENIX Physicist Manpower Estimate D M Lee