MANGT 660 (A): Supply Chain Planning and Control Chapter 4 Master Production Scheduling (1/2)

Slides:



Advertisements
Similar presentations
Ch. 6 Master Production Scheduling
Advertisements

EYYUP ORAK Material requirements planning (MRP) is a computer-based inventory management system designed to assist production managers in.
Dependent Inventory: Material Requirements Planning BA 339 Mellie Pullman.
Managing Production across the Supply Chain
MRP and Related Concepts
Material Requirements Planning (MRP)
Master Production Scheduling
POM - J. Galván 1 PRODUCTION AND OPERATIONS MANAGEMENT Ch. 15: Material Requirements Planning (MRP)
21–1. 21–2 Chapter Twenty-One Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Class 24: Chapter 15: Materials Requirements Planning Class 24 Agenda –Review Deliverables Due Dates –Review Final Exam 90% of the 30 questions will come.
MRP.
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
MGMT Materials Management Systems Master Production Scheduling Chapter 3.
DOM 301 : Operations Management Practice
1 Chapter 15 MRP and ERP. 2 Dependent demand: Demand for items that are subassemblies or component parts to be used in production of finished goods. Dependant.
MRP, MRP II, and ERP.
Chapter 12 MRP and ERP.
Material Requirements Planning
Copyright © 2014 McGraw-Hill Higher Education. All rights reserved. CHAPTER 14 Materials and Resource Requirements Planning McGraw-Hill/Irwin.
1 1 Slide © 2000 South-Western College Publishing/ITP Slides Prepared by JOHN LOUCKS.
1 1 Slide © 2001 South-Western College Publishing/Thomson Learning Anderson Sweeney Williams Anderson Sweeney Williams Slides Prepared by JOHN LOUCKS QUANTITATIVE.
MRP Material Requirements Planning. MRP …is a planning and scheduling technique used for batch production of assembled items. … is a computer-based information.
© 2004 by Prentice Hall, Inc. Upper Saddle River, N.J Operations Management Material Requirements Planning (MRP) & ERP Chapter 14.
University of Southern California Enterprise Wide Information Systems Manufacturing Planning and Execution (cont.) Instructor: Richard W. Vawter.
Material Requirements Planning (MRP) Computer-based information system for ordering and scheduling of dependent-demand inventories, i.e. what is needed,
Aggregate Planning and Resource Planning Chapters 13 and 14.
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
Operations Management
Objectives After completing this chapter, you will be able to:
PowerPoint presentation to accompany Operations Management, 6E (Heizer & Render) © 2001 by Prentice Hall, Inc. Upper Saddle River, N.J Material.
1-1 McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved 1 Chapter 18 Materials Requirements Planning.
Operations Management Material Requirements Planning
MRP Systems MRP – Material Requirements Planning Commonly used method in industry to coordinate the production scheduling of end items and their associated.
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved. Chapter.
Chapter 15 MRP and ERP.
Irwin/McGraw-Hill © The McGraw-Hill Companies, Inc., 1998 Material Requirements Planning (MRP) Chapter 15 11/7/05 Overview Position of MRP in Operation.
MRP and ERP McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
1 Operations Management MRP Lecture 22 (Chapter 14)
13-1MRP and ERP William J. Stevenson Operations Management 8 th edition.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. MRP (Material Requirement Planning) (Method under Dependent.
Concepts in Enterprise Resource Planning 4th Edition Chapter three Production and Supply Chain Management Information Systems 1Concepts in Enterprise Resource.
Materials and Resource Requirements Planning CHAPTER FIFTEEN McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
MRP and ERP McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
1 MRP: Based on Dependent Demand u This chapter explores: –Master production schedule –Material Requirements Planning (MRP) »System structure »Example.
1 MRP and ERP Chapter Transparency on aggregate to master plan.
Aggregate Planning and Resource Planning Chapters 13 and 14.
Master Production Scheduling
P RODUCTION PLANNING What do we need to produce? Process Machinery & Equipment Labor Skills Material 1.
Material Requirements Planning. Materials requirements planning (MRP) is a means for determining the number of parts, components, and materials needed.
Concepts in Enterprise Resource Planning Third Edition Chapter Four Production and Supply Chain Management Information Systems.
15 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Resource Planning Chapter 15.
Resource Planning Chapter 15.
1 MRP AND ERP Chapter 12 MIS 373: Basic Operations Management Additional content from Jeff Heyl and L. Beril Toktay.
BUAD306 MRP.
Lecture 5 Master Product Scheduling Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College, Emeritus,
Murat Kaya, Sabancı Üniversitesi 1 MS 401 Production and Service Systems Operations Spring Master Production Scheduling (MPS) Slide Set #9.
Chapter 12: Learning Objectives Instructor Slides You should be able to: 1.Describe the conditions under which MRP is most appropriate 2.Describe the inputs,
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
© 2008 Prentice Hall, Inc.14 – 1 Operations Management Chapter 14 – Material Requirements Planning (MRP) and ERP PowerPoint presentation to accompany Heizer/Render.
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
15-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
EVOLUTION OF ERP 1960’s - Systems Just for Inventory Control 1970’s - MRP – Material Requirement Planning (Inventory with material planning & procurement)
MRP and ERP McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Reid & Sanders, Operations Management © Wiley 2002 Material Requirements Planning 15 C H A P T E R.
LESSON 4 Master Production Scheduling
Master Production Scheduling (MPS)
Facility Inventory Old Facilities Modern Facilities Classroom Size
Chapter 5 Master Production Scheduling
CHAPTER 14 MRP and ERP.
Chapter 14 Dependent Demand
Presentation transcript:

MANGT 660 (A): Supply Chain Planning and Control Chapter 4 Master Production Scheduling (1/2)

Master Production Schedule (MPS) A key link in the manufacturing supply chain P&C process An anticipated schedule of demand – Tool for controlling product availability Driven by the aggregate plan (Ch3) – Disaggregation (i.e. break down) of the aggregate plan – More detail than aggregate plan – Focusing on distinct end items rather than composite or average units of product – Finer time intervals (e.g. weeks rather than months) 2

MPS (cont’d) MPS S&OP Aggregate Plan Demand Management Marketing Planning Financial Planning Business Planning Material requirements planning (MRP) Production planning Supply chain planning Capacity Planning 3 MPS interfaces: Ch9 Ch3 Ch6 Ch2

MPS (cont’d) Inputs – Beginning inventory – Customer orders – Finished goods warehouse requirements – Service part requirements – Sales forecast for a particular end item – Safety stock – Orders for safety stock (stabilization inventory in anticipation of future needs) – Inter-plant orders (component parts rather than products Outputs – Production per period needs to meet anticipated customer demand Trade-off between costs and product availability 4

MPS example 1 Schedule of planned production Q. Disaggregation? – Two models (Model A & Model B) – Demand composition of Models (Model A = 40%; Model B = 60%) – Demand typically occurs uniformly throughout a month – Project the week-by-week production needs for the two models (4 Weeks per Month) 5

MPS example 1 (cont’d) 6 =100=400 6 Disaggregation of production plan

Different organizational environments in which MPS takes place Firms can have different strategies for different product lines and, thus, use different MPS approaches. 1)Make to Stock 2)Make to Order 3)Assemble to Order 7 MPS environment

MPS environment (cont’d) 1)Make to Stock – Emphasizes immediate delivery of reasonably priced off-the-shelf standard items – MPS is the anticipated build schedule of the items required to maintain the finished goods inventory at the desired service level. – Mass-production (continuous, repetitive, or intermittently) line or in batch production – Uses Bill of Material (BOM) 8

MPS environment (cont’d) Bill of materials (BOM) – A detailed description of an “end item (i.e., finished product)” and list of all of its raw materials, parts, and sub- assemblies. Three types of BOM 1)Indented list 2)Parts list 3)Product structure tree 9

MPS environment (cont’d) BOM example 1: BBQ grill gift set 10 Tote Bag Fork Spatula Tongs Metal Spatula + Handle A + Rivets (2) + Leather Tie = Metal Tongs + Handle B + Rivets (8) = Rivets Handle A Metal Tongs Leather Tie Handle B Metal Fork Metal Spatula Metal Fork + Handle A + Rivets (2) + Leather Tie = Steel Sheet (1 per each) Wood Block (1 per Handle A; 2 per Handle B) Purchased as a finished item =

MPS environment (cont’d) Indented list and parts list 11 “Parent” “Children”

MPS environment (cont’d) Product structure tree 12

MPS environment (cont’d) BOM example 2: Using the BOM shown below, how many of part E will be needed if 20 units of end item A are needed? 1) Start with the Bs. 2) 20 As x 2 Bs for each A = 40 Bs; 40 Bs x 4 Es for each B = 160 Es. 3)Then determine the Es needed for the Ds (20As x 2Ds for each A = 40 Ds; 40 Ds x 2 Es for each D = 80 Es). 4)The total number of Es = =

MPS environment (cont’d) 2)Make to Order ― MPS for the raw material and the standard items that are purchased, fabricated, or built to stock and another MPS for items that are custom engineered, fabricated, and assembled 3)Assemble to Order ― Can supply a large variety of final product configurations from standard components and subassemblies within a relatively short lead time. 14

MPS environment (cont’d) 3)Assemble to Order (cont’d) ― Example: Boeing’s 787 Dreamliner supply chainBoeing’s 787 Dreamliner supply chain Costs of delays and penalties: $4 billion+ Major suppliers share the risks as well as the profits. Major pre-assembled sections of the aircraft are to be flown in to Boeing’s Everett Washington final assembly plant from Japan, Italy, South Carolina and Kansas. Component suppliers stretch to China and India and beyond. Customer order decoupling point could be in either raw materials at the manufacturing site or the supplier inventory. Depending on how similar the products are it might not even be possible to pre-order parts. 15

MPS (cont’d) BOM Time bucket: Individual time period for planning Cumulative lead time: The longest lead-time path in the BOM Available to Promise (ATP): Part of planned production that is not committed to a customer (to be covered in Ch4(2) slides) 16

MPS (cont’d) Planning horizon: – Entire time period covered by the MPS (must be always bigger than cumulative lead time to provide enough time for the production) – Includes: Production time Procurement time Engineering time for custom environments Delivery-to-customer response times 17

MPS example 2 18 Time bucket: 1 week Planning horizon: 8 weeks Cumulative lead-time: 6 weeks (See the “product structure tree” at slide p.12) MPS for the BBQ grill gift set

MPS example 3 GFR, Inc. schedules production of its best selling dog food, Rex-2, in batches of 130 units whenever the projected ending inventory balance in a quarter falls below 20 units. It takes one quarter to make a batch of 130 units. GFR currently has 80 units on hand. The sales forecast for the next four quarters is: 19

MPS example 3 (cont’d) a.Prepare a time-phased MPS record showing the sales forecast and MPS for Rex-2. b.What is the inventory balances at the end of each quarter? 20

MPS example 3 (cont’d) c.During the first quarter, no units were sold. The revised forecast for the rest of the year is (Assume no safety stock is needed, and a batch is already ordered in the first quarter): How does the MPS change? 21