Colorado SpringsJanuary 23~26, 2007 1 Winter-Spring 07 CCSDS Management Council CNES report Jean-Marc SOULA (CNES)

Slides:



Advertisements
Similar presentations
Wyn Cudlip BNSC/QinetiQ Presentation to WGISS24 DLR, October 2007 CCSDS Liaison Consultative Committee on Space Data Systems.
Advertisements

CSTS Service Instance Identification Summary of CSTS Discussions on M.Götzelmann.
10-Dec-2012-cesg-1 SLS-OPT: Optical Communications Working Group (1 of 6) Problem and Issues: None. However, schedule for standards publication is very.
CCSDS Navigation Working Group David Berry 10/01/2007.
Folie 1 Service Oriented Architecture - Prototyping study - DLR/GSOC Author: S.Gully.
Cross Support Transfer Services – Forward Frames Service 10 – 15 November 2014 London, United Kingdom John Pietras Global Science and Technology, Inc,
30-March-2015-cesg-1 Martin Suess (AD) Rick Barton (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
1 October 2009 Cross Support Transfer Services (CSTS) Future Services as of Spring 2014.
March 2004 At A Glance ITOS is a highly configurable low-cost control and monitoring system. Benefits Extreme low cost Database driven - ITOS software.
CCSDS october 2008 meeting – Berlin 1 Space Data Link Security BOF SEA/SLS October 14, 2008 meeting.
Sep 2003 CCSDS Navigation WG Progress Report MOIMS Meeting Oct 2003 CSC, Maryland, USA Felipe Flores-Amaya CCSDS Navigation WG.
1 CROSS SUPPORT SERVICE ARCHITECTURE Takahiro Yamada (JAXA/ISAS) CCSDS Meeting, Heppenheim, Germany 2 October 2007.
Cesg-1 June 2010 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
Athens, GreeceApril 08-13, Spring 2005 CCSDS Management Council CNES report Jean-Marc SOULA (CNES)
Institutsbezeichnung: Quellenangabe 1 CCSDS MANAGEMENT COUNCIL Canadian Space Agency St-Hubert, Quebec, Canada May 2004 DLR Report Martin Pilgram,
ESA UNCLASSIFIED – For Official Use Workshop #23 Pasadena, USA 23-27Mar15 Mario Merri, ESA/ESOC SM&C WG Plenary.
1 Low Cost Multimission Telecommand and Telemetry Natal Ground Station (TT&C) by Jean Paul DUBUT (INPE/CRN) 1 st COROT Workshop – Natal – RN – Brazil.
1 26 October 2005 Space Internetworking Services Report to the CCSDS Management Council 26 October 2005 R. Durst, D. Stanton.
Delta-DOR SIG: Report of the Fall 2007 Meeting Heppenheim, Germany October 5th, 2007 Roberto Maddè ESA/ESOC
1 Space Communications Cross Support Architecture WG: Charter and Work Plan October 2010 London, UK Takahiro Yamada, JAXA/ISAS.
June 2004 SIW-4 - IP in Space Implementation Guide 1 Handbook for Using IP Protocols for Space Missions James Rash - NASA/GSFC Keith Hogie, Ed Criscuolo,
Cesg-1 SLS REPORT 7 May 2010 Jean-Luc Gerner (AD) Gilles Moury (DAD) SPACE LINK SERVICES (SLS) AREA SLP and NGU sections Only.
The Consultative Committee for Space Data Systems Report to CCSDS AGENC Y Note to CMC members: This template follows the CMC-agreed outline for agency.
1 ROAD MAP OF THE CCSDS ARCHITECTURE WORKING GROUP (AWG) Draft, Issue March 2003 Takahiro Yamada, Chair, AWG.
Panel P1J: Navigation Data May 2001 CCSDS P1J Status Report P1 Plenary Meeting May 23, 2001 TSG Meeting May 24-25, 2001 Pasadena, California, USA Felipe.
C. Huc/CNES, D. Boucon/CNES-SILOGIC, D.M. Sawyer/NASA/GSFC, J.G. Garrett/NASA-Raytheon Producer-Archive Interface Methodology Abstract Standard PAIMAS.
Ajh January 2007 CCSDS “Books” Adrian J. Hooke CMC Meeting, Colorado Springs 26 January 2007.
WGISS /09/2015 DATA PRESERVATION – CNES APPROACH B. Chausserie-Laprée.
CCSDS Meeting CNES Report, 05/12/2004 CNES 1 CCSDS - MOIMS Area Information Packaging and Registry WG CNES Report on activity November April 2005.
CCSDS Meeting CNES Report, 2/11/2004 CNES 1 CCSDS - MOIMS Area Data Archive ingestion WG Information Packaging and Registry WG CNES Report on activity.
November MOIMS AREA PLENARY NAVIGATION WG REPORT November 2004 CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS.
FSH/security SLS-SLP fall2009 (version 4) Page 1 Security Headers + Homogeneous approach to FSH and Insert Zone in TM/AOS/TC frames: some problems and.
Cross Support Service Management Overview Nicolas Champsavoir DCT/PS/SSC CCSDS – CSS Area Cross Support Services ex-SLE Service Management.
Wyn Cudlip BNSC/QinetiQ Presentation to WGISS25 China, February 2008 CCSDS Liaison Consultative Committee on Space Data Systems.
BITTT and CCSDS in China October About BITTT BITTT is the abbreviation for Beijing Institute of Tracking and Telecommunications Technology.
CSTS File Transfer Service CS File Transfer Specification – Initial Discussions IOAG Service Catalogue #1 Scope Candidate Applications File Content.
Information Architecture WG: Report of the Spring 2004 Meeting May 13, 2004 Dan Crichton, NASA/JPL.
1 19 September 2005 Space Link Services Area report to CMC Reston, Virginia, USA, 26 September 2005.
CSA St Hubert, Quebec24-25 May Spring 2004 CCSDS Management Council CNES report Geneviève Campan (CNES)
1 Cross Support Architecture (CSAWG) Overview, Status, Goals Takahiro Yamada JAXA.
CCSDS march 2008 meeting – Crystal City 1 TC/TM space links security SEA / SLS cross area meeting.
CCSDS Engineering Steering Group: Report to the CCSDS Management Council CMC Meeting May 2004 CSA, Montreal, Canada Adrian J. Hooke Chairman, CESG.
Apr12-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
Information Architecture WG: Report of the Spring 2006 Meeting June 16, 2006 Dan Crichton, Chair NASA/JPL.
Information Architecture WG: Report of the Fall 2005 Meeting September 16, 2005 Dan Crichton, Chair NASA/JPL.
CCSDS Meeting data Archive Ingest - June 2006 CNES 1 CCSDS - MOIMS Area Data Archive Ingest WG CNES Report Rome meeting – June 2006 Claude Huc.
Apr SLS-SLP WG Goal: Progress TM, AOS Space Data Link Protocol Pink Sheets to Blue (OID frame)* Hold due to FSH/Insert Zone/Security discussion.
Dokumentname > Folie 1 > Vortrag > Autor DLR - CMC Report Martin Pilgram, DLR-GSOC, October 2005, Washington.
Space Data Link Secure Protocol Simulator Bruno Saba DCT/TV/IN 15/04/2010.
Data Archive Ingest WG Report to MOIMS Plenary May 14, 2004.
The Consultative Committee for Space Data Systems 1 JAXA CCSDS Status April 12 – 13, 2005 Kaneaki Narita Consolidated Space Tracking and Data Acquisition.
May SPACE LINK AREA MID-TERM REPORT SUMMARY TECHNICAL STATUS 1.DATA COMPRESSION WG Goal : specify an image compression algorithm fulfilling identified.
CCSDS Navigation Working Group David Berry 01/16/2007.
1 Systems Architecture WG: Charter and Work Plan October 23, 2003 Takahiro Yamada, JAXA/ISAS.
Panel P1J: Navigation Data April 2002 CCSDS P1J Status Report Spring Meeting, ESA/ESOC, Darmstadt, Germany Dates: April 8 – 11, 2002 Felipe Flores-Amaya.
Report to CCSDS AGENCY Note to CMC members: This template follows the CMC-agreed outline for agency reports Replace RED text with your agency’s name and.
CEOS WGISS Meeting, Hanoi May CCSDS Liaison Consultative Committee on Space Data Systems Wyn Cudlip BNSC/QinetiQ Presentation.
The Consultative Committee for Space Data Systems JAXA CCSDS Status to CMC/8Dec04/K.Narita Page 1 JAXA Agency Report to CMC and ISO/SC13 Kaneaki Narita.
1 20 April 2009 Cross Support Service Area Cross Support Service Area Opening Plenary Colorado Springs, Colorado, USA 20 April 2009 Erik Barkley (AD) /
Standard Service Configurations 31 March – 3 April 2014 Noordwijkerhout, Netherlands John Pietras Global Science and Technology, Inc., Greenbelt, MD, USA.
Information Architecture WG: Report of the Fall 2004 Meeting November 16th, 2004 Dan Crichton, NASA/JPL.
Apr SLS-SLP WG Goal: Progress TM, AOS Space Data Link Protocol Pink Sheets to Blue (OID frame)* Hold due to FSH/Insert Zone/Security discussion.
ESA Status Report Jean-François Kaufeler Montreal, 24 May 2004.
CCSDS IPsec Compatibility Testing 05/4/2016 CHARLES SHEEHE, CCSDS GRC POC OKECHUKWU MEZU, Test Engineer 1.
Joint Meeting of the CCSDS and the OMG-SDTF
Systems Architecture WG: Charter and Work Plan
SOIS-APP Working Group Report Jonathan Wilmot (WG Chair)
CCSDS Navigation Working Group
BITTT and CCSDS in China
Space Data Link Security BOF SEA/SLS October 14, 2008 meeting
Presentation transcript:

Colorado SpringsJanuary 23~26, Winter-Spring 07 CCSDS Management Council CNES report Jean-Marc SOULA (CNES)

Colorado SpringsJanuary 23~26, Changes in CNES organization: None. CNES has launched a new “CCSDS compliant satellite” : COROT on December 27, 2006… now in in-flight acceptance. 1. CNES general information

Colorado SpringsJanuary 23~26, Potential involved –CNES manpower involved in the last 6 months was around 3.5 EFT effort –Present participation covers all areas except Spacecraft On Board Interfaces Services (SOIS) –This should be maintained for the next coming months Likely with same distribution Depending on operating plan presented by CESG and AD’s 2. CNES Ressources on CCSDS

Colorado SpringsJanuary 23~26, Spacecraft –All CNES satellites under development are CCSDS compliant (at least partially) –Next to be launched : SMOS and JASON-2 (mid 2008), including an SLE interface to CNES stations. –Summary of future satellites Myriade family : Microscope, Picard, Venµs, Taranis, … Dual satellites : Pleïades 3. Implementations (1/3)

Colorado SpringsJanuary 23~26, Ground Systems Project on a global harmonization of CNES ground segments, from multi-mission thru product lines for a progressive implementation in the longer term (2007–2010). Implementation of RF&M, OPM, TDM, Packet TM/TC, etc… operational end SLE gateways for SLE transfer services with CNES multi-mission facilities (2004 on Provider side ; 2006 on User side ). SLE transfer services on the User side for Pleiades project: development in progress for the Control Center. SLE transfer services at ground stations level planned for a next phase (2007). So far, SLE Service Management anticipated only as an interface for external partners. 3. Implementations (2/3)

Colorado SpringsJanuary 23~26, New standards applicable to CNES Projects in 2006 –CFDP B-3 (CFDP)720.1-G-2 (part 1 intro & overview)720.2-G-2 (part 2 Implementers guide) –Lossless data compression B G-1 –Space link extension B-1 (FSP service spec) B-2 (F_CLTU service spec) B-1 (ROCF service spec) B-1 (RAF service spec) B-2 (RAF service spec) B-2 (ref. model - Part 1: SLE) –Proximity-1 Space Link Protocol B-3 (Data link)211.1-B-3 (Physical)211.2-B-1 (Coding and synchronisation) –TM B-1 (TM synch. and channel coding)130.1-G-1 (TM synch. and channel coding - Concept) G-1 (Overview of space link protocols)132.0-B-1 (TM space data link protocol) B-1 (Space Packet protocol) –AOS B-1 (AOS space data link protocol) –TC B-1 (TC synch. and channel coding)232.0-B-1 (TC space data link protocol) B-1 (Communications operations procedure) 3. Implementations (3/3)

Colorado SpringsJanuary 23~26, Secretariat: –CNES is grateful to the secretariat for the very good reporting to the CMC in between meetings (e.g.: epoll results) and the data package for this CMC meeting. –Intermediate progress status of action items could also be useful for CMC members. Strategic / Operating plan: –CNES feels that there is a gap between the high level long term objectives and the work in progress. –CNES recommends that each area produces a list of Work Items (completed, in progress, future) they feel should be covered in final and this list identifies the medium/long term Work Plan of CCSDS. –That list would be helpful in the coordination with other standardization organizations. 4. MISCELLANEOUS (1/2)

Colorado SpringsJanuary 23~26, Publications –The Data Description Language EAST Specification (CCSDS B-3) has never been published in spite of “CMC” approval in # –The reason seems to be related to incompatibilities between CNES and Secretariat softwares for drawings. –Issue to be fixed by Secretariat with Editors (CNES: D Minguillon ; NASA: D Sawyer ; J Garrett). Documents: –Access to / recovery of documents on the web site is not always working. –CNES needs word or.pdf files in unprotected format for Books that are introduced in CNES list of applicable standards. 4. MISCELLANEOUS (2/2)