SHAPE RECOGNITION February Program Review Team Tillamook.

Slides:



Advertisements
Similar presentations
Learn all about the year.
Advertisements

SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
THE POSTURE PEDOMETER CUMMERBUND October 2012 Program Review Team Members: Kelly Han Kyle Mauer (Team Lead) Kevin Vo Advisors: Dr. Aziz Inan (Faculty)
January 6. January 7 January 8 January 9 January 10.
Team Fire On The Mountain: Jennifer Bond, Rob Cagan, Michael Patterson, & Jonathan Smith Faculty Advisor: Dr. Joseph Hoffbeck Dr. Peter Osterberg Industry.
The Months and The Seasons Prepared by Claudia Doria and Terra Myers.
2012 CALENDAR. JANUARY 2012 Sunday 日 Monday 月 Tuesday 火 Wednesday 水 Thursday 木 Friday 金 Saturday 土
January 2012 Monday Tuesday Wednesday Thursday Friday Sat/ Sun / /8 14/15 21/22 28/
MONDAYTUESDAYWEDNESDAYTHURSDAYFRIDAYSATURDAYSUNDAY WEEK WEEK WEEK WEEK WEEK CALENDAR PROJECT.
THE POSTURE PEDOMETER CUMMERBUND February 2012 Program Review Team Members: Kelly Han Kyle Mauer Kevin Vo Advisors: Dr. Aziz Inan (Faculty) Srija Pidaparthy.
Senior Design 1 Team Shortnose Sucker: Project Auto-Shifting Bicycle Team –Tim Slevin-Vegdahl (Fall Team Lead) –Joan Javier (Spring Team Lead) –Cyrus Medrano.
What day is today? What`s the date?. Sunday Monday Tuesday Wednesday Thursday Friday Saturday What day is today?
EE/CS 480 Fall September, 2007 University of Portland School of Engineering Project Blue Heron Educational Ball and Beam Control System Team Bryan.
EE/CS 480 Fall February, 2008 University of Portland School of Engineering Project Blue Heron Educational Ball and Beam Feedback Control System Team.
EE/CS 480 Fall March, 2008 University of Portland School of Engineering Project Blue Heron Educational Ball and Beam Feedback Control System Team.
Senior Design WiFi Clock January Program Review  Team  Rosemary Peters  Joe Haggberg  Nate Perkins  Kirby Wigton  Advisor  Dr. Inan University of.
Senior Design 1 University of Portland School of Engineering.
EE/CS 480 Fall September, 2007 University of Portland School of Engineering Project Puffins Complex Multivariable Keypad Input Chip Team RuthAnn.
EE/CS 480 Fall September, 2007 University of Portland School of Engineering Project Puffins Synchronous Chorded Keypad Input Chip Team RuthAnn Gobble.
Sun Tracking Solar Array Team Peacock Lane Team Members: Elise King, Caitlin Greeney, Beverly Raposa & Julius Raposa Advisor: Dr. Yamayee Secondary Advisor:
EE/CS 480 Fall University of Portland School of Engineering Project Osprey RC-VTOL Team Aaron Duane Jesse Fledderjohann Hilary Henderson Chris Hope.
EE/CS 480 Fall September, 2007 University of Portland School of Engineering Project Goldeneye Freshmen Engineering Database for the University of.
EE/CS 480 Fall September, 2007 University of Portland School of Engineering Project Puffins Complex Multivariable Keypad Input Chip Team RuthAnn.
AdviseUP: Mark II Team Hopworks Kekai Ariola Eric Bergquist (Team Leader) Megan Yamamoto Faculty Advisor Dr. Tammy VanDeGrift Industry Advisors Brian Toole.
CS-EE 481 Spring March 2007 University of Portland School of Engineering Project Boring Magnetic-field Monitoring Microprocessor Machine (MMMM) Team.
EE/CS 481 Spring February, 2007 University of Portland School of Engineering Project Killdeer Digital Tire Pressure Monitoring System Team John Hirano.
EE/CS 481 Spring /28/2015 1:18:59 PM University of Portland School of Engineering Project Chitwood eNVy Team Will Dana Mike Dillon John Guptill.
Senior Design 1 University of Portland School of Engineering.
EE/CS 480 Fall /3/2016 8:18:46 PM University of Portland School of Engineering Project Burnside Programmable Logic Solar Radiant Heating System.
CS-EE 481 Spring January 2007 University of Portland School of Engineering Project Boring MMMM (Magnetic-field Monitoring MOSIS Machine) Team Mr.
CS-EE 481 Spring February, 2006 University of Portland School of Engineering Project Molalla Microprocessor-based Charge Controller Team Andrew Melton.
CS-EE 481 Spring January, 2007 University of Portland School of Engineering Project Enterprise Biggerfoot Textbook Exchange Team Andrew Elliott Robert.
EE/CS 480 Fall /29/2015 6:24:03 AM University of Portland School of Engineering Project Burnside Programmable Logic Solar Radiant Heating System.
Shape Recognition March Program Review Team Tillamook.
Project Umpqua Electric Vehicle Drive System Team Abdullah Binsaeed Dustin Buscho Steven Arlint Advisor Dr. Albright Industry Representative Mr. Menig.
CS-EE 480 Fall November, 2005 University of Portland School of Engineering Project Long Tom OTTR Team Annette DeVille Tom Kinnear Jeff Scott Advisor.
CS-EE 480 Fall November, 2005 University of Portland School of Engineering Project Beaver Marsh: Digital Odometer Team Josh Eby Brandon Pearsol Kirk.
CS-EE 481 Spring February, 2005 University of Portland School of Engineering Project Swift Fox Automotive Accelerometer & RPM Monitor Team Andrew.
CS-EE 481 Spring February 2006 University of Portland School of Engineering Project Umpqua Electric Vehicle Drive System Team Abdullah Binsaeed Dustin.
CS-EE 481 Spring 2007 March University of Portland School of Engineering Project Beaver Marsh: Digital Odometer Team Kirk Chen Josh Eby Brandon Pearsall.
SHAPE RECOGNITION November Program Review Team Tillamook.
EE/CS 480 Spring February 2008 University of Portland School of Engineering Project Puffins Synchronous Chorded Keypad Input Chip Team RuthAnn Gobble.
EE/CS 480/481 11/4/2016 6:36:58 PM University of Portland School of Engineering Project Gallon House Program Review 5 Team Evan McNichols Brian Myles Joe.
CS-EE 481 Spring January, 2006 University of Portland School of Engineering Project Santiam Whenever Messenger Team Lisa Eberle Jason Favors Ben.
SunSatFriThursWedTuesMon January
Fall CS-EE 480Team Pit Roach University of Portland School of Engineering November Program Review Team Pit Roach B 2 Logic to L-Edit Translator.
CS-EE 480 Fall October, 2004 University of Portland School of Engineering Project Nutria Web-based Class Forecaster Team Joe Barhoum Brady Prigg.
EE/CS 480 Spring February 2008 University of Portland School of Engineering Team Matthew Gridley Tim Morris Nathan Oliver Advisor Dr. Rylander Industry.
EE/CS 481 Spring February, 2008 University of Portland School of Engineering Project Surf Scoter Electronic Ballast for a Fluorescent Lamp Team McGuire,
Nicole Feliciano (Team Lead) John Figueira (Team Member) Noor Husain (Team Member) Kyle Grotjohn (Team member) Dr. Albright (Faculty Advisor) Jenifer Miller.
CS-EE 480 Fall 2006 November, 2006 University of Portland School of Engineering Team Bridgeport Project BAT Team Jamie Quint Ian Tagge Advisor Dr. Vegdahl,
CS-EE 481 Spring January 2006 University of Portland School of Engineering Project Umpqua Electric Vehicle Drive System Team Abdullah Binsaeed Dustin.
Project Long Tom OTTR Team Annette Collins Tom Kinnear Jeff Scott Advisor Dr. Aziz Inan Dr. Peter Osterberg Industry Representative Mr. Mike Desmith Intel.
NHS Meetings Calendar All Meetings are at 2:20pm unless otherwise stated This logo denotes a General Meeting. This means that ALL MEMBERS must.
TEAM PCG JANUARY PROGRAM REVIEW Garrett Gustafson (Spring Team Lead) Ben Co, Wendelin Mueller, and Julia Weimar-East Project LightBox Primary Faculty Advisor:
Knowledge Bowl System Team Fire on the Mountain: Jennifer Bond, Rob Cagan, Michael Patterson, & Jonathan Smith Faculty Advisor: Dr. Joseph Hoffbeck Dr.
Stoplight pizza Wind belt generator Kyle Grotjohn (Team Lead) John Figueira (Team Member) Noor Husain (Team Member) Nicole Feliciano (Team member) Dr.
CS-EE 481 Spring January, 2007 University of Portland School of Engineering Project Title Team Student 1 Student 2 Student 3 Student 4 Advisor Dr.
The Calendar.
EE/CS 480 Spring February 2008 University of Portland School of Engineering Team Matthew Gridley Tim Morris Nathan Oliver Advisor Dr. Rylander Industry.
CS-EE 480 Fall November, 2005 University of Portland School of Engineering Project Umpqua Electric Vehicle Drive System Team Abdullah Binsaeed Dustin.
CS-EE 480 Spring January 2005 Project Grey Wolf Digital CMOS “Memory” Game Team Lindsay Megyesi Taya Campagna Mason Tabata Weston Kurisu Advisor.
S TOPLIGHT PIZZA W IND BELT GENERATOR Kyle Grotjohn (Team Lead) John Figueira (Team Member) Noor Husain (Team Member) Nicole Feliciano (Team member) Dr.
EE/CS 481 Spring 1 EE/CS January, 2008 University of Portland School of Engineering Project Merlin WOC 60 :Wind Output Converter to 60Hz Team Tammy.
EE/CS 480 Spring February, 2008 University of Portland School of Engineering Project Golden Eagle Fast Fourier Transform Processor Team Sandra Pellecer.
Industry Representative
Wireless Electrocardiogram System Senior Project
Project Grey Wolf Digital CMOS “Memory” Game
Project Owyhee MOSIS Digital Lock
Presentation transcript:

SHAPE RECOGNITION February Program Review Team Tillamook

The Team Ross Hallauer Hailee Kenney Web Master Bethany Nemeth Fall Team Leader Kimberly Tabac Spring Team Leader Advisors: Dr. Aziz Inan (Faculty) Walt Harrison (Industry)

Project Overview Recognizes and counts the number of shapes (circle, square, or triangle) that pass under a camera

Scorecard Minor Milestone – Determined Block Dimensions (due Saturday, December 7, 2013 & completed on Sunday, January 26, 2014) Minor Milestone – Chose a Design for System-Model (due & completed on Saturday, December 7, 2013) Minor Milestone – Ordered Parts for System-Model (due on Friday, January 24, 2014 & completed on Wednesday, January 8, 2014) Minor Milestone – Programmed and Tested Conveyor Belt System (due on Saturday, February 8, 2014)

Additional Accomplishments LCD screen can display graphics (we needed a shield to connect LCD and Arduino) Discovered we needed new parts and ordered them: ARDUCAM Shield SD Card

Upcoming Milestones Milestones expected to be completed on or before due date: Major Milestone – Verified System Model (due Friday, March 7, 2014) Minor Milestone – Completed Rough Draft of Final Report Document (due Monday, March 17, 2014) Minor Milestone – Completed Draft of Final Report Document (due Friday, March 21, 2014) Minor Milestone – Discussed Final Report with Industry Advisor (due Friday, March 28, 2014) Minor Milestone – Finalized Final Report Document (due on Friday, April 4, 2014) Minor Milestone – Presented Progress of Project at Final Program Reviews (due Friday, April 4, 2014)

Evidence LCD screen displays a circle, square, and triangle Conveyor belt is being constructed

Issues/Concerns Still have to work on completing the following: Operate and stop stepper motor Capture an image and store it on to SD card Process the image Identify the shape Update the LCD screen Still need some parts SD card

Conclusion Success in meeting milestones Upcoming milestones Evidence Issues and concerns