Generic & Enduring Functionality to Allow Xoserve to Confirm a Supply Point into a Shipper’s Portfolio UK Link Committee – April 2013.

Slides:



Advertisements
Similar presentations
1 Project Smart Metering Portfolio Foundation Updates June 2013.
Advertisements

Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
Project Nexus Workgroup Unique Sites 4 th November 2014.
1 Smart Metering Portfolio DCC Day 1 Project Smart Metering Portfolio Focus Group Project Update Thursday 06 th June 2013.
MPRN Creation Workgroup Tuesday 27 th March 2012.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Nexus Workgroup CSEP Transition Topic June
IGT Single Service Provision Requirements Update – 27 th March 2013.
UNC Review Group 0178 National Grid Distribution “Reclassification of SSP to Domestic only” Review Group Meeting – 22 February 2008 Chris Warner.
Proposer: Hayley Burden Panel Date: 17th April : Mod Title: Imbalance Charge amendments required to align the UNC with the Network Code on Gas.
Meter Read Validation 11 th August Background The meter read validation principles were developed under ‘The Settlement’ BRD and formed part of.
PN UNC Workgroup iGT Services 7 th February 2012.
Mod 270 Potential Options Rob Hill 15/02/2009. Six potential options following discussion at last months Development Workgroup OptionNameDescription 1Elective.
Distribution Network Interruption - Initialisation 28 September 2010.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
Draft Modification Proposal: Population and Maintenance of Market Sector Code within Sites & Meters Simon Trivella –25 th February 2010 Distribution Workstream.
1 MOD Proposal 0224 Facilitating the use of AMR in the Daily Metered Elective Regime UK Link Implementation Summary & Overview of Solution Options 9 th.
Administrative Changes to the UK-Link Manual Modification 414 and SIS Removal David Addison.
© British Gas Trading Limited 2011 Slide 1 Re-establishment of Shipperless Sites UNC0425 Scenarios Scenario 1 – Last Shipper only activity Effective meter.
1 Smart Metering Foundation Stage February Agenda File Format Changes for Effective Switching Back Population Approach for Effective Switching.
COR3316: Implementation of UNC Modification 0451AV UK Link Committee – May 2014.
1 Industry Shipperless &Unregistered Working Group Wednesday 8th September 10.00am at xoserve.
1 UNC Review Group 175 – Encouraging Participation in the Elective Daily Metered Regime 26 th June 2008.
13 th July 2009 Meeting of Theft of Gas Review Group (UNC245)
Connected System Exit Points Options for strategic regime change Chris Warner.
COR2789 – Measures to Address Unregistered and Shipperless Sites Implementation of MOD424, MOD410a & G
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
Draft Modification Proposal: Population and Maintenance of Market Sector Code within Sites & Meters Simon Trivella –26 th November 2009 Distribution Workstream.
IGT and Shipper Workgroup meeting 28 th February 2011.
DCA timeline and ROM Overview 12 October Smart Metering Indicative Timeline Evaluation Service (EVS) 2528 received / Rough Order of Magnitude.
1 iGT Agency Services migration considerations As part of UK Link replacement programme (incorporating industry requirements) the new systems will need.
User Pays User Committee 12th November 2013
UK Link Technology Refresh
XRN4361 – UK Link Release 2 Data Migration Plan for XRN /03/18
Must Read Process Guide For Shippers
Agenda Action Review Update on IX and iGT access Testing strategy
XRN4770 – NDM Sample Data – Modification 0654 delivery – Amended file format ChMC – 9th January 2019.
Change Management Committee – June 2019 Update
Project Nexus Workgroup
Distribution Workstream UNC Modification 0224 Draft UKLink Implementation Summary Responses 26th February 2009.
RAASP – Solution Options Scenario Comparison
Action: DX0602 Xoserve; to look to provide performance related data appertaining to the confirmations / reconfirmations process. The following values are.
MOD 258A Demand Estimation Sample Point – Shipper Report.
DSC Change Committee Summary – 10th October
COR1072 Enduring Transfer and Trade Arrangements
Topic raised at July 2009 Distribution Workstream
Smart Metering Portfolio DCC Day 1 UK Link Committee DCC Day 1 Shipper File Format Representation Thursday 08th August 2013.
Industry Shipperless & Unregistered Working Group
CSS Consequential Change CoS Shell Record Submission for Discussion at 630R 27th April 2018.
Project Nexus Workgroup
PN UNC Workgroup iGT Services
DSC Change Committee Summary – 13th March ‘19
Transporter Initiated SPA Confirmations on behalf of User Potential Impact Discussion with UK Link Committee.
XRN4249 – Part B Data Migration Plan
Connected System Exit Points - Update
UK Link Replacement Programme additional supporting UNC modifications
Lessons Learnt UKLC - November 2015
M Number Creation process
Project Nexus Workgroup
DN Interruption Phase II
MOD Proposal 0224 Facilitating the use of AMR in the Daily Metered Elective Regime Distribution Workstream Update Following Completion of Analysis 23rd.
UNC Modification 0634 (Urgent) – Post Implementation Assessment
Implementation Approach Distribution Workgroup – June 2014
Unregistered and Shipperless Process
Project Nexus Workgroup
COR3007: UNC MOD 450B – Monthly revision of erroneous SSP AQs outside the User AQ Review Period Implementation UK Link Committee – May 2014.
Customer Issue Management CoMC Update
DSC Change Committee Update
UK Link Timeline June-19 Sept-19 (EUC) Nov-19
DSC Change Committee Update
Presentation transcript:

Generic & Enduring Functionality to Allow Xoserve to Confirm a Supply Point into a Shipper’s Portfolio UK Link Committee – April 2013

Xoserve Initiated Confirmations To enable Distribution Networks (DNs) to fulfil their Uniform Network Code (UNC) obligations, in relation to the below Modifications (MODs), the development and implementation of a functionality that would allow confirmation of a site by Xoserve on behalf of a Shipper is required. Modification 424 Re-establishment of Supply Meter Points – prospective measures to address Shipperless sites (implementation date 01/04/2013) Modification 345 Removal of Daily Metered voluntary regime (implementation date 01/10/2013) Modification 442 has been raised which seeks to reverse MOD 345 Other Modifications (not approved) may utilise this functionality: –Modification 425 –Modification 410A

Change Objectives The Objectives of this change are as follows: 1.To develop and implement a functionality that would allow registration of a site by Xoserve on behalf of a Shipper after a period of notification where the Shipper has not initiated a supply point confirmation when required to do so (e.g. MOD 424). 2.To develop and implement the functionality that would allow the update of simple UK Link parameters by Xoserve on behalf of a Shipper when required to do so (e.g. Change of Gas Nomination Type (MOD 345) or de-aggregation of supply points). Planned implementation date – 2 nd November 2013

Xoserve Initiated Confirmations Existing SPA Registration processes and file formats will be utilised. The solution will recognise if the MPRN relates to a Large Supply Point (LSPs) or a Small Supply Point (SSPs). In the case of a LSPs Nomination and Confirmation files will be submitted and in the case of SSPs Confirmation files will be submitted. Change of Shipper process triggers many output files e.g. TRF, MRI etc Not proposed to separate Xoserve initiated nomination/confirmation response files from Shipper initiated nomination/confirmation files. Xoserve initiated registrations will be identifiable by the Nomination Shipper Reference. This will be populated with XOS_GEN_nnnnnnnn as a unique reference number, nnnnnnnn is a sequence number which begins and can go up to

Xoserve Initiated Confirmations Input files will be generated by Xoserve. File generation numbers used by Xoserve shall not impact Shipper generation files. Registration of sites will use the latest data associated with the MPRN retrieved from UK Link. Xoserve initiated registrations will be identifiable by the Nomination Shipper Reference. This will be populated with XOS_GEN_nnnnnnnn as a unique reference number, nnnnnnnn is a sequence number which begins and can go up to

Nomination Process A single response file will be generated with response records for Shipper initiated transactions and response files for Xoserve initiated transactions. The Shipper initiated transactions will display the Nomination Shipper Reference number provided by the Shipper in the input file and the Xoserve initiated transactions will display the Confirmation Tool generated Nomination Shipper Reference number.

Confirmation and Transfer of Ownership Process A single response file will be generated with response records for Shipper initiated transactions and response files for Xoserve initiated transactions. The Shipper initiated transactions will display the Nomination Shipper Reference number provided by the Shipper in the input file and the Xoserve initiated transactions will display the Confirmation Tool generated Nomination Shipper Reference number.

Comments & Questions Comments to by 10 th April Should you have any question do not hesitate to contact: Darran Dredge or David Addison