MFF is a EC co-funded programme Rome, 3-5 Aprili 2006 ASAS-TN2 Rome, 3-5 April 2006 Maurizio Zacchei, ENAV (MFF PM) Mediterranean Free Flight Programme.

Slides:



Advertisements
Similar presentations
UNIVERSITY of GLASGOW A Comprehensive Approach to ATM Incorporating Autonomous Aircraft ATM Research Group University of Glasgow.
Advertisements

The EMERALD RTD Plan and the ASAS Validation Framework R P (Bill) Booth 10 October 2002.
Page 1 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Autonomous Aircraft OSED CARE-ASAS Activity 3: ASM Autonomous Aircraft OSED.
PETAL A major step Towards Cooperative Air Traffic Services Patrice BEHIER Manager of the Air/ground Co operative ATS Programme Directorate Infrastructure,
Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR CXXX-1A Page 1 The ONESKY (Single-Sky) project and what it means for ASAS.
ASAS TN Second Workshop, 6-8 October 2003, Malmö ASAS-TN Implementation Strategy Plan Tony Henley BAE SYSTEMS.
ENAV S.p.A. ASAS TN I Workshop, April 20031/13 Airborne Spacing and Safety Alberto Pasquini - Deep Blue (ENAV)
Episode 3 1 Episode 3 EX-COM D Final Report and Recommendations Operational and Processes Feasibility Pablo Sánchez-Escalonilla CNS/ATM Simulation.
1 Data Link Roadmap Overview Mike Shorthose, Helios Technology Jorge Grazina, European Commission 25 September 2002.
Advanced Safe Separation Technologies and Algorithms (ASSTAR) Project ASAS-TN2 Workshop #1 Malmö 26 th -28 th September 2005 ASSTAR is a Specific Targeted.
SESAR and ASAS Opportunity
Civil/Military Users: Whose Airspace is it Anyway? Kim O’Neil Advanced Aviation Technology Ltd. AAT.
1st ASAS-Thematic Network 2 Workshop Malmoe 26th-28 th September 2005 “Implementation planning and future packages” Session Moderator: Giorgio MATRELLA.
6th Framework Programme Thematic Priority Aeronautics and Space.
Regional Cooperation Activity JOINT MEETING OF THE ADVISORY COMMITTEE AND THE EXECUTIVE BOARD Nicosia 17 Jan 2014.
The CASCADE Programme Validation Status and Plans ASAS-TN2 Workshop 3-5 April 2006 Christos Rekkas CASCADE Deputy Programme Manager European Organisation.
Enav.it Channelling Finance and Innovation to Industry Steps towards the Air Traffic Management system modernisation.
The SESAR Definition Phase is co-financed by the European Community and EUROCONTROL Responding to the 2020 Challenge Introduction to SESAR DEFINING THE.
Page Lufthansa ASAS It's Time for a paradigm change... Workshop May 2003, Rome
ASSTAR User Forum #1 Rome 4th April 2006 ASAS-TN2 Second Workshop ASSTAR Safety Approach and Preliminary Issues Dr Giuseppe GRANIERO, SICTA
Clustering ASAS Applications ASAS-TN2 First Workshop, Malmö 26 to 28 September 2005 Fraser McGibbon BAE Systems.
ASAS-TN Second Workshop, 6-8 October 2003, MalmöSlide 1 Airborne Surveillance Applications included in ‘Package I’ Francis Casaux CARE/ASAS manager.
CRISTAL ITP European Organisation for the Safety of Air Navigation CRISTAL ITP ASAS-TN, Paris Johan Martensson CASCADE CRISTAL ITPJohan Martensson ASAS-TN.
CARE/ASAS Validation Framework Guidelines & Case Studies Mark Watson NATS.
ASAS-TN Workshop Glasgow 11 September 2006 Alex Wandels CASCADE Programme Manager EUROCONTROL European Organisation for the Safety of Air Navigation CASCADE.
ASAS TN2 WP3: Assessing ASAS Applications Maturity Eric Hoffman EUROCONTROL.
3rd ASAS TN Workshop 19 April – 21 April rd ASAS TN Workshop Session 4: Strategy and Implementation Package I Requirements Focus Group (“Rapid.
Direction de la Technique et de l’Innovation 23 Mars 2006 ASAS implementation the DSNA views ASAS TN 2 Worshop Session 4: Integrating ASAS in an evolving.
2 nd ASAS-TN2 Workshop - Rome, 4 th April 20061/13 Civil-Military cooperation as a key factor in ASAS implementation Italian Air Force (IAF) Ltc. Maurizio.
- Session 4: Interoperation José M. Roca Air/Ground Cooperative ATS Programme Eurocontrol.
4 th Workshop, Amsterdam, April 2007 G2G project G2G project : ASPA S&M experiments and main validation results Marinella Leone
ASAS WORKSHOP Roma April 2003 Airlines’ perspective Nicolas Zvéguintzoff Assistant Director- Technical / Financial Liaison – Europe.
Projects EMERALD and EMERTA EMERALD WP5 The Specific case of ASAS/ADS-B.
Direction générale de l’Aviation civile centre d’Études de la navigation aérienne First ASAS thematic network workshop The user’s expectations and concerns.
KLM - Operations at Schiphol: how does ASAS fit? ASAS TN2: final seminar, April, Paris E. Kleiboer Sr. Manager Strategy ATM.
Federal Aviation Administration AP23 : a snapshot on Package2 ASAS-TN2 Seminar 14 April Paris By Dragos Tonea, Eurocontrol Roberta Massiah, FAA.
EUROCONTROL European Organisation for the Safety of Air Navigation.
ASAS TN2 Final Seminar Paris, April 2008 Recommendations by the ASAS Thematic Network Ken Carpenter.
April 2003ASAS TN April 2003 Workshop1 ADS Programme ASAS TN Workshop (28-30 Apr ‘03) “Package I Architecture and CBA Activities” Pieter van der.
DIRECTION TECHNIQUE CERTIFICATION Paris, April 2008 SL ASAS TN2 Workshop ppt ASAS & Business.
CARE/ASAS Activity 2 Follow-up: Validation Framework Dissemination Forum Isdefe Ingeniería de Sistemas CARE/ASAS ACTIVITY 2 FOLLOW-UP: VALIDATION.
1 European Organisation for the Safety of Air Navigation Jan Van Doorn Director EUROCONTROL Experimental Centre April 2006 ASAS / ADS-B: Implementation.
1 ILA Berlin - May 2008 Marc Brochard - EEC EPATS ATM General Requirements & relative issues to be solved.
1 Airborne Separation Assistance Systems (ASAS) - Summary of simulations Joint ASAS-TN2/IATA/AEA workshop NLR, Amsterdam, 8 th October 2007 Chris Shaw.
1 September 2005 European Organisation for the Safety of Air Navigation ASAS Thematic Network II First ASAS TN II Workshop Malmo, Sweden.
ENAV S.p.A. 1 AENA / ENAV / DFS / LFV ASAS Thematic Network Workshop Malmoe, ASAS /ADS-B: SAMPLE ANSPs STRATGIES & EXPECTATIONS.
Certification Considerations for the Implementation of ASAS Applications on Aircraft Kevin Hallworth: UK CAA ASAS-TN Seminar – October 2004.
ASAS Crossing and Passing Applications in Radar Airspace (operational concept and operational procedure) Jean-Marc Loscos, Bernard Hasquenoph, Claude Chamayou.
19-21 April 2004ASAS TN – 3 rd workshop AIRLINES/IATA OVERVIEW Needs and Considerations Anthony van der Veldt/IATA Assistant Director Safety Operations.
A consolidated starting point from DFS / AENA / LFV ASAS Thematic Network Workshop Toulouse, Is ASAS /ADS-B needed for ANSP strategy?
MFF is a EC Co-funded Programme  MEDITERRANEAN FREE FLIGHT Flight Trials Report ASAS TN2 1st Workshop | September 2005, Malmö Gennaro GRAZIANO 1/32.
The CASCADE Programme Blueprint for ADS-B Deployment ASAS-TN2 Workshop – Amsterdam April 2007 Christos Rekkas CASCADE Deputy Programme Manager, EUROCONTROL.
4 th Workshop, Amsterdam, April 2007 Progress since 2003 First workshop in 2003 (Rome) Large number of successful R&D projects in US and Europe.
Programme Status ECTL AAB February FACTS  A mature approach: 2500 contributors Release process organises the delivery cycle ATM Engineering:
DIRECTORATE GENERAL FOR ENERGY AND TRANSPORT Information Day 6th Framework Programme 1st Call for Proposals, 5 Feb. 2003, Brussels ASAS operational improvements:
1 Roma, 3-5 April 2006 – ASAS TN2, 2 nd Workshop, Session 1 – When ASAS meets ACAS When ASAS meets ACAS Thierry Arino (Sofréavia, IAPA Project Manager)
1 EUROCONTROL S TRATEGIES FOR The ATM Strategy for the Years As from MATSE/6 decision (Jan. 2000): To cater for forecast increase in demand.
Petros Stratis – BLUE MED Project representative – DCA Cyprus Co-financed by the EU (TEN-T)
ASSTAR Overview Jean-Marc Loscos, DSNA
Chris Shaw, EUROCONTROL Experimental Centre
ASSTAR Oceanic Session Summary
Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner
Chris Shaw, EUROCONTROL Experimental Centre
Karim Zeghal EUROCONTROL Experimental Centre
Presented at ICAO ACP WG-I By Robin Hughes
ASSTAR Project Overview & User Forum Objectives
FAA and JPDO ASAS Activities
Directorate-General Energy and Transport
USER’S EXPECTATIONS AND CONCERNS Aena’s ADS Programme Manager
Presentation transcript:

MFF is a EC co-funded programme Rome, 3-5 Aprili 2006 ASAS-TN2 Rome, 3-5 April 2006 Maurizio Zacchei, ENAV (MFF PM) Mediterranean Free Flight Programme Overview: M. ZACCHEI 1/14

MFF FINAL WORKSHOP Rome, 3-5 April 2006 M. Zacchei 2/14  WHY MFF Where we were ! 6 years ago  Big delays  Disrupted schedules  Industry losing millions If we want an ATM system capable to safely, efficiently and cost effectively satisfy a doubling of traffic by 2020  We can’t do it with conventional thinking  We need a radical change

MFF FINAL WORKSHOP Rome, 3-5 April 2006 M. Zacchei 3/14  MFF Programme - Consortium  MFF is a five-year programme co-funded by the European Commission DG TREN within the TEN-T Framework  Experts from 9 countries with different cultural backgrounds participated in the programme:  ENAV (Italy – Project Management)  AENA (Spain)  DSNA (France)  HCAA (Greece)  LFV (Sweden)  MATS (Malta)  NERL (United Kingdom)  NLR (Netherlands)  EUROCONTROL

MFF FINAL WORKSHOP Rome, 3-5 April 2006 M. Zacchei 4/14  MFF Programme - Overview MFF is a pre-operational programme aimed at defining, testing and validating Free Route (FR) and ASAS applications and procedures within en-route scenarios in Free Flight airspace (FFAS) and Managed Airspace (MAS) as well as the transition between the two In particular, MFF simulations and trials aim to:  Demonstrate the operational capabilities and define relevant procedures for the most promising Free Route and ASAS applications;  Demonstrate and quantify the operational benefits;  Analyse the relevant Human Factors aspects;  Perform evaluations related to the CNS/ATM technologies enabling the introduction of (FR) and ASAS applications in the Mediterranean area;  Define the guidelines and requirements for the implementation of the above applications in suitable areas of the Mediterranean airspace.

MFF FINAL WORKSHOP Rome, 3-5 April 2006 M. Zacchei 5/14  MFF Programme - Organisation Release of end results Validation MFF operational requirements and procedures Simulation Trials - (Integrated ATM simulator prototype) Flight Trials (“Autonomous Aircraft” Platform) Operational Benefits and Safety Case Technological framework - Operational Scenario

MFF FINAL WORKSHOP Rome, 3-5 April 2006 M. Zacchei 6/14  MFF Programme – Operational Scenario  Mediterranean airspace is a transition area between Core Area (high density traffic and good CNS infrastructure) and North African airspace (low density and poor CNS infrastructure)  North African airspace could benefit from an early evolution towards Automatic Dependent Surveillance Broadcast (ADS- B) and Airborne Separation Assurance System (ASAS) operations  A complete ADS-B network to support ASAS operations was provided by ADS- MEDUP programme.

MFF FINAL WORKSHOP Rome, 3-5 April 2006 M. Zacchei 7/14  MFF Programme – MEDUP ADS-B Network

MFF FINAL WORKSHOP Rome, 3-5 April 2006 M. Zacchei 8/14  MFF Programme - Co-operation  Close co-ordination with the military authorities to take onboard the military requirements and constraints while developing the programme Military experts provided support and/or took part in the main experiments performed (e.g. MBS, RTS, Flight Trials)  Participation in the definition of ASAS Package 1  Cross-fertilization from and to parallel related projects (e.g. AFAS, MA-AFAS, CoSpace, CARE_ASAS, NUP, SEAP) and standardisation fora (e.g. Requirements Focus Group) were assured

MFF FINAL WORKSHOP Rome, 3-5 April 2006 M. Zacchei 9/14  ATM Scenario Evolution Today Airspace User Autonomy - Degree of Delegation Future Coordinated Control (GROUND/AIR) Centralised Control (GROUND) Autonomous Aircraft (AIR) ?

MFF FINAL WORKSHOP Rome, 3-5 April 2006 M. Zacchei 10/14  MFF Programme – ASAS Applications  5 ASAS Applications were identified, each of which representing steps towards the implementation of ASAS Self Separation (Free Flight)  This classification allows for a progression of delegation from ground to air of separation assurance responsibility APPLICATIONAIRSPACE FLIGHT PHASE A1 Free RouteMASEn-route A2 Airborne Traffic Situation Awareness MASEn-route & Extended TMA A3 ASAS SpacingMASEn-route & Extended TMA A4 ASAS SeparationMASEn-route A5 ASAS Self Separation (Free Flight) FFASEn-route

MFF FINAL WORKSHOP Rome, 3-5 April 2006 M. Zacchei 11/14  MFF Programme – Results by Application FREE ROUTING ASAS SPACING ASAS SEPARATION DEGREE OF DELEGATION ASAS SELF- SEPARATION Managed Airspace FF Airspace

MFF FINAL WORKSHOP Rome, 3-5 April 2006 M. Zacchei 12/14  MFF Programme – Expected Benefits  Improvement of flight efficiency by allowing the use of preferred trajectories and reducing ATC delays. Analysis shows that quite significant fuel savings will be obtained  Elimination of bottlenecks by establishing new more direct, conflict free routes to\from Europe towards Africa and Middle East  Reduction of ATCOs workload  The use of the MFF programme results as guidance for the deployment of improved and more cost effective CNS/ATM infrastructure/facilities wherever beneficial or necessary, may support economic growth and mobility in the Mediterranean area

MFF FINAL WORKSHOP Rome, 3-5 April 2006 M. Zacchei 13/14  MFF Programme – Validation Activities  9 Model Based Simulations  9 Real Time Simulations  135 hours in aircraft simulators  240 hours of Flight Trials using the MEDUP infrastructure and properly equipped aircraft (transponders plus CDTI with ASAS functions)  Validation was performed by addressing 8 different objectives ranging from pilot and controllers acceptance, safety, military aspects, economic benefits, environmental impact and future capacity gains  VDL Mode 4 proven adequate for ADS-B & TIS-B and compliant with ADS-B requirements

MFF FINAL WORKSHOP Rome, 3-5 April 2006 M. Zacchei 14/14  MFF Programme – The Way Forward  MFF validated main ASAS applications whose implementation ranges from mid to long term (Free Flight)  MFF results are expected to provide significant contribution to the definition phase of the SESAR Programme with special focus on ADS-B/ASAS  The participation of several Mediterranean ANSPs in MFF paved the way to ADS-B/ASAS buy-in