1 May run: Beamline Configuration. Some preliminary thoughts. K.Tilley, 24/04/08.

Slides:



Advertisements
Similar presentations
1 MICE Beamline: Plans for initial commissioning. Kevin Tilley, 16 th November. - 75days until commissioning Target, detectors, particle production Upstream.
Advertisements

K. Long, 18 April, 2015 Beam-line status — red sky at night?
Entrepreneurs. What is an Entrepreneur? An entrepreneur is someone who: Comes up with a good idea for a business Organises all the elements needed for.
MICE Beam Loss vs Particle Rate Adam Dobbs, ISIS Meeting, 18 th December 2009.
MOM report 23/9 – 28/9 G.CECCHET. MOM report Hall PPS commissioning Target tests last night MOM laptop.
MICE Beam-line and Detectors Status Report 16 th October 2009 Chris Booth The University of Sheffield.
MICE Particle Rate and ISIS Beam Loss Adam Dobbs, Target – ISIS Meeting, 17 th September 2010.
Particle ID in the MICE Beamline MICE Collaboration Meeting 30 March Paul Soler, Kenny Walaron University of Glasgow and Rutherford Appleton Laboratory.
MICO Alain Blondel 17 March MICO Alain Blondel 17 March MICE target test-run March 2008 Friday 14/03/2008 6:00-> 18:00 Saturday 15/03/2008.
Changing the absorbers: how does it fit in the MICE experimental programme? Besides the requirement that the amount of multiple scattering material be.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 21 September, 2009.
Linda R. Coney – 24th September 2009 MOM Update End of Sept Run Linda R. Coney 05 October, 2009.
Beam line summary paul drumm for beam line group.
Luminosity Monitor Commissioning MICE Collaboration Meeting March 2010 Paul Soler, David Forrest Danielle MacLennan.
M.apollonioMICE Funding Agency Committee Meeting - RAL 18/4/ M. Apollonio – MICE Operations Manager University of Oxford MICE beam line commissioning.
K.Walaron Fermilab, Batavia, Chicago 12/6/ Simulation and performance of beamline K.Walaron T.J. Roberts.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 14 September, 2009.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 12, 2010.
MOM - M.ApollonioMICO meeting - RAL - 17/3/20081 NEXT steps + proposed aims Today - START Cherenkov INSTALLATION (?) Tuesday 25 MARCH - MICO Meeting (?
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
MICE analysis meeting Alain Blondel 5 August MICE -- what running strategy? disclaimer: of course we will evolve the running strategy as problems.
Paul drumm, mutac jan K. Tilley, MICE-VC, 10/05/07 Status of Beamline Design / Commissioning MICE-VC.
MICE Experiments Introduction Introduction Disclaimers Disclaimers Assumptions Assumptions Baseline programme Baseline programme Full programme Full programme.
1June 1 st 2009MICE CM24 - RAL1 MICE Beamline m. apollonio.
MICO 8 th February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - Problems and Issues.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 19, 2010.
Commissioning needs: K.Long. Routine: LN2 bottle: –Needs to be sited in MICE Hall or outside vault so that routine checks of contents can be made.
The MICE beam line status a)Muon BL: P=208 MeV/c, emi_N= 7 mm rad “... the mother of all the beamlines “ b)Proton BL: derived from (a) by rescaling magnet.
1 MICE Beamline Design: General principles & expected capabilities Kevin Tilley, 16 th November Charge to beamline & desirable beam General principles.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 7 September, 2009.
The MICE beam line status a)Muon BL: P=208 MeV/c, emi_N= 7 mm rad “... the mother of all the beamlines “ b)Proton BL: derived from (a) by rescaling magnet.
May 12, 2004 TJR1 Effects of Upstream ParticleID Counters on MICE Good-Mu+ Rates Tom Roberts Illinois Institute of Technology May 12, 2004.
MICE magnetic measurements Sequence of events and MICE hall movements Alain Blondel – 10-April 2012 revision from 13 December 2012.
MICE Video meeting Alain Blondel 7 December MICE -- what running strategy? reflections on steps I and II.
MICE CM18 RAL Alain Blondel 14 June MICE run plan -- steps I and II 1.Establishing the detailed run plan will be one of the mission of the MICE.
(+) session, PAC09 Vancouver – TH6PFP056 Introduction The Muon Ionisation Cooling Experiment (MICE, fig. 1c) at RAL[1]
MICE Beamline Commissioning Linda R. Coney NFMCC Meeting 16 January 2010.
Multiply Decimals 1.Multiply as with whole numbers. 2.Count the total numbers in decimal place value for both factors 3.Place as many numbers of your FINAL.
MICE Preparations for CM18 Michael S. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Video Conference April 12,
MICE Beam-line and Detectors Status Report 16 th October 2009 Chris Booth The University of Sheffield.
Draft HPS Run Plan March 30, Next Steps Beamline Setup Trigger Commissioning Beam Stability Studies SVT Commissioning Data Taking Checking the.
M. apollonio MICE Beamline summary. - Beamline parallel session (June 1 st ): - envisaged goals (Alain) - assess readiness of the line magnet status (Ken)
1 Beamline 1. Beamline Target/Misalignment problem 2. Magnet measurements 3. Everything that’ critical and outstanding – eg d/str beamline monitors final.
Beam line commissioning Preparations for Phase1 Kevin Tilley For Paul Drumm & the beam line group.
Plans (& ideas) for beamline commissioning The beamline Magnet field tests Source characterisation Optics (& model) commissioning K. Tilley CM18, 14/06/07.
Particle Production in the MICE Beamline IPAC10 Linda Coney, UC Riverside, Adam Dobbs, Imperial College London, Yordan Karadzhov, Sofia University The.
Linda R. Coney – 24th September 2009 MOM Update Linda R. Coney 24 September, 2009.
Curtis A. Meyer 20 May, 2004 GlueX Detector Infrastructure The issue of infrastructure includes details of how we assemble the detector as a whole. How.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
Alain Blondel MICE VC 12 March 2009 Brief MICE news 1. Decay solenoid: operations will restart in early July. Criteria for acceptance have been specified.
Paul drumm, mutac jan Precursor: - Resources since cm16. Beamline Review Response. Optics related work: the major threads: -Current (ε,p) status.
MICE Run Plan Sept/Oct 2009 m. apollonio – IC MACHINE PHYSICS USERs RUN NO SHIFT A B C D E.
March 18, 2008 TJRMICE Beamline Status1 MICE Beamline Status (March 18, 2008) Tom Roberts Muons, Inc. Illinois Institute of Technology.
3 June 2009J. H. Cobb 1 ANALYSIS SUMMARY CM24 Agenda for Analysis parallel session at CM Sunday 31 May 14:00.
Running plan Step I.1 Basic radiation levels. I.1.1 ISIS running with beam elements on, target off, beam stop shut. Establish permanent MICE monitoring.
Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
1 Beamline Work. Optics:- Simulation debugging (then redesign..) Commissioning Hardware:- Dipole B1 beampipe installation issue Further magnet measurements.
1 Light Yield results from the KEK tracker test using G4MICE M. Ellis Tracker Phone Meeting 25 th January 2006.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICE Video Conference May 20, 2010.
1 Updated Run Plans. K.Tilley, MICO, 07/02/08 - pre-commissioning - Target, - beamline functionality - detectors, particle production - decay solenoid.
M. apollonio 7/7/2010CM27 - RAL11 Beam-Line Analysis …
ApEx needs for CeC PoP Experiment December 11, 2015.
Paul drumm, mutac jan Status of Muon Beamline design work Kevin Tilley, RAL, 9th Feb Including Beamline Materials in new revision Reference ('True')
MICE. Outline Experimental methods and goals Beam line Diagnostics – In HEP parlance – the detectors Magnet system 2MICE Optics Review January 14, 2016.
1 1 Optics related work: the major threads: -Current (ε,p) status - G4BL/TTL Simulation comparisons - Beam steering/correction -Collimation d/stream &
MICE. Outline Experimental methods and goals Beam line Diagnostics – In HEP parlance – the detectors Magnet system 2MICE Optics Review January 14, 2016.
MICE Beamline Status m. apollonio 17 December 2009 MICE VC
MICE Operations Scenario Run 1
Validating Magnets Using Beam
How to turn on MICE Step IV
Presentation transcript:

1 May run: Beamline Configuration. Some preliminary thoughts. K.Tilley, 24/04/08

2 -Pre-commissioning : - full magnet system checks again Q1-3 - dry checks on solenoid especially polarity. - personally I would like to check remote control (with Amps not pps) & polarity finally in all magnets again.

3 What we have achieved already: - Target ‘proven’ - Dipole beamline ‘proven’. - Protons on target ‘estimated’ for 50mV. - May Beamline General idea:- -Continue with - outstanding work from previous shifts & - some control/optics commissioning. -Given O( stick with protons initially for S/N - implies keep same magnet polarities. - implies don’t use proton absorber in May.

4 Outline steps:- Building from 3 docs:- Feb15th ProtonRunPlan, March 27th Run Ideas, April 4th Shift plan Use “D1=400A,D2=170A basic setting”. - Production versus dip / beamloss. (D1=D2 only) - Vertical target/beamline misalignment measurement trial. - set at optically aligned if possible. - Q1,2,3 individually. - choice to set at triplet design value. - Solenoid –with or without Q1-3 on. - Q4,5,6 - Q7,8,9 - Setup whole beamline with alignment.

5 Some obvious needs:- - New proton optic using solenoid. [probably scaling of standard pion/muon line] - Clarity over whether TOF0 or not will be in place for downstream optics. Can BM1 & TOF0 share space? - Really need (BC/BM) ie. IC/FNAL monitors giving reliable beamsize/position information for May. - To move BM2 to after Q9 for Q7,8,9 running. Desirable:-- Very desirable to have TTL model of beamline – [or someone who knows how to interpret/run misalignments in G4BL] - estimate of position of target in absolute terms.