Proposal for Water Constellation FS - Draft - 14 Sep 2015 Chu Ishida JAXA 1.

Slides:



Advertisements
Similar presentations
1 CEOS/WGISS-20 JAXA Status Report September 16, 2005 Kyiv, Ukraine Satoko Horiyama MIURA / JAXA Hurricane KATRINA :23-03:27 (UTC) A Horizontal.
Advertisements

World Meteorological Organization Working together in weather, climate and water WMO OMM WMO Dr B. Bizzarri, Consultant WMO Space Programme.
Makoto Kajii SIT Chair 2010 – th Annual Report on CEOS Implementation of the GEOSS Space Segment Agenda Item accomplishments and lessons.
The CEOS Constellations Status and Way Forward SIT September 2006.
Introduction to Breakout Session 2.2 Essential Variables for GEO SBAs (Chair: Antonio Bombelli) Coordinator of the GEO Task CL-02 “Global Carbon Observations.
Proposal for Data Applications Report Chu Ishida JAXA CEOS Plenary, Agenda Item 24 Tromsø, Norway October 2014.
Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Agenda Item: 15 Chu ISHIDA(JAXA) on behalf of Rick Lawford, GEO Water CoP leader GEO Water.
WGClimate Work Plan for John Bates, Chair WGClimate 4th Working Group on Climate Meeting.
CEOS-CGMS Working Group on Climate John Bates, NOAA SIT-30 Agenda Item #11 Climate Monitoring, Research, and Services 30 th CEOS SIT Meeting CNES Headquarters,
JAXA Priorities and Expected Outcomes for 2015 Shizuo YAMAMOTO, JAXA CEOS Plenary, Agenda Item 40 Tromsø, Norway October 2014.
Committee on Earth Observation Satellites John Bates Chair, Joint CEOS-CGMS Working Group on Climate 3 rd WCRP Data Advisory Committee.
CEOS Systems Engineering Office (SEO) Report Brian Killough, CEOS SEO, NASA Agenda Item # rd CEOS Plenary I Phuket, Thailand I 3-5 November 2009.
CEOS SIT-28 Introduction of the Agenda, Overall Objectives, and Essential Business Topics Hampton, Virginia, USA March 12-14, 2013.
IGOS-P Water Theme The 8 th GISP Meeting November 2003 Khon Kaen, Thailand Kenji Nakamura Nagoya Univ. JAXA.
28 th CEOS Plenary Session John Bates NOAA CEOS Plenary, Agenda Item 13 Tromsø, Norway October 2014.
Slide # 1 “Task-level GEOSS Roadmap” Chu Ishida, JAXA Yoichi Nakamura, Mitsubishi Research Institute, Inc. Feb. 6-7, 2008 ADC Full Committee Meeting #6.
WGClimate John Bates NOAA SIT Workshop Agenda Item #8 WGClimate Work Plan progress & Issues CEOS SIT Technical Workshop CNES, Montpellier, France 17 th.
CEOS Special Report on Data Applications Sep 16, 2014 JAXA.
CEOS Response to the GEOSS Water Strategy Report Nobuyoshi Fujimoto, Chu Ishida, Kerry Sawyer and Richard Lawford JAXA and CEOS SIT Workshop Agenda Item.
Slide: 1 Osamu Ochiai Water SBA Coordinator The GEO Water Strategy Report – The CEOS Contribution Presentation to the 26 th CEOS Plenary at Bengaluru,
Water Strategy Implementation Study Team Report Chu Ishida JAXA SIT Workshop Agenda Item # CEOS Action / Work Plan Reference CEOS SIT Technical Workshop.
CEOS Priorities for 2013 Agenda 3 Kerry Ann Sawyer CEOS Executive Officer CEOS SIT-28 Meeting Hampton, Virginia, USA 12 March 2013.
GEO ADC meeting, Washington DC, USA, Sep Slide # 1 DA DA Virtual Constellations Ivan Petiteville, CEOS GEO ADC Meeting, Washington DC,
CEOS-CGMS Working Group on Climate John Bates NOAA/NESDIS/NCEI SIT Workshop Agenda Item 7 CEOS Action / Work Plan Reference CEOS SIT Technical Workshop.
WGISS and GEO Activities Kathy Fontaine NASA March 13, 2007 eGY Boulder, CO.
Water Strategy Implementation Study Team Report Chu Ishida JAXA SIT Workshop Agenda 11 CEOS SIT Technical Workshop EUMETSAT, Darmstadt, Germany 17 th –
WGISS Response to CEOS Actions Assigned to WGISS Richard Moreno CNES – WGISS chair WGISS-40 Harwell – United Kingdom 28 th September 2015 Committee on.
Committee on Earth Observation Satellites JAXA (Japan aerospace Exploration Agency) Plenary Agenda Item 2 29 th CEOS Plenary Kyoto International Conference.
Committee on Earth Observation Satellites SIT Chair, Brian Killough Plenary Agenda Item #12 29 th CEOS Plenary Kyoto International Conference Center Kyoto,
Committee on Earth Observation Satellites Chu Ishida, JAXA Plenary Agenda Item th CEOS Plenary Kyoto International Conference Center Kyoto, Japan.
CGMS-42 CEOS-CGMS WP-01 V1, 11 May 2014 Coordination Group for Meteorological Satellites - CGMS Status report by the CEOS-CGMS Joint Working Group on Climate.
Kyoto Plenary Preparation [Information] JAXA SIT-30 Agenda Item 17 CNES Headquarters, Paris, France 31 st March – 1 st April 2015 Committee on Earth Observation.
Committee on Earth Observation Satellites John Bates, NOAA Plenary Agenda Item 8 29 th CEOS Plenary Kyoto International Conference Center Kyoto, Japan.
Committee on Earth Observation Satellites Robert Husband & John Dwyer Gap Analysis.
Report on SBSTA-43 John Bates NOAA, National Centers for Environmental Information (NCEI) NOAA/NESDIS 6th Working Group on Climate Meeting.
Committee on Earth Observation Satellites CEO Team Plenary Agenda Item #4 29 th CEOS Plenary Kyoto International Conference Center Kyoto, Japan 5 – 6 November.
Status of Plenary Actions CEO Team CEOS Plenary 2016 Agenda Item #1.3 Brisbane, Australia 1 st – 2 nd November 2016 Committee on Earth Observation Satellites.
CEOS Response to GEOSS Water Strategy
13th Annual IGWCO Meeting
The GEOSS Water Strategy
Water Constellation Feasibility Study
GEOSS Water Strategy Actions
CEOS Water Strategy - Progress report to SIT 31 -
WSIST Water Contellation FS report
IGWCO CoP Overview Richard Lawford
Title Goes Here Name (s), Organization, CEOS Affiliation CEOS SIT-33
WSIST Water Contellation FS report
Selected GEOGLOWS responses to the GEOSS Water Strategy
SIT-27 DECISIONS & ACTIONS IN SUPPORT OF GEO-GLAM
Session 2 The New MDG Framework
Title Goes Here Name (s), Organization, CEOS Affiliation CEOS SIT-33
29th CEOS Plenary Priorities
Precipitation Virtual Constellation (P-VC)
CEOS SIT Chair Priorities
2016 Plenary Themes Alex Held, CSIRO
SIT Chair Term Themes and SIT Objectives
WGISS Working Group for Information Systems & Services
Committee on Earth Observation Satellites
Workshop outcomes from the CEOS perspective
Discussion Virtual Constellations
Implementation Update
CEOS Virtual Constellations Process Paper
IGWCO CoP and “Cross-over Issues”
SIT-31 Sessions CEOS SIT Chair Team ESA/ESRIN, Frascati, Italy
SIT Chair Priorities and SIT-34 Objectives
VC Title Goes Here Name (s), Organization, CEOS Affiliation
WG Title Goes Here Name (s), Organization, CEOS Affiliation
Freshwater from Space Discussion -Next Steps
CEOS Working Group on Climate (WGClimate)
Precipitation Virtual Constellation
Presentation transcript:

Proposal for Water Constellation FS - Draft - 14 Sep 2015 Chu Ishida JAXA 1

Water Constellation FS FS objectives – Respond to GEOSS Water Strategy recommendation C1 – Validate CEOS mission coordination cycle (from user requirement definition to end use verification) which was indicated by CEOS Chair at CEOS Plenary, Oslo, Oct

Proposed Methodology Define six priority water parameters, i.e. precipitation, soil moisture, evapotranspiration, groundwater, river discharge, water storage Define user requirements for each parameter - work with IGWCO to see if there are any user requirements defined for each parameters, including GCOS ECV and IGWCO EWV requirements Compare and analyze current observation capabilities with the user requirements for full CEOS mission coordination cycle (value chain analysis) 3

Exampl 1 - Gap Analysis (Precipitation) VariablesRequirementsCapabilityGap Accuracy0.5 mm/h0.2 mm/h horizontal resolution 1 km (TBC)5 km vertical resolution250 m (TBC)500 m Observation frequency 3 hour Data latency1 hour (TBC)TBC 4

Value Chain and Gap Analysis 5 Requirement Capability gap analysis Requirement 2 Capability 2 gap analysis 2

Example 2 - Value Chain-Gap Analysis (Precipitation) RequirementsCapabilityGap Satellite Data provider NASA/JAXA Service provider NASA/JAXA Met. agency ICHARM, etc. End user citizen local gov, industry Developing countries researchers Benefits 6

User Requirements Precipitation – make maximum use of VC-P work on post-GPM study Soil moisture- any user requirements ? If not, use ECV as first step Evapotranspiration (ET)- use EWV as first step Groundwater – use EWV requirements. Are GRACE-II user requirements available ? River discharge- use ECV requirements IGWCO’s assistance to find end users and to define user requirements will be very much appreciated. 7

Challenge We may be able to make gap analysis for six parameters. But, further consideration on how to synthesize these separate studies as water constellation will be necessary. IGWCO’s offer to support synthesis analysis of the FS is highly appreciated. 8

Proposed Schedule Sep – discuss FS idea and propose way forward to SIT TWS with a very preliminary FS outcome and propose one-year extension of WSIST for the FS Nov – report of WSIST and seek approval on one year extension of WSIST at the CEOS Plenary in Kyoto 9