RD’s Report on Detector Activity General Overview Project Advisory Sakue Yamada December 14, 2012 Sakue Yamada.

Slides:



Advertisements
Similar presentations
CLIC-ILC collaborations on detectors F. Richard LAL/Orsay PAC Valencia May
Advertisements

Signing LOI for ILD detector concept at ILC Deadline LOI submits march 31st 2009.
ILD Resource Survey 2014/9/9 Y. Sugimoto 1. Committee under MEXT ILC Task Force in MEXT Academic experts committee Particle-Nuclear physics WG Members.
SIXTH MEETING OF THE ILC PROJECT ADVISORY COMMITTEE (PAC) 19/20 May 2011; Institute of Physics, Academia Sinica, Taipei, Taiwan 1.
ILCSC Report KILC12 / Daegu Jonathan Bagger Chair, ILCSC Johns Hopkins University 4/23/12.
After ISS Where Do We Go From Here?. 21 August 2006P Dornan - After ISS2 Next - until the end of 2006  Produce the ISS Report - with the present team.
Beyond the ALCPG David B. MacFarlane Associate Laboratory Director for PPA.
6-Nov-06 FALC Resource Board Global Design Effort 1 Report from the GDE Barry Barish Caltech / GDE 6-Nov-06.
Slides for Project Review 15 Dec ILD Future Colliders ILC, ILC-CLIC & Detectors ILD  VTX,LCTPC,CALICE.
RD’s Report (update since LCWS08 in Chicago) 2009/4/171TILC09 S.Yamada Sakue Yamada April Tsukuba.
RD’s Report on the status of physics/detector activities ILD Sakue Yamada May 23, 2012 Sakue Yamada.
 k0k0 ++ -- -- p ILC Technical Design Report Physics and Detectors – Detailed Baseline Design Juan A. Fuster Verdú, IFIC-Valencia PAC Meeting, KEK.
Software Common Task Group Report Akiya Miyamoto KEK ALCPG09 30 September 2009.
Charge to the SiD Workshop Andy White University of Texas at Arlington.
MEXT Review Process in Japan 2014/7/16 Y. Sugimoto 1.
Report from Physics and Detectors Sakue Yamada Beijing March 26, 2010 The activity of the two detector groups IDAG monitoring Common Task groups.
Charge to the Workshop (and a report from WWS) Hitoshi Yamamoto July 11, 2005 ACFA8, Daegu, Korea.
F. Richard LAL/Orsay CLIC-ILC connections on Detectors PAC Paris meeting October 20, 2008.
1 1 LCC Physics and Detector Hitoshi Yamamoto ILD WS, Kracow Sep 24, 2013.
RD’s Report Sakue Yamada Aug. 24, 2011 Institute Mumbai 2011/8/241Sakue ILCSC, Mumbai.
21 August 2006P Dornan - After ISS1 Discussion  NuFact Talks Comments  Report 1 st Draft Oct – 60 Pages per WG Finalise before end of the year.
LCC Physics&Detector Report Hitoshi Yamamoto SiD Meeting Jan,
Our mandate has been completed The physics and detector perspective of the ILC-TDR Sakue Yamada May 27, /05/271Sakue Yamada ECFA.
27-March-10 LCWS10 - Beijing Global Design Effort 1 Barry Barish LCWS10 - Beijing 27-March-10 “Cost Containment” for the TDR.
1 1 LCC Physics and Detector Hitoshi Yamamoto ECFA LC2013, DESY May 27, 2013.
ACFA Summary Akiya Miyamoto, KEK KILC12 26 April, 2012.
Status of ILC detector/physics activity Sakue Yamada Apr. 24, /4/241Sakue
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
ILC DBD Common simulation and software tools Akiya Miyamoto KEK ILC PAC 14 December 2012 at KEK.
Status of the ILC Detector activities Project Advisory Committee October 20, 2008 LPNHE,Paris Sakue Yamada 1.
Report from ILCSC Shin-ichi Kurokawa KEK ILCSC Chair GDE meeting at Frascati December 7, 2005.
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
Status Report on ILC Project in Japan Seiichi SHIMASAKI Director, Office for Particle and Nuclear Research Promotion June 19, 2015.
General news, future LC organisation, update on CDR Vol3… Lucie Linssen L. Linssen, CLIC physics and detector monthly meeting, May 14th
WWSWWS The WWS Roadmap for ILC Detectors by F. Richard LAL/Orsay.
WWSWWS Report of the World Wide Study J. Brau June 4, 2008 Dubna ILCSC Meeting.
Recent Development of Detector Activities for ILC CCAST07 Nov Introduction Call for LOI & mechanism of selection IDAG Benchmarks Common.
SPC Advisory Committee Training - TAC Fall 2015 Institutional Research President’s Office 1 Abridged from the SPC Advisory Committee Training on October.
Software Common Task Group Report Akiya Miyamoto ILC PAC POSTECH 3 November 2009.
J. Brau SiD Workshop (RAL) April 14, Recent Developments on Global Detector Coordination.
Plan to go forward Peter Wilson SBN Program Coordinator 27 September 2014.
Introduction to the seminar ILC Detectors: Status and Prospects Akiya Miyamoto KEK IPNS 18 July
RD’s Report Sakue Yamada May 23, /05/231 Sakue
Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.
ILC communication InterAction Collaboration 14 July 2011 Leah Hesla ILC communication at InterAction Collaboration meeting.
Detector Cooperation with CLIC PAC Pohang meeting November 3, 2009 F. Richard LAL/Orsay 11/03/20091.
CLIC - CDR Status (Volume 2) Hermann Schmickler, ILCW2010.
ILD meeting Thursday May 30, 2013 Ties Behnke, Yasuhiro Sugimoto.
24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort.
ECFA - European Commitee for Future Accelerators Tatsuya Nakada – EPFL, Switzerland– prepared for CERN September Council presented by.
Report from SB2009 Working Group Akiya Miyamoto 8-July-2010 DESY ILD Software and Integration Workshop.
Global Design Effort Progress and Plans of the Beam Delivery Systems and Machine Detector Interface WG Daniel Schulte (CERN), Brett Parker (BNL), Andrei.
RD’s Report SiD Group Sakue Yamada December 14, 2011 (remote participation) 2011/12/141SiD-meeting Sakue Yamada.
The ILC Outlook Barry Barish HEP 2005 Joint ECFA-EPS Lisbon, Portugal 23-July-05.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
K. Long, 25 June, 2016 IDR: structure and overall timeline: Slides are to introduce discussion of how we prepare IDR. Propose to revise slides as we discuss.
The SiD LOI Proposed Milestones and Schedules SiD Collaboration Phone Meeting September 6, 2007 John Jaros.
Relations with concept groups
Brief summary of discussion at LCWS2010 and draft short term plan
Strategy Ties Behnke
PDAP Junji Haba, KEK.
What Is Next for SiD ? H.Weerts Argonne Nat. lab..
Introduction to the Workshop
Computing in ILC Contents: ILC Project Software for ILC
Sakue Yamada March 19, 2011 RD’s Report Sakue Yamada March 19, /03/19 Sakue
Technical Design Report preparation
The DBD: Outline and Scope
Report from ICFA ICFA mission and membership ICFA Panels ICFA and ILC
Update of the Detector Program for ILC Sakue Yamada March
Project Plan Template (Help text appears in cursive on slides and in the notes field)
Presentation transcript:

RD’s Report on Detector Activity General Overview Project Advisory Sakue Yamada December 14, 2012 Sakue Yamada

Contents Time line of the LOI process Overview of the submitted DBD Post 2012 stage for physics/detector Sakue Yamada2

Oct. 2007: Call for LOIs was made by ILCSC appointment of RD to conduct the process Jan. 2008: Detector management was formed Mar.2008: IDAG formed, 3 LOI groups known Mar.2009: 3 LOIs submitted Summer 09: IDAG recommendation for validation and ILCSC’s approval Oct 2009: Work plan of the validated groups End 2011: Interim Report October 2012: DBD draft reviewed by IDAG December 2012: PAC review End 2012: Detailed Baseline Design Report RDR Sakue Yamada The time line of the LOI process

Milestones till draft completion Format WG started December, last year. 2 from each group + management Monitoring of the planned contents by IDAG During KILC12 in Daegu, Korea, Last April Some rearrangement Review of the first draft by IDAG The entire draft was submitted end Sept. IDAG met during LCWS12, in Arlington, last October Each author group was interviewed by IDAG Submission to PAC after polishing end November Sakue Yamada4

The review by IDAG IDAG validated the LOIs, and has watched all the activities through the entire process to give us advices. We owe much to IDAG for the accomplishment. Formally IDAG gives advices to the RD. In that sense, the DBD monitoring or review was an internal review. Nevertheless, the IDAG members are experienced physicists mostly from outside of ILC community; IDAG is informed of every detail of the progress of the groups and the DBD contents. IDAG is the ideal body to review the DBD with PAC. Sakue Yamada5

DBD presents our achievements We believe we have reached the expected goal of the LOI process. In the DBD: The case of ILC physics could be presented. The feasibility of the detectors and software technologies could be proven. The capability of the detectors to accomplish aimed physics was demonstrated. For the last point, good communication with the GDE teams was crucial and was kept. e.g. IR design,Push-pull issues, SB2009, beam parameters/b.g. Sakue Yamada6

Remarks on the achievements The completed drafts are a result of the efforts of very many people during the LOI period. The LOI process provided a framework to coordinate the efforts of the community. The management did not provide any budget for R&D. The participating groups worked for their budget themselves and there were difficult moments. This report is a symbol of the strong desire and will of the community for ILC, which we relied upon and appreciate much. Sakue Yamada7

DBD volumes Sakue Yamada8 There are 2 volumes. These volumes will make a part of TDR TDR Volume 1: Physics (220 pages) physics case for ILC TDR Volume 3: Detailed Baseline Designs (500 pages) Detector designs and performance of SiD and ILD, and common matters

Physics volume All the considerable physics topics are summarized. They include: Precise measurements on the Higgs particle at different energies, Identification of the newly discovered 125GeV Higgs boson-like particle, Possible deviations from the SM Higgs case, And many others for the possible future directions. Details will be presented by M. Peskin. Sakue Yamada9

Physics and Detector, DBD, volume Introduction chapter Physics summary and general items for ILC experiments (e.g. required detector performance, beam backgrounds) (J. Fuster ) Common chapter Common activities or matters to the both groups (Det. component R&D, MDI issues/beam instrumentations, Eng. Tool, Simulation Tool) (W. Lohmann, K. Buesser, C. Clerc, A. Miyamoto) Sakue Yamada10

Detector chapters, SiD and ILD These are the main part of the volume with ~190 pages each. Concept, design, component R&D (feasibility), integration, software, performance (benchmark simulation), cost estimation (These are result of advanced R&D, of little engineering study. I.e. some items for integration or cost estimation depend on the engineering studies or site are left for future studies.) SiD by M. Stanitzki, T. Barklow, ILD by Y. Sugimoto Sakue Yamada11

Summary and Future chapter Summary The both ILC detectors, SiD and ILD, are feasible and capable to provide the physics aims with good accuracy under the push-pull operation and with the expected accelerator performance. Sakue Yamada12

Summary and Future chapter Future: We are still in the R&D phase. The R&D will continue until the groups freeze their design. It is important for better performance or cost reduction. This is the common part with CLIC detector activity. Engineering studies need to be enhanced toward construction phase. More over we wish the project advances toward realization with the completed TDR. Sakue Yamada13

Post 2012 program We have come to the goal of the LOI process. It is strongly desired to define the next objectives of the activity in concrete as soon as possible. We, the RD, will hand the completed report to ILCSC next February, finishing the final polishing, and complete the mandate except printing the report. The concept groups wish to continue R&D and include engineering studies toward project realization. How to organize this and to secure resources for these works is a critical issue now. Sakue Yamada14

Summary We have completed the DBD draft, which presents the physics cases of ILC, feasibility and capability of the designed detectors. It requires some more work to be the final document to be handed to ILCSC. The community made big contribution for this accomplishment and wish to step forward to the next stage toward ILC realization. Sakue Yamada15