Information Architecture WG: Report of the Fall 2010 Meeting October 29, 2010 Dan Crichton, Chair Steve Hughes (presenting) NASA/JPL.

Slides:



Advertisements
Similar presentations
05-October-2007 Heppenheim,DLR AD-initial - 1 MOIMS AREA: IPR STATUS REPORT, Louis Reich IPR WG Chairman Joint IPR/DAI Workshop 05 October 2007.
Advertisements

09-Dec Toulouse,FR AD-initial - 1 MOIMS AREA: IPR STATUS REPORT, END of Sprint 2006 Meeting Louis Reich IPR WG Chairman Joint IPR/DAI Workshop 20.
SGIA-BOF-kickoff.ppt - CCSDS SGIA - Space to Ground Interoperability Architecture (SGIA) Birds of a Feather (BOF) Out Brief September 16, 2005 Clayton.
November SLS RFM and RNG REPORT 18 November 2004.
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/SPARTA (a Parsons Company) October.
Security WG: Report of the Winter 2007 Meeting Colorado Springs, CO USA January 20, 2007 Howard Weiss NASA/JPL/SPARTA
Security WG: Report of the Spring 2015 Meeting Caltech, Pasadena CA USA 27 March 2015 Howard Weiss NASA/JPL/PARSONS
Sep 2003 CCSDS Navigation WG Progress Report MOIMS Meeting Oct 2003 CSC, Maryland, USA Felipe Flores-Amaya CCSDS Navigation WG.
1 CCSDS Information Architecture Working Group SEA Plenary Daniel J. Crichton, Chair NASA/JPL 12 September 2005.
ESTEC, Noordwijk, Netherlands 27 Oct 2009 SERVICE ARCHITECTURE FOR SPACE -- BOF 1.
10-Dec-2012-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
Cesg-1 CCSDS Engineering Steering Group: Report to the CCSDS Management Council (CMC) and Interagency Operations Advisory Group (IOAG): Fall 2010 BSI,
1 26 October 2005 Space Internetworking Services Report to the CCSDS Management Council 26 October 2005 R. Durst, D. Stanton.
Delta-DOR SIG: Report of the Fall 2007 Meeting Heppenheim, Germany October 5th, 2007 Roberto Maddè ESA/ESOC
1 Space Communications Cross Support Architecture WG: Charter and Work Plan October 2010 London, UK Takahiro Yamada, JAXA/ISAS.
PS 1 12 June 2006 SEA Opening Plenary Rome, Italy, 12 June 2006.
Information Architecture WG: Report of the Winter 2007 Meeting January 20, 2007 Dan Crichton, Chair NASA/JPL.
26 October2005 Reston, VA, USA 1 MOIMS AREA: STATUS REPORT, End of Spring 2005 Meeting N. Peccia ESA R. Thompson BNSC 26 October
Ajh January 2007 CCSDS “Books” Adrian J. Hooke CMC Meeting, Colorado Springs 26 January 2007.
Security WG: Report of the Fall 2008 Meeting DIN, Berlin Germany October 17, 2008 Howard Weiss NASA/JPL/SPARTA
Cesg-1 CSS Area Report -- Super BOF Background From A. Hooke to CESG: (CSS AD emphasis ) Date: Fri 02 Oct 2009 To: CESG cc: CMC Subject: Proposed.
November MOIMS AREA PLENARY NAVIGATION WG REPORT November 2004 CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS.
1 CCSDS Information Architecture Working Group Daniel J. Crichton, Chair NASA/JPL 14 September 2005.
IPR WG REPORT November Information Packaging and Registries WG REPORT November 2004.
10-Dec-2012-cesg-1 Keith Scott (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA REPORT.
PS 1 26 October 2005 SEA Area Report Reston, VA, USA, 26 October 2005.
May 2004 CCSDS Navigation WG Activity Report CCSDS Spring Series May 2004 CSA, Montreal, Canada Felipe Flores-Amaya CCSDS Navigation WG.
Security WG: Report of the Spring 2005 Meeting April 14, 2004 Howard Weiss.
Information Architecture WG: Report of the Spring 2004 Meeting May 13, 2004 Dan Crichton, NASA/JPL.
Cesg-1 22 October 2008 Bob Durst (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA.
NASA/NSSDC Report to MOIMS DAI/IPR Plenary 16 January 2007 Colorado Springs, USA.
Delta-DOR WG: Report of the Spring 2010 Meeting Portsmouth, VA, USA May 7 th, 2010 Roberto Maddè ESA/ESOC,
MOIMS Area Report N. Peccia ESA R. ThompsonBNSC. MOIMS Reportp. 2CESG-CMC Meeting 23 / 24 Jan 2007 Attendance to the MOIMS Meetings Diversity FactorSM&C6.
PS 1 24 Jan 2007 SEA CMC/CESG REPORT Colorado Springs, CO, USA, 24 January 2007.
Information Architecture WG: Report of the Spring 2006 Meeting June 16, 2006 Dan Crichton, Chair NASA/JPL.
1 24 January 2007 SIS Report to CESG/CMC 24 January 2007 R. Durst, D. Stanton.
Information Architecture WG: Report of the Fall 2005 Meeting September 16, 2005 Dan Crichton, Chair NASA/JPL.
SEA-1 20 Nov 2014 CCSDS System Engineering Area (SEA): System Architecture WG (SAWG) Restart Peter Shames, SEA AD 20 Nov 2014.
Navigation WG Report D. Berry NASA J. Fertig ESA.
Security WG: Report of the Spring 2010 Meeting Renaissance Hotel Portsmouth, VA May 7, 2010 Howard Weiss NASA/JPL/Cobham
Security WG: Report of the Spring 2012 Meeting European Space Operations Centre Darmstadt, Germany 19 April, 2012 Howard Weiss NASA/JPL/SPARTA
Cesg-1 28 April October 2008 Bob Durst (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA.
08 April 2005 Athens, Greece AD-NP - 1 MOIMS AREA: STATUS REPORT, Start of Spring 2005 Meeting N. Peccia ESA R. Thompson BNSC Area Directors Joint CESG/CMC.
Djc -1 Daniel J. Crichton NASA/JPL 9 May 2006 CCSDS Information Architecture Working Group.
November SECURITY WORKING GROUP REPORT November 2004.
1 09 October SOIS Report to CESG/CMC 9 October 2007 Patrick Plancke, C. Taylor.
Information Architecture BOF: Report of the Fall 2003 Meeting October 28, 2003 Dan Crichton, NASA/JPL.
Delta-DOR SIG Minutes of the meeting Heppenheim, Germany October 2nd, 2007 Roberto Maddè ESA/ESOC
Information Architecture WG: Report of the Spring 2005 Meeting April 14, 2005 Steve Hughes, NASA/JPL.
Moving towards an IRS WG Charter Ross Callon IETF 85, Atlanta.
Data Archive Ingest WG Report to MOIMS Plenary May 14, 2004.
May SPACE LINK AREA MID-TERM REPORT SUMMARY TECHNICAL STATUS 1.DATA COMPRESSION WG Goal : specify an image compression algorithm fulfilling identified.
Security WG: Report of the Fall 2004 Meeting November 19, 2004 Howard Weiss.
1 CCSDS Security Working Group Fall 2011 Meeting 1-2 November 2011 University of Colorado Boulder, Colorado USA Howard Weiss NASA/JPL.
1 Steve Hughes Daniel J. Crichton NASA/JPL January 16, 2007 CCSDS Information Architecture Working.
CSS AREA REPORT 24 January 2007 Colorado Springs, USA CSS AREA: CSEG/CMC Report, Winter 2007 Meeting Erik Barkley (NASA/JPL) Area Director Yves Doat (ESA)
Security WG: Report of the Spring 2014 Meeting NH Hotel Leeuwenhorst Noordwijkerhout, The Netherlands 3 April 2014 Howard Weiss NASA/JPL/PARSONS
June MOIMS AREA PLENARY NAVIGATION WG REPORT June 2006 CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS.
Systems Architecture WG: Report of the Spring 2005 Meeting April 14, 2005 Takahiro Yamada, JAXA/ISAS.
PDS4 Project Report PDS MC F2F University of Maryland Dan Crichton March 27,
Security WG: Report of the Fall 2003 Meeting October 28, 2003 Howard Weiss, NASA/JPL/SPARTA.
Information Architecture WG: Report of the Fall 2004 Meeting November 16th, 2004 Dan Crichton, NASA/JPL.
National Aeronautics and Space Administration 1 CCSDS Information Architecture Working Group Daniel J. Crichton NASA/JPL 24 March 2005.
Security WG: Report of the Spring 2013 Meeting Bordeaux, France 18 April, 2013 Howard Weiss NASA/JPL/PARSONS skype:
Colorado Springs, CO, USA, 24 April 2009 Deputy – David Giaretta
[Area Name] Area Report [Name] (Area Chair) [Name] (Area Deputy Chair)
Security WG: Report of the Fall 2013 Meeting
Delta-DOR WG: Report of the Fall 2010 Meeting
Joint IPR/DAI Workshop
SPACE LINK AREA MID-TERM REPORT
Presentation transcript:

Information Architecture WG: Report of the Fall 2010 Meeting October 29, 2010 Dan Crichton, Chair Steve Hughes (presenting) NASA/JPL

Summary Technical Status 1.Information Architecture WG Goal: Develop a reference architecture and a formal representation method Working Group Status: Active _X__ Idle ___ Will be terminated __ Working Group Summary Situation: Working Group Summary progress: Excellent progress in developing a prototype registry reference implementation to support registration of data products, data dictionaries, and other artifacts Good progress in developing the white book and aligning the interfaces with the reference implementation Interactions with the Reference Architecture BoF development of a SOA style information architecture Discussion on coordinated prototype effort between SM+C/IA personnel regarding the directory services Problems and Issues: Overlapping meeting times makes cross-coordination difficult Status:OKCAUTIONPROBLEM Comment: Progress being achieved

Executive Summary Good discussion on reviewing issues of the Registry Repository reference model –The book needs some minor improvements and examples, but is largely in place and consistent with the prototype Demonstration of a CCSDS registry-compliant prototype showed 100K objects ingested now into a PDS registry –Also demonstrated the importance of an info model-driven approach Several good discussions on the Information Service Architecture and review of the concept and recommendations Action to begin to prototype SM+C directory services with CCSDS registry reference model and report progress at next meeting

Progress Achieved The registry reference information model white book has made considerable progress A functioning prototype has been delivered to a customer A draft charter for the Information Services Architecture (ISA) has been drafted and reviewed Good progress in beginning to align with other architectures and WGs draft

Schedule Address RIDS and changes to the WB and prepare for red book submission (January 2011) Begin prototyping efforts with SM+C/JSC Report back at spring meetings on progress in aligning architecture and WG efforts

Open Issues Continued efforts are needed to coordinate cross-area activity in SOA; suggest CESG direct WGs to help identify overlaps of common services, information models, and messaging

Action Items Send meeting notes, presentations and comments to IAWG –To: Info Arch WG Members –Due: December 1, 2010 Distribute updated registry repository reference architecture –To: IPR and MOIMS members –Due: December 15, 2010

Resource/Overlap Problems Need to identify overlaps in WGs, in terms of information service architecture, and determine how to best leverage what’s been done and to move it towards a more widely used standard/common approach across CCSDS

Cross Area WG / BOF Issues Need to ensure that WGs are working together towards an integrated CCSDS approach

Resolutions to be Sent to CESG and Then to CMC Recommendation to change IA charter to the Information Services Architecture WG and focus on common information architecture/management/modeling approaches across CCSDS and within the space domain

New Working Items, New BOFs, etc. None