IAEA Pilot Project on Safety Culture Assessment at Pakistan Nuclear Regulatory Authority (PNRA) Presented By: Mahboob Ali, Member (Executive) Regulatory.

Slides:



Advertisements
Similar presentations
ENTITIES FOR A UN SYSTEM EVALUATION FRAMEWORK 17th MEETING OF SENIOR FELLOWSHIP OFFICERS OF THE UNITED NATIONS SYSTEM AND HOST COUNTRY AGENCIES BY DAVIDE.
Advertisements

Session No. 4 Implementing the State’s Safety Programme Implementing Service Providers SMS
Chapter 8: Capacity Building Presented by Co Chair Mr. John Briceño CCAD Central American Countries 11/29/2003.
ENEF WG Risks / Bernard Fourest 12 September 2012 PRAGUEBRATISLAVA ENEF WG RISKS Current activities of the SWG Nuclear Installation Safety Bernard Fourest.
Stage One: Registrant Mentor, (N.M.C., 2006).
E.g Act as a positive role model for innovation Question the status quo Keep the focus of contribution on delivering and improving.
INITIAL ON BOARDING COACHING
System Office Performance Management
1 Core Module Three – The Summative Report Core Module Three: The Role of Professional Dialogue and Collaboration in the Summative Report.
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
EEN [Canada] Forum Shelley Borys Director, Evaluation September 30, 2010 Developing Evaluation Capacity.
Stage One: Registrant, (N.M.C., 2006). Student Handout. (May, 2008).
PHAB's Approach to Internal and External Evaluation Jessica Kronstadt | Director of Research and Evaluation | November 18, 2014 APHA 2014 Annual Meeting.
Regulatory Body MODIFIED Day 8 – Lecture 3.
1 Regulatory Challenges During and Following a Major Safety or Security Event Muhammad Iqbal Pakistan Nuclear Regulatory Authority Presentation at General.
System Office Performance Management
Purpose of the Standards
TRU Waste Processing Center Culture and Successful Implementation of an ISO Certified Environmental Management System Presented at the DOE ISM Conference.
Pilot – Professional Mentoring Program The American Association of Blacks in Energy.
IAEA International Atomic Energy Agency The IAEA Safety Culture Assessment Methodology.
Internal Auditing and Outsourcing
Challenges of a Harmonized Global Safety Regime Jacques Repussard Director General IRSN IAEA 2007 Scientific Forum.
FORMATIVE EVALUATION Intermediate Injury Prevention Course August 23-26, 2011, Billings, MT.
IAEA International Atomic Energy Agency How do you know how far you have got? How much you still have to do? Are we nearly there yet? What – Who – When.
From Evidence to Action: Addressing Challenges to Knowledge Translation in RHAs The Need to Know Team Meeting May 30, 2005.
Postgraduate Educational Course in radiation protection and the Safety of Radiation sources PGEC Part IV The International System of Radiation Protection.
NEXT Lessons Learned from Integrated Regulatory Review Service (IRRS) 22 nd and 23 rd January 2014, Brussels Fernando Franco, Spanish Nuclear.
Do it pro bono. Strategic Scorecard Service Grant The Strategy Management Practice is presented by Wells Fargo. The design of the Strategic Scorecard Service.
Add presentation title to master slide | 1 New inspection methodology from September 2009 NATSPEC conference Lorna Fitzjohn May 2009.
NIST Special Publication Revision 1
Demystifying the Business Analysis Body of Knowledge Central Iowa IIBA Chapter December 7, 2005.
IAEA International Atomic Energy Agency Reviewing Management System and the Interface with Nuclear Security (IRRS Modules 4 and 12) BASIC IRRS TRAINING.
Recordkeeping Capability: Public Records Act Audit Programme Darrin Goulding, Project Manager, Public Records Act Audit Strategy Kate Jones, Senior Advisor,
IAEA International Atomic Energy Agency. IAEA Outline LEARNING OBJECTIVES FIRST THINGS FIRST Invitation of a mission Information meeting self-assessment.
08 October 2015 M. Ammar Mehdi Introduction to Human Resource Management & SSG-16 Actions 4 th Steering Committee on Competence of Human.
The inspection of local area responsibilities for disabled children and young people and those who have special educational needs Charlie Henry HMI National.
LESSONS LEARNED IN DEVELOPMENT OF SAFETY CULTURE FOR REGULATORY BODIES
March 26-28, 2013 SINGAPORE CDIO Asian Regional Meeting and Workshop on Engineering Education and Policies for Regional Leaders Programme Evaluation (CDIO.
SÄTEILYTURVAKESKUS STRÅLSÄKERHETSCENTRALEN RADIATION AND NUCLEAR SAFETY AUTHORITY Key outcomes of IRRS Mission in Finland Kirsi Alm-Lytz.
What could we learn from learning outcomes assessment programs in the U.S public research universities? Samuel S. Peng Center for Educational Research.
ISM Annual Review and Declaration Lessons Learned CH2M HILL Hanford Group John McDonald.
Region 1 Training Workshop Crowne Plaza Albany – 1-2 August 2008 Session 1A Strategic Planning Arthur W. Winston Chair, R1 Strategic Planning Committee.
Senior Evaluation Officer GEF Independent Evaluation Office Minsk, Belarus September 2015 Evaluation in the GEF and Training Module on Terminal Evaluations.
Nuclear Security Culture William Tobey Workshop on Strengthening the Culture of Nuclear Safety and Security, Sao Paulo, Brazil August 25-26, 2014.
The University of Kentucky Program Review Process for Administrative Units April 18 & 20, 2006 JoLynn Noe, Assistant Director Office of Assessment
1 st Workshop on issues and trends arising from the European IRRS missions Findings and Conclusions A.Munuera Brussels, 22 nd and 23 rd January 2014.
Board Feedback Results Board Meeting Dallas April 2007 Board Feedback Results Governance Committee Report Presented at Los Angeles July 2007.
IAEA International Atomic Energy Agency. IAEA Outline LEARNING OBJECTIVES FIRST THINGS FIRST Invitation of a mission Information meeting self-assessment.
Regional Seminar on Promotion and Utilization of Census Results and on the Revision on the United Nations Principles and Recommendations for Population.
Validated Self Evaluation of Alcohol and Drug Partnerships Evidencing Implementation: The Quality Principles – Care Inspectorate/The Scottish Government.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
IAEA International Atomic Energy Agency Arusha, Tanzania EGYPT Mohamed Reda Ezz El-Din 2 – 5 December 2013 RAF9038 Final Coordination Meeting.
IAEA International Atomic Energy Agency The Human and Organizational Part of Nuclear Safety Monica Haage – International Specialist on.
Quality Assurance Review Team Oral Exit Report School Accreditation Sugar Grove Elementary September 29, 2010.
IAEA International Atomic Energy Agency Arusha, Tanzania Uganda Dr. Akisophel Kisolo Project Counterpart 2 – 5 December 2013 RAF9038 Final Coordination.
Revision N° 11ICAO Safety Management Systems (SMS) Course01/01/08 Module N° 9 – SMS operation.
IAEA International Atomic Energy Agency Milestones in Development of a National Infrastructure for Nuclear Power Infrastructure Issue: Management C.R.
Lenoir County Public Schools New North Carolina Principal Evaluation Process 2008.
CHB Conference 2007 Planning for and Promoting Healthy Communities Roles and Responsibilities of Community Health Boards Presented by Carla Anglehart Director,
TAIEX-REGIO Workshop on Applying the Partnership Principle in the European Structural and Investment Funds Bratislava, 20/05/2016 Involvement of Partners.
Project: EaP countries cooperation for promoting quality assurance in higher education Maria Stratan European Institute for Political Studies of Moldova.
PILOT SCHOOL PRINCIPAL EVALUATION
Department of Political Science & Sociology North South University
From Nuclear Safety Culture to Railway Safety Culture
Training Course on Integrated Management System for Regulatory Body
Our new quality framework and methodology:
Safety Culture Self-Assessment Methodology
Communication and Consultation with Interested Parties by the RB
Aligning Academic Review and Performance Evaluation (AARPE)
IAEA - Department of Nuclear Safety & Security
Presentation transcript:

IAEA Pilot Project on Safety Culture Assessment at Pakistan Nuclear Regulatory Authority (PNRA) Presented By: Mahboob Ali, Member (Executive) Regulatory Cooperation Forum (RCF), Plenary Meeting 18 September, 2015 IAEA, Vienna, Austria Pakistan Nuclear Regulatory Authority (PNRA)

Highlights of Presentation Importance of Safety Culture for Regulatory Body Core Values – Safety Culture at PNRA PNRA Safety Culture Self Assessment (SCSA) Conclusion 2

Importance of Safety Culture for Regulatory Body The concept of safety culture is essential part of management system (IAEA GS-R-3) which is applicable to all kind of organizations including operators, vendors, regulatory bodies, etc. After Fukushima accident, the role of safety culture in ensuring safety was re-emphasized and was also reflected in IAEA action plan on nuclear safety issued in As part of IAEA action plan on nuclear safety, regulators are also being encouraged to conduct safety culture assessment. 3

Utilizing Principles of Safety Culture at PNRA The consideration of safety culture principles remained an important part of regulatory business at PNRA in the form of core values since its inception. Following core values were defined in the initial stages of PNRA’s establishment; –Integrity –Transparency –Independence in Decision Making –Competence and Professionalism –Mutual Respect –Caring and Compassionate Attitude 4

Need for Safety Culture Self Assessment (SCSA) at PNRA In 2012, PNRA volunteered for SCSA in order to judge its safety culture systematically utilizing IAEA approach (i.e. in development phase) which is applicable for regulators, operating organizations etc. 5

Factors Considered for Conducting SCSA at PNRA Following were factors that were considered; –Identification of strong and weak areas of safety culture in comparison with international standards (i.e. Modified IAEA normative framework to make it applicable for regulatory body); –Elements contributing negatively towards safety culture at PNRA may be addressed to convert them into strengths; –To be role model for licensee’s 6

7 Safety Culture Self Assessment (SCSA) Project at PNRA

SCSA Project with IAEA A Project was initiated with IAEA to conduct SCSA at PNRA with the help of international experts. IAEA prepared training material by involvement of international experts for conducting SCSA. In addition to formal meetings, video Conference of IAEA Team with PNRA Management was held in February 2013 before formal start of project: To discuss purpose of the proposed SCSA activity with top management. To seek commitment of PNRA 8

Team Selection IAEA shared criteria (i.e. in term understanding safety culture) for team selection with PNRA. PNRA selected multidiscipline team consisting of twenty two (22) officers with team leader representing management. Representation of almost all parts of organization with different thinking / perspective was made in the team to avoid unidirectional thinking. 9

IAEA Training Course on SCSA Methodology IAEA delivered training to team on SCSA methodology (April 2013): Understanding of Safety Culture and its importance for any organization including regulatory body Safety culture assessment tools (observations, focus group, interviews, survey and document analysis) Descriptive Analysis Normative Analysis 10

Workshop on Safety Culture for Senior Management IAEA conducted workshop for PNRA senior management to cover (April 2013): Understanding of Safety Culture and why it is important for regulatory body Purpose of SCSA activity and its effectiveness for PNRA Safety culture assessment tools (observations, focus group, interviews, survey and document analysis) Descriptive Analysis Normative Analysis 11

Bridging Seminar A seminar was conducted to bridge SCSA team with PNRA management (April 2013) The purpose of seminar was: –To convey expectations of SCSA team to PNRA management and vice versa –To clear doubts about SCSA process, its outcomes and effectiveness 12

Train the trainer for Safety Culture Assessment of Licensees The purpose of train the trainer for safety culture assessment of licensee was (May 2013): –Methodology of safety culture inspections of licensees –Design of training course for inspector responsible to conduct safety culture inspections –Training of inspectors for safety culture inspections 13

14 Implementation of SCSA at PNRA

Planning for conducting SCSA at PNRA The plan / procedure for conducting SCSA at PNRA was documented and approved. (July 2013) Procedure addressed: –Plan for implementation of SCSA –Distribution of responsibilities –Timeline for implementation of SCSA 15

Awareness Campaign Awareness campaign was conducted for each / division of PNRA to share information about safety culture and SCSA (July – September 2013) Different modes were utilized for this campaign –Presentation sessions – s describing SCSA process and its significance / usefulness for PNRA –Display of posters highlighting concept of safety culture and SCSA process 16

Dissemination of Information Two modes were selected for dissemination of information about progress of SCSA process: –Team meeting to share implementation of actions assigned to each team member –Meeting with PNRA senior management to share information regarding implementation status of SCSA process 17

Implementation of SCSA Tools Observations Interviews Document Analysis Surveys Focus Groups 18

Observations It was on going activity which continued through out the SCSA implementation phase Observations were made during activities such as; –Routine working –Formal and informal gatherings –Formal meetings with licensees and within PNRA –Organizational response / stance that presented time to time 19

Interview Preparatory material defining wide range of areas to be explored during interviews was prepared (August –September 2013) Interviews (October 2013 – September 2014) –70 – 80 personnel from different levels in the organization (horizontally and vertically) selected for interviews –The sample set included representation of every discipline in the organization (technical, support, managers, senior managers etc.) –Responsibilities distributed among SCSA team members for holding these interviews 20

Document Analysis Selection of documents for document analysis (September – November 2013) Document Analysis (December 2013 – September 2014) – documents selected –The sample set included representation of every type of documents (technical reports, procedures, performa’s, etc.) –Responsibilities distributed among SCSA team members for analysis of these documents 21

Surveys Preparation of survey questionnaire (July – November 2013) Surveys (December 2013 – August 2014) –Survey consisting of questions was prepared –Each individual of organization was included for implementation of this tool (The turn out of survey was 250 out of 700) 22

Focus Group Preparatory material defining wide range of areas to be explored during focus groups was prepared (July 2014) Focus Groups (August – September 2014) –Total twelve (12) focus groups were planned, eight (8) at HQs and four (4) at regional directorates –Each focus group included 8-10 personnel from different levels in the organization (horizontally and vertically) –The sample set included representation of every discipline in the organization (technical, support, managers, senior managers etc.) –Responsibilities distributed among SCSA team members for holding these focus groups 23

Data Collections from SCSA Tools Data generated from SCSA tools was forwarded to team leader for its consolidated storage under the header of each tools Complete confidentiality of data was maintained by restricting its access 24

Descriptive Analysis Descriptive analysis (October - November 2014) –Almost 1900 cultural facts were collected during implementation of five SCSA tools. –Descriptive analysis was carried out for each of the SCSA tool separately and identified cultural themes. 25

IAEA Support Mission – November 2014 IAEA support mission was invited in November-2014 to review descriptive analysis carried out by SCSA team. IAEA experts shared valuable feedback to improve descriptive analysis; –The methodology of developing “bubble diagram” was shared by experts to explore cultural themes starting from visible part of culture i.e. cultural facts collected during implementation of SCSA tools to explores beliefs and finally basic assumptions at the deeper part of ice berg. –It was proposed by experts to refine descriptive analysis using bubble diagram methodology. 26

Sample Bubble Diagram 27

Refining Descriptive Analysis Descriptive analysis was refined (December 2014 – April 2015) using feedback of IAEA experts. – For each SCSA tool, cultural themes were highlighted. –Overarching cultural themes were highlighted from all tools of SCSA. 28

Normative Analysis Normative Framework –PNRA started with IAEA normative framework (i.e. referred in GS-G-3.5) and modified it to make it applicable for regulatory body. –The framework utilized for normative analysis at PNRA was consisted of five (05) safety culture characteristics and thirty six (36) attributes under these characteristics. –One attribute was deleted due to its non applicability on PNRA; “Individuals are convinced that safety and production go ‘hand in hand’” –Few of them were slightly modified to make them applicable appropriately to regulatory body. 29

IAEA Support Mission – April 2015 IAEA support mission was again invited in April 2015 to review analysis carried out by PNRA team. IAEA experts reviewed descriptive and normative analysis carried out by PNRA; –Overarching cultural themes were finalized from the descriptive analysis of all SCSA tools; –Normative linkages of these overarching cultural themes were established with modified IAEA normative framework. 30

Communication Session with PNRA Management After finalization of descriptive and normative analysis, the outcome of SCSA was communicated to PNRA management in communication session. The communication session was composed of; –Brief about SCSA activity carried out by PNRA team –Theory of Culture and its assessment –Overarching themes emerged from descriptive analysis along with basic assumption and factors driving these cultural trends –Normative linkages of these cultural trends with modified IAEA normative framework to highlight strong and weak areas of safety culture at PNRA. 31

Activities in Progress Development of SCSA report comprising of summary of process, its outcomes, lessons learnt, etc. and strategy for communicating these results to all domains of PNRA. Finalization of improvement activities for converting weak areas of safety culture to strengths. 32

Conclusion PNRA considers safety culture as important ingredient of its regulatory processes and conducted its self assessment. The importance for incorporation of safety culture principles in regulatory processes is growing day by day learning from lessons of experience feedback including Fukushima accident. PNRA Safety Culture Self Assessment (SCSA) provided opportunity to highlight strengths / weakness to make safety culture at PNRA at par with international standards. 33

34