Generation Deliverability Criteria PLWG September 17, 2014 Jeff Billo, ERCOT 1.

Slides:



Advertisements
Similar presentations
Modeling Tres-Amigas Update Modeling Work Group Meeting February 10, 2011 WECC Staff.
Advertisements

Houston Region Import Capacity Project Planning for Reliable Power.
RPG: September 24, Approach for ERCOT Independent Review of the 2013 Houston Import Project Jeff Billo, Manager, Transmission Planning September.
October 16, 2009 RPG Meeting ERCOT RPG Project Review Update Jeff Billo.
California Energy Action Plan Joint Public Meeting Electricity System Reliability Activities California Energy Commission July 17, 2003.
1 Generation Adequacy Task Force Report to TAC April 7, 2005.
Houston Import Evaluation Cross Texas Transmission & Garland Power & Light ERCOT RPG Meeting August 27th, 2013.
Economic Criteria for Transmission Planning in the ERCOT Region Public Utility Law Seminar DeAnn Walker August 3, 2012.
ROS Meeting November 8 th, 2012 SSWG 13DSB Case Preparation Extraordinary Dispatch.
January 5, 2012 TAC Cross Valley 345 kV Project Jeff Billo Manager, Mid-Term Planning.
Energy supply forecast Presentation to Connecticut’s Energy Future Conference by Bridgett Neely, London Economics International LLC December 2, 2004 Hartford,
INTEGRATION COST. Integration Cost in RPS Calculator While “Integration Cost” is included in NMV formulation, the Commission stated that the Integration.
Valley Import Overview Jeff Billo Regional Planning Group Meeting July 22, 2014 Preliminary1.
ERCOT PUBLIC 8/19/ LTSA Scenario Results Updates August, 2014.
2001 South First Street Champaign, Illinois (217) Davis Power Consultants Strategic Location of Renewable Generation Based on Grid Reliability.
PLWG Report to ROS July 9, PGRRs needing vote PGRR043 – FIS Scoping Amendment – PGRR043 moves the Subsynchronous Resonance (SSR) Study out of the.
Valuing Economic Benefits from Transmission Planning ERCOT System Planning March 22, 2006.
Need for Transmission Investment 2010 Mid-American Regulatory Conference AEP.
Long Term Study Task Force Update Transmission Study Practices and Methodologies April 5th,2011 LTS.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
1 Distributed Energy Resources: Bringing Energy Closer to Home Presentation by the Industry Task Force on Distributed Generation July 28, 2005.
ERCOT PUBLIC LTSA Introduction. ERCOT PUBLIC 2 Outline  Background  2016 LTSA Process  Summary of first LTSA Workshop  Topics and Speakers.
Texas Wind Energy American Meteorological Society Summer Community Meeting – Norman Oklahoma Henry Durrwachter, P.E. August 12, 2009.
Page 1© 2009 Quanta Technology LLCPage 1 November 2007 BGE January 4, 2008 Strategic Midwest Area Renewable Transmission (SMART) Study October 06, 2009.
ERCOT Planning WMS 10/20/2010 Target Reserve Margin and Effective Load Carrying Capability of Installed Wind Capacity for the ERCOT System – Methodology.
ERCOT Planning October 2010 Target Reserve Margin and Effective Load Carrying Capability of Installed Wind Capacity for the ERCOT System - Methodology.
Economic Planning – Theory and Current Practice Dan Woodfin Director, System Planning Joint PLWG/CMWG Meeting 2/4/2011.
RELIABILITYFIRST CORPORATION Long Term Resource Assessment 2010 – 2019 Board of Directors Meeting September 30, 2010 Presented by Jeff Mitchell.
ERCOT PUBLIC 6/17/ LTSA Load Distribution Methodology June 17, 2014.
May 03, UFE ANALYSIS Old – New Model Comparison Compiled by the Load Profiling Group ERCOT Energy Analysis & Aggregation May 03, 2007.
PJM©2015 Updates to PJM Load Forecast Model OPSI Annual Meeting October 12, 2015 Tom Falin Manager – Resource Planning
Wholesale Market Subcommittee Texas Interconnection Long-Term Study Update Warren P. Lasher April 8, 2011.
IWWG Annual Conference Wind Management at MISO July 22, 2011.
April 16, 2010 RPG Meeting Lamesa Area Upgrades ERCOT Independent Review Jeff Billo.
ERCOT PUBLIC 10/7/ Load Forecasting Process Review Calvin Opheim Generation Adequacy Task Force October 7, 2013.
09/17/2006 Ken Donohoo ERCOT Peak Day August Initial Settlement Data by Fuel Type.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
TAC02/01/2007 DW 1 TAC Briefing on: - Report on Constraints and Needs: Five Year Plan Development - Long Term System Assessment (LTSA) - Entergy Integration.
February 13, 2009 RPG Meeting ERCOT System Development Update Jeff Billo.
BI Marketing Analyst input into report marketing Report TitleElectricity in Texas Report Subtitle State profile of power sector, market trends and investment.
2nd Workshop on PGI in NEA, May , Shenzhen, China 1 “RFE-NEC-DPRK-RK” POWER GRID INTERCONNECTION Sergei Podkovalnikov Energy Systems Institute,
PLWG Report to ROS January 7, Draft NPRR More closely aligns a generation line item in the CDR with the generation included in the Planning Models.
Long Term Study Resource Expansion Process: Study Findings and Lessons Learned Jenell Katheiser Doug Murray RPG May 21, 2013.
1 WMS Report TO TAC April 2007 (which is in March)
2014 & 2015 Unannounced Unit Testing Summary ERCOT ROS February 4 th, 2016.
RPG: September 24, Long-Term System Assessment Introduction Jeff Billo, Manager, Transmission Planning September 2013 Regional Planning Group.
ERCOT – MISO DC Tie Study Comments
Planning for Texas’ Energy Future Select Committee on Electric Generation Capacity and Environmental Effects Bob Kahn President & CEO February 6, 2008.
Document number Anticipated Impacts for FRRS Pilot Program ERCOT TAC Meeting September 7, 2012.
PLWG Report to ROS September 4, PGRR039 PGRR requires Interconnecting Entities (IEs) to provide information for ERCOT’s resource adequacy reports,
Capacity, Demand and Reserves Report Bill Bojorquez May 4, 2007.
Joint PLWG/CMWG Assignment Update to ROS September 15, 2011.
Capacity, Demand and Reserves Report Bill Bojorquez Board of Directors Meeting May 16, 2007.
1 Economic Dispatch Sub-Committee Meeting Ross Baldick Department of Electrical and Computer Engineering The University of Texas at Austin September 24,
Draft Seventh Power Plan Meets RTF. Key Finding: Least Cost Resource Strategies Rely on Conservation and Demand Response to Meet Nearly All Forecast Growth.
ERCOT PUBLIC 5/20/ LTSA Current Trends Scenario Results May 20,2014.
CEO Report Thomas F. Schrader ERCOT Board of Directors July 19, 2005.
ERCOT PUBLIC LTSA Introduction. ERCOT PUBLIC 2 Outline  Background  2016 LTSA Process  2016 Scenario Development Process  2016 LTSA Schedule.
June 11, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
Response to TAC Questions on PGRR031 TAC– January 28, 2014 Jeff Billo, ERCOT 1.
Generation Adequacy Task Force Meeting April 10, 2014.
PLWG Report to RPG January 21, 2014 Presented by John Moore, PLWG Chair.
Future Ancillary Services Cost Benefit Analysis Overview Julia Matevosyan February 1, 2016 FAS Workshop.
1 ERCOT 2015 West Texas Study November 18, 2014 Jeff Billo.
2018 LTSA Workshop August 2017 RPG Meeting Welcome to.
ERCOT 2009 Five-Year Transmission Plan Update
Southern Cross Directives Planning Items
Generation Adequacy Task Force Update to WMS
Market Design in New England
Transmission System Update
Presentation transcript:

Generation Deliverability Criteria PLWG September 17, 2014 Jeff Billo, ERCOT 1

Review PLWG and ROS have identified a potential gap in the planning analysis related to generation deliverability – ROS directed PLWG to develop language to include criteria to address generation deliverability in peak Load conditions (July 2014) PLWG discussions have focused on the methodology to determine when transmission is constraining generation and what criteria should be employed to solve these constraints Criteria discussions have bogged down due to issue of not wanting to “spend $100M to get the last 1 MW out” – This seems to be pointing towards criteria that is more related to economics 2

What is the societal benefit of relieving generation constraints? Current economic criteria and processes may not fully capture the societal economic benefit of transmission additions that relieve generation constraints – When generation is constrained on peak more generation needs to be constructed to meet peak demand. This adds a societal cost for new units that is not accounted for in current economic transmission planning criteria – Generation is more valuable during hot summers than normal weather summers in Texas. Hence, transmission that relieves constrained generation is more valuable during hot summers. The current economic transmission planning process only considers 50/50 load conditions which will undervalue projects that relieve these constraints 3

Two conceptual economic planning criteria additions 1.Consider reduced generation investment needs due to relieving transmission bottlenecks that constrain generation at peak – In addition to the production cost savings of a project – Need to devlop a metric such as the Cost Of New Entry as the appropriate societal cost benefit – May need to discount for plants closer to retirement 2.Consider probability-weighted production cost savings for different load profiles – In the Brattle Group’s 2013 review of the ERCOT LTSA and economic planning processes they noted that “SPP’s Metrics Task Force recently suggested that SPP’s production simulations should be developed and tested for load profiles that represent 90/10 and 10/90 peak load conditions— rather than just for base case simulations (reflecting 50/50 peak load conditions)...” – May need to consider generation shortage conditions in outer years 4

Example 5 $1.0 M (10/90 Prod Cost Savings) X 20% (Probability) = $1.5 M (50/50 Prod Cost Savings) X 60% (Probability) = $5.0 M (90/10 Prod Cost Savings) X 20% (Probability) = $100,000 ($/MW-yr CONE NET ) X 50 MW = $0.2 M $0.9 M $1.0 M $5.0 M $7.1 M Total Annual Savings = Test transmission project that relieves 50 MW generator constraint

Tying Back to Generation Deliverability These additional metrics would ensure that transmission that is built to relieve constrained generation is economically beneficial for society – Does not change the reliability criteria, therefore preventing unchecked spending on transmission investment with little generation benefit Discussion 6