12/Dec/2012SBS-Meeting1 of 24 Status of the Front Tracker GEM and INFN Electronics 2012 – Dec – 12 SBS Weekly Meeting GEM Assembling SRS – INFN Electronics.

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

Status of test beam data analysis … with emphasis on resistive coating studies Progress and questions 1Meeting at CEA Saclay, 25 Jan 2010Jörg Wotschack,
GEM Detectors for AnDY Nilanga Liyanage University of Virginia 1 Outline GEM chamber concept Large area GEM chamber projects Proposed GEM configuration.
Pavia 25/11/2003Davide Piccolo INFN Napoli Status of assembling and Chamber results at HT Pavia 25/11/2003 Davide Piccolo.
CMS GEM Workshop III, April 20, 2012
Nilanga Liyanage University of Virginia UVa GEM Team Dr. Kondo Gnanvo, Dr. Vladimir Nelyubin, Kiadtisak Saenboonruang, Chao Gu, Xinzhan Bai, Jie Liu, Seth.
ITOP carrier amplifier test at Indiana University G. Visser 4/27/2015 (latest update) I use the recently (here) characterized JT0947 ch3 as input source.
Read-out boards Rui de Oliveira 16/02/2009 RD51 WG1 workshop Geneva.
INFN GEM Front Tracker 2012 Oct 18 / SBS Coll. / JLabE. Cisbani1 V. Bellini, M. Capogni, E. Cisbani, S. Colilli, F. Giuliani, M. Gricia, F. Librizzi, M.
Introduction to GEM detectors assembly Leszek Ropelewski CERN CompassTotem 33 cm NA61 30 cm 20 cm 66 cm Totem Upgrade 10 cm.
1 SBS Spectrometer / GEP5 Conf.. 2 Tracking Requirements Requirements Tracking Technology DriftMPGDSilicon High Rate: MHz/cm 2 (Front Tracker)
Chiho Wang ATLAS TRT Duke University Dubna, May Fuse Box Production Chiho Wang/Jack Fowler.
Oct, 2000CMS Tracker Electronics1 APV25s1 STATUS Testing started beginning September 1 wafer cut, others left for probing 10 chips mounted on test boards.
GEM Electronic System Status New releases of electronic boards: ◦ MPD v 4.0 ◦ Backplane 5 slot short (for UVa design) ◦ APV Front-End with Panasonic connector.
BANDGEM Demonstrator: conceptual design and state of the art.
ISR Work Progress Report Muon Week April 10 th 2003 A. Benvenuti INFN Bologna.
1 HBD Construction status Itzhak Tserruya DC meeting, BNL, February, 2006 Plans for Run-6 Box construction GEM assembly and testing Status of urgent items.
CMS Week, CERN, December Dec 2004CMS Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group Meeting Salvatore.
1 July GEM R&D Activity in USTC Yi Zhou University of Science & Technology of China.
12/Dec/2012SBS-Meeting1 of 24 Status of the Front Tracker GEM and INFN Electronics 2013 – Feb – 20 SBS Weekly Meeting GEM Assembling SRS – INFN Electronics.
HBD Meeting 3/14/06 B. Azmoun BNL Testing and Preparation of HBD Full Scale Prototype for Upcoming Engineering Run Puzzling Behavior of GEM’s To Do List.
LHCf Arm2 – status of hardware upgrade in Firenze Lorenzo Bonechi 20 December 2013.
Updates on GEMs characterization with APV electronics K. Gnanvo, N. Liyanage, K. Saenboonruang.
John LeRose March 12, A Program of three “projects” to assemble the Super BigBite Spectrometer for a series of experiments in Hall A There is a.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
The Bigbite second GEM tracker. SBS GEM Trackers Front Tracker Geometry x6 18 modules In Italy  50 cm x 40 cm Modules are assembled to form larger chambers.
HallA/SBS – Front Tracker PARAMETERDESIGN VALUE Microstrip Silicon Detector Number of tiles/plane and size2 Number of planes2 Size of the single
Large area detectors Aida WP 9.2 RD51 WG6
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
Update on SBS Back Tracker UVa K. Gnanvo, N. Liyanage, V Nelyubin, K. Saenboonruang, Seth Saher, Nikolai Pillip (visiting from Univ. Tel Aviv, Israel)
Statement of Interest in CMS MPGD High-  Muon Upgrade Florida Tech CMS Muon Group Marcus Hohlmann Florida Institute of Technology, Melbourne, FL, USA.
GEM R&D Update Kondo Gnanvo. Outline  GEM R&D and assembly facilities at UVa  Cosmic test results  Update on the 40 × 50 cm 2 GEM prototype  Plans.
Performance of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger,
GEM Trackers for Super BigBite Spectrometer (SBS) in Hall JLab The Super Big Bite Spectrometer (SBS) is one of the major new equipment in hall A in.
Status of GEM T2 assembly Outline Status of the GEM components Summary Tests TOTEM Collaboration meeting CERN / Risto Orava for Kari Kurvinen.
G. Steinbrück 6/21/ Premounting of AOHs for the TEC in Hamburg Georg Steinbrück Hamburg University AOH Meeting, CMS Week 6/21/2005  Status of AOH.
Kondo GNANVO University of Virginia (UVa) Update on GEM Activities for the 12 GeV Program in Hall A at JLab.
Front GEM Chambers Design concepts –Foils –Mechanics Electronics and DAQ Performance Current activity and plan Evaristo Cisbani / INFN-Rome Sanità group.
24/05/2010Rui De Oliveira1 Resistive protections for Bulk Micromegas Rui de oliveira, Joerg Wotschack Venetios Polychronakos.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
1 TPC R&D proposal from the WIS group I. Ravinovich WIS I. Ravinovich12/15/2015.
HBD Status Craig Woody BNL DC Meeting October 3, 2007.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
Calibration of the gain and measurement of the noise for the apv25 electronics K. Gnanvo, N. Liyanage, C.Gu, K. Saenboonruang From INFN Italy: E. Cisbani,
Test of the GEM Front Tracker for the SBS Spectrometer at Jefferson Lab F. Mammoliti, V. Bellini, M. Capogni, E. Cisbani, E. Jensen, P. Musico, F. Noto,
QA/QC in MM SM1 Mod 0 Production at INFN QA/QC MM SM1 Mod 0 - G. Maccarrone 19-Jan
Chamber Quality Control Before the construction several checks are performed on:  Panels (cathode and pad PCB)  GEM foil Tests on assembled detector.
09/10/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
Quality control for large volume production GEM detectors Christopher Armaingaud On behalf of the collaboration GEMs for CMS.
The 12 GeV equipment Hall D – Hall D – GLUEx detector for photoproduction experiments Hall B – Large acceptance detector CLAS12 for high luminosity measurements.
Front Tracker: main technical solutions 40x50 cm 2 module Front Tracker Chamber: 40x150 cm 2  Use COMPASS approach: 3xGEM, 2D readout - one significant.
Beam Test of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger, A.
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
Tracker Week, CERN, Feb Feb 2004Tracker Week - Module ProductionSalvatore Costa - Catania Report on Module Bonding Salvatore Costa Università.
Results on a Large Area triple-GEM Detector at LNF 5 th RD51 Collaboration Meeting Freiburg, 25 May 2010 D. Domenici - LNF.
Uva GEM R&D Update –Part I Kondo Gnanvo, Nilanga Liyanage, Vladimir Nelyubin, Kiadtisak Saenboonruang, Taylor Scholz and Adarsh Ramakrishnan In Collaboration.
T2 GEM Production in Helsinki Kari Kurvinen TOTEM T2 EDR meeting Radiation Detector Laboratory of Helsinki Institute of Physics (HIP) and Department.
A High Eta Forward Muon Trigger & Tracking detector for CMS A High Eta Forward Muon Trigger & Tracking detector for CMS Archana Sharma For CMS High Eta.
Rui De Oliveira Vienna March 2014 Industrialisation of Micromegas detector for ATLAS Muon spectrometer upgrade 1.
(On Behalf of CMS Muon Group)
Quality Control Chamber Production
Development of a Marx-Generator for the drive beam electron gun
On behalf of the GEMs for CMS Collaboration
Status of the Front Tracker GEM
On the Prototype beam test: (I) Noise and signal extraction
Development of Gas Electron Multiplier Detectors for Muon Tomography
SBS Front Tracker GEM short update on inefficient sectors
Presentation transcript:

12/Dec/2012SBS-Meeting1 of 24 Status of the Front Tracker GEM and INFN Electronics 2012 – Dec – 12 SBS Weekly Meeting GEM Assembling SRS – INFN Electronics comparison CERN Test (with small GEMs) INFN – Catania, Genova, Bari and Rome

12/Dec/2012SBS-Meeting2 of 24 GEM Assembling We got: 5 GEM foils + 14 Drift foils (Feb/2012) Many (all) frames in Spring/ Readout foils + 7 Honeycomb plane (Set/2012) Start Assembling in Oct/2012 Expected 10 new GEM foils before the Christmas break

12/Dec/2012SBS-Meeting3 of 24 Assembling Procedure 1)Readout foil glued on Honeycomb plane 2)Raw GEM foil HV test 3)Protective resistor soldered in single sector side of the GEM foil 4)GEM foil stretched 5)Frame glued on stretched GEM foil 6)Readout plane glued on framed GEM foil 7)Protective resistors soldered on each GEM sector 8)HV test of the assembled GEM foil 9)Repeat from 2 to 8 for the other 2 GEM foils and the drift foil 10) Glue the last frame and Mylar entrance foil

12/Dec/2012SBS-Meeting4 of 24 Readout foil visual inspection We observed some defects on the readout Rui informed about that

12/Dec/2012SBS-Meeting5 of 24 Readout on Honeycomb support

12/Dec/2012SBS-Meeting6 of 24 Readout Stored in Cabinet

12/Dec/2012SBS-Meeting7 of 24 GEM Foil Visual Inspection Visually better than previous prototype GEMs Apparently minor defects

12/Dec/2012SBS-Meeting8 of 24 GEM HV Test Nitrogen filled box Start ramping up HV when humidity in box < 10%

12/Dec/2012SBS-Meeting9 of 24 GEM HV Test procedure (plan) This procedure “worked” for the GEM foil prototypes

12/Dec/2012SBS-Meeting10 of 24 GEM HV Test Current was fine at relatively low HV (<300 V)

12/Dec/2012SBS-Meeting11 of 24 GEM HV Test, first results Foil 0: Trip at 280 V → sector 7 with 71 kOhm resistance Decided to move to a new foil Foil 1: Trip at 460 V →sector 3 with 21 kOhm Foil 2: First trip at 400 V → sector 13 with few kOhm (removed from test) Second trip at 490 V → sector 12 with few kOhm We decide to change the HV power supply Hardware limiting current ~3 uA; software 1 uA

12/Dec/2012SBS-Meeting12 of 24 GEM HV Test, part 2 Back to Foil 1 (limiting current at 250 nA): Trip at 450 V → sectors 3 and 14 at 97 and 22 kOhm! Trip again at 450 V → sector 19 at 12 kOhm Back to Foil 0 (limiting current at 180 nA): Trip at 390 V → sector 14 at 67 kOhm We decide to test single sectors and reduce the limiting current to 40 nA From now on, we had trips at >520 V but always recovered! But test is very “weak”

12/Dec/2012SBS-Meeting13 of 24 HV Test, part 3 Two foils passed the new test procedure (single sector, limiting current 40 nA, no short sectors) Try to ramp up HV up to 600 V to all sectors simultaneously with limiting current at 1 uA: Foil 5: lost 3 sectors with few 100 kOhm. Reduced max HV to 400 V (working HV will be below 350 V) and limiting current at 500 nA: Foil 4: fine (… is this test enough ?)

12/Dec/2012SBS-Meeting14 of 24 HV Test / Results FoilBad sectorsTest 1Test 2Test 3 07, 14Not passed-- 13,14,19Not passed-- 213,12Not passed-- 3--passedPassed (with reduced max I and V) 43 sectors with few kOhm -passedNot passed

12/Dec/2012SBS-Meeting15 of 24 HV Test – What was wrong ? Rui suggests to “clean” the foil: HV to 600 V (single sector) in a quick ramp, limiting current at 2 uA, and keep it for few minutes: dust will vaporize. We tried with one of the “bad” foil but no success. Bencivenni/LNF uses a test procedure very similar to our first attempts (limiting current at 5 uA) Rui informed that the paper foils used to protect the GEM during transportation will be replaced by mylar (or similar) foils to avoid dust in GEM. The large failure we experienced is puzzling!

12/Dec/2012SBS-Meeting16 of 24 Electronics After the UVa measurements Paolo has analyzed the differences between INFN and SRS electronics. We basically implemented all of them on cards and on the VME module (MPD): No remarkable effects measured Paolo has adapted one SRS cards to the INFN- system to proceed with a direct comparison.

12/Dec/2012SBS-Meeting17 of 24 INFN – SRS: pedestal noise RMS of pedestals very similar SRSINFN1 and 2

12/Dec/2012SBS-Meeting18 of 24 INFN - SRS: internal pulser SRS slightly higher gain, but probably within cards variability

12/Dec/2012SBS-Meeting19 of 24 INFN – SRS: external pulse - setup The ADG904 is basically an electronic multiplexer/switch The INFN cards are connected by a kapton adapter 8 contiguous strips stimulated 40 dB Attenuator Pulser Variable Card Capacitor few pF

12/Dec/2012SBS-Meeting20 of 24 INFN – SRS: external pulse SRS/INFN ~ 2

12/Dec/2012SBS-Meeting21 of 24 INFN – SRS: external pulse - noise Pulse on SRSPulse on INFN0 Noise in INFN card larger when test card is connected (next)

12/Dec/2012SBS-Meeting22 of 24 INFN – SRS : status Noise levels of naked cards looks very similar Noise levels when cards are connected to test board changes Gain with internal pulse very similar Gain with external pulse factor of 2 better in SRS The hardware differences identified up-to-now do not explain difference in sensitivity Work is in progress

12/Dec/2012SBS-Meeting23 of 24 CERN test: charge sharing

12/Dec/2012SBS-Meeting24 of 24 CERN Test: Beam Prof. - efficiency Ux : 4773 [0.955] 4821 [0.964] 4817 [0.963] : 4755 [0.951] Uy : 4399 [0.880] 4489 [0.898] 4449 [0.890] : 4384 [0.877] Dx : 4616 [0.923] 4686 [0.937] 4715 [0.943] : 4520 [0.904] Dy : 4881 [0.976] 4939 [0.988] 4927 [0.985] : 4850 [0.970] Trk: 3916 [0.783] 4142 [0.828] 4123 [0.825]