2011 MF LRG San Diego, CA FLEET READINESS CENTER SOUTHWEST Mobile Facilities Configuration & Engineering Site MSgt William Kubik Jim Sorrells / Lloyd Bjurman Naval Air Station North Island, Coronado San Diego, CA (619) LRG
2011 MF LRG San Diego, CA Site Personnel Structure : NAVAIR Rep / Logistics: - MSgt KubikMarine Liaison (CSC) - GySgt MooreAssistant Liaison (CSC) - Robert FieldsATAERO Logistics Analyst Production: - Jim SorrellsProduction Manager - David JacksonSite Supervisor - Phil CentmanEstimator/Financials - Chris SchlichtholzPurchaser/DLA Rep
2011 MF LRG San Diego, CA Site Personnel Structure : Engineering: - Lloyd BjurmanEngineering Lead - Mark BeusterMechanical Engineer - Pete VicencioElectrical Engineer -Steve WilsonElectrical Engineer
2011 MF LRG San Diego, CA
MOFAC Hazard Abatement/MF Upgrade Team VD-05 / VD-07 AECTS 480v Connectors FA-03 STS Upgrade (Karine Mouridian / Bob Pizzella) FS-01 Hazmat/Flammable Storage Explosion Proof Circuit Breakers KA-18A Rail/Trolley/Hoist Installation
2011 MF LRG San Diego, CA AECTS Layout
2011 MF LRG San Diego, CA AECTS Electrical Power Connection
2011 MF LRG San Diego, CA Solution Replace all 120/208vac connectors on the secondary side of the transformer end connectors on the two output cables, and the two power input connectors on the VD-05 and VD-07 with 480vac connectors.
2011 MF LRG San Diego, CA FA-03 STS Upgrade MALS-11Complete MALS-12Complete MALS-31Complete MALS-41Complete
2011 MF LRG San Diego, CA FA-03B
2011 MF LRG San Diego, CA FA-03B
2011 MF LRG San Diego, CA FS-01 Explosion Proof Abatement
2011 MF LRG San Diego, CA
RT/CASS
2011 MF LRG San Diego, CA RT/CASS
2011 MF LRG San Diego, CA
KA-31 OTPS Support MF Netting
2011 MF LRG San Diego, CA SEC 5824: R-134A 3 TON 30A to 40A ECU Conversion Two Kits available through the CKA Kit A1: For single R-134A ECU Conversion Kit A2: For MFs with two R-134A ECUs
2011 MF LRG San Diego, CA
CR-04 2M MF Lamp: Over 100 Ft Candles, Swivels into multiple positions ESD/Ergonomic Chairs: Lowered to accommodate taller Marines Fume Extractor: 100 CF Per Minute x 1, 3 inlets
2011 MF LRG San Diego, CA
Industrial Hygiene 2M is a NAVSEA Program: Testing on potentially hazardous residues was conducted in 1994/95 with no harmful levels detected –NAVEVNIRHLTHCEN ltr 6290Ser 33D1/003 of 3 Jan 94 –NAVAIRSYSCOM ltr 4790Ser AIR /0055 of 26 Jun 95 Test was only conducted aboard ships Looking at standardized testing for MFs – Currently in work
2011 MF LRG San Diego, CA Approved Drawings 1339AS1253 A – RIVNUT INSTALLATION 1339AS1254 B – CLIP INSTALLATION
2011 MF LRG San Diego, CA ROC LOC Changes Approved drawings show ROC LOCs to be placed between the 5 th and 6 th rivets from both the top and bottom of the MF which is a change from the 4 th and 5 th rivets. This change allows for the proper stowing of the ROC LOC without interference from the lower troop door hinge on the SOMF B.
2011 MF LRG San Diego, CA ROC LOCS
2011 MF LRG San Diego, CA RTCASS High Power
2011 MF LRG San Diego, CA KA-20B RTCHP (Bench was received in 2 sections, RT Cass side & Bridge/HP side)
2011 MF LRG San Diego, CA Updated the Photos for JOCOTAS
2011 MF LRG San Diego, CA INU
2011 MF LRG San Diego, CA MFA
2011 MF LRG San Diego, CA SOMF A
2011 MF LRG San Diego, CA SOMF B
2011 MF LRG San Diego, CA SOMF C
2011 MF LRG San Diego, CA SOMF B MOD
2011 MF LRG San Diego, CA Thank you for supporting the WARFIGHTER