ERTAC 1. P RESENTATION O VERVIEW 1. Process Overview and Timelines 2. Inputs 3. Algorithm Details 4. Results 5. Outstanding issues 2.

Slides:



Advertisements
Similar presentations
1 Data Work Group WECC - TEPPC Technical Advisory Subcommittee Meeting San Francisco, CA November 28, 2007 Jamie Austin PacifiCorp Progress Report: 2007.
Advertisements

Will CO2 Change What We Do?
NARUC 2015 Winter Meeting February 16, 2015 Combined Heat and Power and the Clean Power Plan Bruce Hedman Institute for Industrial Productivity.
ERTAC EGU MACE/MACW Case Study December 10, 2012 DRAFT - DO NOT DISTRIBUTE1.
1 John J. Conti Acting Director Office of Integrated Analysis and Forecasting Prepared for the Energy Technology System Analysis Program (ETSAP) Florence,
SPP’s 2013 Energy Consumption and Capacity 2 12% annual capacity margin requirement CapacityConsumption Total Capacity 66 GW Total Peak Demand 49 GW.
ERTAC EGU Growth Model Executive Summary September
Draft-Version #17 12/20/10 1 Preprocessing Steps: These steps can be done prior to the algorithm calculation loop beginning. PS1-Data input from BY CAMD.
Draft-Version #19 5/15/13 Preprocessing Steps: These steps can be done prior to the algorithm calculation loop beginning. PS1-Data input from BY CAMD Hourly.
Modeling Choices & Approaches Key Model Outputs: Carbon emissions Other emissions Electricity prices Total electricity system costs Fuel use and diversity.
Review May 7 th, 8 th 2009 Model Overview Presented by Walter Short Stochastic Energy Deployment System (SEDS)
ERCOT PUBLIC 8/19/ LTSA Scenario Results Updates August, 2014.
CHEAPER AND CLEANER: Using the Clean Air Act to Sharply Reduce Carbon Pollution from Existing Power Plants, Delivering Health, Environmental and Economic.
Integrated Planning Model (IPM) What It Is, Who Uses It, How It Works, What It Can Show You Presentation for For the Clean Air Act Advisory Committee Permits/New.
National Renewable Energy Laboratory Innovation for Our Energy Future * NREL July 5, 2011 Tradeoffs and Synergies between CSP and PV at High Grid Penetration.
Long Term Study Task Force Update to ETWG ERCOT Long-Term Study: Scenarios, New Software, and Emerging Technology Assumptions January 27, 2012.
ERTAC EGU Growth Code “Proof of Concept” USEPA Briefing Washington, DC December,
CLEAN ENERGY TO PROMOTE CLEAN AIR & IMPROVE ELECTRICITY PRICE STABILITY Alden Hathaway, ERT Debra Jacobson, GWU Law School April 6, 2006.
Status of ERTAC EGU Growth Committee September 16 th 2013.
Gas Development Master Plan Structure of the Demand and Supply Scenarios (DASS) Component Capacity Building Workshop Bali, 1-2 July 2013.
2018 CO 2 Emission Projections for the SESARM States Prepared by: Byeong-Uk Kim, Jim Boylan, and Keith Bentley GA EPD – Air Protection Branch October 22,
1 EPA Plans/Projects Involving Projections Marc Houyoux, US EPA Presentation to the RPO National Workgroup November 4-6, 2004 St. Louis, Missouri.
Highlights of AESC 2011 Report Vermont Presentation August 22, | ©2011 Synapse Energy Economics Inc. All rights reserved.
Jenell Katheiser Doug Murray Long Term Study Scenarios and Generation Expansion Update January 22, 2013.
ERTAC 1DRAFT - DO NOT DISTRIBUTE. Presentation Overview 1.Process Overview and Timelines 2.Inputs 3.Algorithm Details 4.Results 5.Outstanding issues 2DRAFT.
Did the recession impact recent decreases in observed sulfate concentrations? Shao-Hang Chu, US EPA/OAQPS/AQAD October, 2011.
Federal Aviation Administration ATO Future Schedule Generation Performance Analysis and Strategy January 27, 2010.
ERTAC EGU Growth Tool Stakeholder Rollout Lake Michigan Air Directors(LADCO) Rosemont, IL May 20 th,
Grayson Rural Electric Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis Department.
Long-Term Electricity Report 1 Susan Gray September 27, 2010.
Preparation of Control Strategies October 18, 2007 NAAQS RIA Workshop Darryl Weatherhead, Kevin Culligan, Serpil Kayin, David Misenheimer, Larry Sorrels.
DORIS MCLEOD AIR QUALITY PLANNER VIRGINIA DEQ 804/ ERTAC Tool Logic and Flowcharts.
Summary of WRAP 2004 Work Plan WRAP Board Meeting October 14, 2003 Salt Lake City, UT.
Stationary and Area Source Committee Update OTC Committee Meeting September 13, 2012 Washington, D.C. Hall of the States 1.
OTR Results ERTAC EGU –RESULTS WEBINAR May 16,
Johnthescone The IPCC Special Report on Renewable Energy Sources and Climate Change Mitigation UN Climate Change Conference June 2011 Bonn, Germany, 7.
ERTAC Growth Approach - EGUs ERTAC-EGU Development Group - Webinar May 16, 2013 Robert Lopez, WI-DNR - Presenter.
Presented to Time of Day Subcommittee May 9, 2011 Time of Day Modeling in FSUTMS.
Kevin Hanson Doug Murray Jenell Katheiser Long Term Study Scenarios and Generation Expansion Update April, 2012.
Johnthescone The IPCC Special Report on Renewable Energy Sources and Climate Change Mitigation.
1 OTC Regional Attainment Strategy Danny Wong OTC November 2005 Meeting Wilmington, DE.
Clean Air Interstate Rule (CAIR) CAIR Model Cap and Trade Rules: Unique Elements and Flexibilities Office of Air and Radiation March 2005.
1 Public Power Looking to Participate in New Coal Generation Public power communities are very concerned about affordable electricity and –Coal is the.
TAC02/01/2007 DW 1 TAC Briefing on: - Report on Constraints and Needs: Five Year Plan Development - Long Term System Assessment (LTSA) - Entergy Integration.
On/Off Operation of Carbon Capture Systems in the Dynamic Electric Grid On/Off Operation of Carbon Capture Systems in the Dynamic Electric Grid Rochelle.
Economic Assessment of Implementing the 10/20 Goals and Energy Efficiency Recommendations – Preliminary Results Prepared for : WRAP, AP2 Forum Prepared.
NENG-Combined Cycle, New Unit Hierarchy, and Growth Rates.
EMISSIONS INVENTORY UPDATE Briefing for OTC Committees and Stakeholder Meeting September 13, 2012 Washington, DC Julie McDill & Susan Wierman 1.
Draft-Version #18 9/13/11 1 Preprocessing Steps: These steps can be done prior to the algorithm calculation loop beginning. PS1-Data input from BY CAMD.
EGU Forecasting Tool (Data Elements) Office of Air Quality (800) John Welch Senior Environmental Manager IDEM.
Draft Seventh Power Plan Meets RTF. Key Finding: Least Cost Resource Strategies Rely on Conservation and Demand Response to Meet Nearly All Forecast Growth.
11 Regional Renewable Energy Study Review of Findings and Forecasts Presented to: Climate, Energy and Environment and Policy Committee Metropolitan Washington.
 Ensure utilities plan for and provide services by which Missouri’s residents and businesses can achieve their goals with less energy over time, with.
Pennsylvania Electric Supply GHG Forecast 1 Victoria Clark Stockholm Environment Institute - US Center 5/29/09.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Generating Resource Advisory Committee Meeting.
Forecasting Power System Hourly Load and Emissions for Air Quality Modeling ERTAC-EGU Model Development Group – Webinar & Outreach slides Robert.
Kenneth Silver Los Angeles Department of Water & Power
LNBA Subgroup: Avoided Transmission Value
Overview of WRAP Emissions Projections
NSPS Rulemakings for Greenhouse Gas Emissions
Industrial Assessment Center Database
Demand Response in the 7th Power Plan
A Collaborative Process to Develop a 2016 Emissions Modeling Platform
EPA’s Power Sector Projections Use of 2016 Data
EPA Office of Air Quality Planning and Standards
ERTAC EGU Overview For the 2016 EGU workgroup
EGU Workgroup: 2016 beta Approach: Status: Next Steps / Milestones:
Patrick Cummins January 30, 2019.
J. Cofala Z. Klimont CIAM/IIASA
Western Regional Haze Planning and
Presentation transcript:

ERTAC 1

P RESENTATION O VERVIEW 1. Process Overview and Timelines 2. Inputs 3. Algorithm Details 4. Results 5. Outstanding issues 2

1. P ROCESS O VERVIEW AND T IMELINES a. What is the ERTAC Growth Committee? b. Criteria for product c. Committee structure d. Progress & Timeline 3

W HAT ARE WE TRYING TO ACCOMPLISH ? Develop Methodology to Create EGU FY Emission Inventories that meets certain criteria: Conservative predictions of unit activity Relies primarily on state knowledge of unit retirement, fuel switching & controls Can be re-run iteratively to look a variety of scenarios Transparent Inexpensive Relies on base year activity data Flexible 4

ERTAC EGU G ROWTH Eastern Regional Technical Advisory Committee Collaboration: NE, Mid-Atlantic, Southern, and Lake Michigan states Industry Multi-jurisdictional organizations Why are certain states in yellow? Are they participating in ETAC EGU? 5

S UBCOMMITTEES AND C O -C HAIRS ERTAC EGU Growth Committee Co-chairs: Laura Mae Crowder, WV DEP Bob Lopez, WI DE Danny Wong, NJ DEP Four Subcommittees and Leads: Implementation/ Mark Janssen, LADCO: Create logic for software Growth/ Bob Lopez, WI & Laura Mae Crowder, WV: Regional specific growth rates for peak and off peak Data Tracking/ Wendy Jacobs, CT: Improve default data to reflect state specific information Renewables & Conservation Programs/ Danny Wong, NJ & Laura Boothe, NC: Characterize programs not already included in growth factors 6

S TATE I NVOLVEMENT Regional lead identified per RPO to coordinate their state review of model and inputs. EGU representative identified in each state for QA of the input files. These representatives will also review the output to provide guidance If Future Year (FY) emission goals are not met given known controls, states will indicate what strategy will be applied to meet the goal. 7

P ROGRESS S O F AR.... Model Development: Methodology created, documentation crafted Preprocessor & projection running on Linux and Windows (GA, VA, MARAMA, IN, NJ, OTC) Developing postprocessing software Estimating Growth in Generation: Growth rates and regions defined Updating with current Annual Energy Outlook (AEO)

P ROGRESS S O F AR.... Input File Development: Unit file and future controls file reviewed by states Cap files are being converted to use CAIR caps Further state input ongoing Results: Ran through first iterations of the postprocessor Distributed to member states for review 9

ERTAC T IMELINE September - October, 2012 Initial multi-state test runs Review output, revise and rerun Present results to states for comment November, 2012 Present to full ERTAC Committee Present model and results to USEPA Future tasks Develop AEO 2012 growth factors Develop new base year

D ATA I MPORTATION a. Inputs b. Preprocessing c. Growth Rates 11

ERTAC I NPUTS Starting Point: BY CAMD activity data Gross load hourly data, unit fuel, unit type, location Units categorized by: Fuel Type [Boiler Gas, Oil, Simple Cycle, Combined Cycle, Coal] Region [AEO regions (e.g. MACE, LILC, WOMS)] States review provides known new units, controls, retirements, fuel switches, etc EIA AEO growth factors NERC peak growth factors 12

P REPROCESSING F UNCTIONS Data Edit Checks Unit availability file Controls file Growth rates file BY hourly CAMD data Removes non-EGUS Determines hourly temporal hierarchy Based on regional hourly GL Important for load distribution and growth rates 13

P REPROCESSING F UNCTIONS Assigns hourly usage profile for FY to new units Assesses partial year reporting units Creates unit hierarchies for growth distribution For every hour, calculates load specific values by region and fuel/unit type Retired generation New unit generation Existing generation Calculates “non peak” growth rates “Load specific values” seems vague, what do we mean by that? Add page numbers 14

G ROWTH R ATES Peak GR = 1.07 Annual GR = 0.95 Transition hours of 200 & 2,000 Non Peak GR = (calculated) 15

G ROWTH R ATES (GR) Hour specific growth rates allow program to adjust temporal profile of unit based on regional and fuel/unit type hourly growth profiles Resulting FY profile might different from BY Provides ability to understand effects of peak episodic GR and control programs on air quality AEO Growth combined with NERC peak growth Peak Growth – First 200 hour in hierarchy Transition growth – hours in hierarchy Non-peak growth – last remaining hours in hierarchy out to 8760 hours. Combined factor is further adjusted to account for: Retirements & new units. 16

T HE EVOLUTION OF GROWTH RATES FROM AEO2010 ANNUAL TO HOURLY 17

3. A LGORITHM D ETAILS a. Regional modularity b. Adjusted FY Growth Rates c. Excess generation pool d. Generic units e. New Unit Utilization f. Spinning Reserve 18

R EGIONAL M ODULARITY Each ERTAC region analyzed independently Reserve analyzed on a regional basis Algorithm determines if capacity has been met for each hour for the region and fuel/unit type Use new units For all ERTAC Regions For all Fuel/Type Bins Analyze capacity versus demand Assign generation Spinning Reserve 19

A DJUSTED F UTURE Y EAR G ROWTH R ATES (AFYGR), H OUR S PECIFIC For every region and fuel/unit type, each hour has a variable value for: Total FY Load (Hour Specific GR * BY Load=FY Gen) Total Retired Generation (RetGen) Total New Unit Generation (NU Gen) GR for each hour adjusted before application to existing unit hourly BY loads! AFYGR = (FY Generation – NU Gen) (BY Generation – RetGen) 20

E XCESS G ENERATION P OOL If unit growth exceeds capacity Unit is limited to capacity Demand beyond capacity added to the excess generation pool for that hour/region/ fuel/unit type bin The pool is distributed to other units in unit allocation hierarchy order Units receive power up to optimal threshold or max capacity in two distribution loops Power distribution ceases when pool is depleted or all units are at capacity (generic unit must be created to meet demand) 21

N EW G ENERIC U NITS Added to meet demand Utilization determined on a fuel/unit type basis, similar to new state supplied units Receive unmet demand Size/location of generic units adjustable FY temporal profile assigned by region and fuel/unit type If a generic unit is added, the allocation hierarchy is recalculated and the loop begins at the first hour First/next hour in the hierarchy Does capacity meet demand? Add generic unit Reallocate unit order Begin at first hour in the hierarchy Y N 22

N EW U NIT U TILIZATION New units receive generation from the excess generation pool Annual power production limited by default or state input Temporal profile based on similar unit (mimic) — program allows user to change the “mimic” unit New units (generic and state supplied) are high in utilization relative to other similar units because assumed to be: Very efficient Very clean Variables assigned to region and fuel/unit type characteristics are adjustable 23

S PINNING R ESERVE CHECK Following assignment of generation Check if reserve capacity is available for each hour in each region If in any hour there is not reserve capacity equal 100% of the capacity of the largest unit operating of any fuel type, a flag is raised Determine reserve capacity needs for that hour Is unused capacity > reserve capacity ? Y N Alert: More capacity needed First/next hour 24

R ESULTS a. Output b. Examples c. Runtime 25

O UTPUT /R ESULTS Future year hourly activity Heat input (mmbtu) Gross load (MW) SO2 emissions (lbs) NOx emissions (lbs) File includes 8,760 hours for each: Existing unit that is not retired New state supplied unit New generic unit created by the code Summary files Post-projection processing: graphs, more summaries, etc 26

O UTPUT FROM ERTAC EGU V1 Unit level Overall output 27

E XAMPLE : C OAL F IRED E XISTING U NIT, 800 MW A NNUAL GR=1.018, P EAK GR=1.056, N ONPEAK GR=

E XAMPLE : C OAL F IRED E XISTING U NIT, 800 MW ( ZOOM IN VIEW ) A NNUAL GR=1.018, P EAK GR=1.056, N ONPEAK GR=1.012 Something wrong with the X axis 29

E XAMPLE : C OAL F IRED E XISTING U NIT, 800 MW – SO2 C ONTROL A NNUAL GR=1.018, P EAK GR=1.056, N ONPEAK GR=

E XAMPLE : C OMBINED C YCLE N EW U NIT, 300 MW A NNUAL GR= 0.904, P EAK GR=1.2, N ONPEAK GR=

E XAMPLE : S IMPLE C YCLE E XISTING U NIT, 53 MW A NNUAL GR=1.39, P EAK GR=1.549, N ONPEAK GR=

P OST - PROJECTION P ROCESSING G RAPHICAL O UTPUT – P AGE 1 E XAMPLE 33

P OST - PROJECTION P ROCESSING G RAPHICAL O UTPUT – P AGE 2 E XAMPLE 34

V ER. 1 SUMMARY RESULTS – ALL REGIONS Heat Input SO2 Emissions NOX Emissions Generation 35

I N SUMMARY The model has been built Inputs are being refined Output has been generated Work is needed to evaluate output Partial Year Reporters Generic units New growth factors based on AEO 2012 are needed Scenarios can be built to evaluate policy 36