1 Naruki Wakabayashi Shimizu Corporation Tokyo Japan Study on the Jointed Rock Mass for the Excavation of Hyper-KAMIOKANDE Cavern at Kamioka Mine NNN07.

Slides:



Advertisements
Similar presentations
FE analysis with beam elements
Advertisements

Samrat Mohanty, PhD, PE, Senior Engineer, Agapito Associates, Inc
Chapter 3 Mechanical Properties of Materials
Structural Geology Crustal Deformation
Mechanics of Materials – MAE 243 (Section 002) Spring 2008
Design Parameters.
Chapter 9 – FOLDS, FAULTS & GEOLOGIC MAPS
1 FEM study of the faults activation Technische Universität München Joint Advanced Student School (JASS) St. Petersburg Polytechnical University Author:
Distribution of Microcracks in Rocks Uniform As in igneous rocks where microcrack density is not related to local structures but rather to a pervasive.
MechaRock International Consultants Modeling Fractured Rocks with the Finite Element code DISROC About Disroc DISROC is a Finite Element.
Lecture 7 Mechanical Properties of Rocks §Rock properties: mass density, porosity, and permeability §Stress §Mohr's circle §Strain §Elasticity of rocks.
Dynamic Earth Class February 2005.
Leaning objectives Axial Stress
Finite Element Method in Geotechnical Engineering
Rock Deformation and Geologic Structures
SOIL, GEOTECHNICAL ENGINEERING AND FOUNDATION ENGINEERING
A Comparison of Numerical Methods and Analytical Methods in Determination of Tunnel Walls Displacement Behdeen Oraee-Mirzamani Imperial College London,
Analyses of tunnel stability under dynamic loads Behdeen Oraee; Navid Hosseini; Kazem Oraee 1.
LAGUNA at Fréjus LAGUNA/LAGUNA-LBNO General Meeting March 3 th -5 th, 2011, CERN Eng. Francesco Amberg.
Finite Element Modeling and Analysis with a Biomechanical Application Alexandra Schönning, Ph.D. Mechanical Engineering University of North Florida ASME.
CSM/CNA UNO R&D Proposal Lee Petersen –CNA Consulting Engineers Mark Kuchta –Colorado School of Mines Requested budget: $200k/year for two years Cavern.
Evaluating paleoseismic ground motions using dynamic back analysis of structural failures in archaeological sites Ronnie Kamai (1), Yossef Hatzor (1),
We greatly appreciate the support from the for this project Interpreting Mechanical Displacements During Hydromechanical Well Tests in Fractured Rock Hydromechanical.
Rheology I. Rheology Part of mechanics that deals with the flow of rocks, or matter in general Deals with the relationship of the following: (in terms.
Shimizu Corporation Tokyo Japan
Induced Slip on a Large-Scale Frictional Discontinuity: Coupled Flow and Geomechanics Antonio Bobet Purdue University, West Lafayette, IN Virginia Tech,
General meeting LAGUNA LAGUNA – Fréjus site
LCWS2013 (Asian Region) CFS 12th November Experimental Hall 3D deformation analysis Asian Region Design CONVENTIONAL FACILITIES AND SITING.
Folds, Faults, and Geologic Maps
Poisson’s Ratio For a slender bar subjected to axial loading:
One of the most important fields in engineering Mechanics.
In Situ Stabilization of Pavement Base Courses Roads Pavement Forum Thursday, May 17, 2001.
Pre-Excavation Rock Evaluation 1)Goal- Excavate the largest possible safe and stable detector chamber 2) Procedure a) measure characteristics of the rock.
Poisson’s Ratio For a slender bar subjected to axial loading:
A Study of the Effect of Imperfections on Buckling Capability in Thin Cylindrical Shells Under Axial Loading Lauren Kougias.
DESIGN AND CONSTRUCTION OF A MODULAR MASSIVE DETECTOR AT THE HOMESTAKE LAB Modular Mass – 100 Kilotons Modular Shape –Cylinder –50m dia x 50m high Depth.
CTC / MTC 222 Strength of Materials Chapter 1 Basic Concepts.
Faults as fluid flow barriers and their role in trapping hydrocarbons Grp 2.
Lecture 7 Mechanical Properties of Rocks
-Kazem Oraee (Prof) - Arash Goodarzi (Eng) - Nikzad Oraee-Mirzamani (Phd) -Parham Khajehpour (Eng) 34th International Conference on Ground Control in Mining.
Strength of Material-1 Introduction. Dr. Attaullah Shah.
Project Site Description Area – 2,30,327 m 2 Global Position – Between N ’20” to N ’71” and E ’50” to E ’80” Elevation – +14.5m.
-Elastic Properties of Solids AP Physics C Mrs. Coyle.
February 13-15, 2006 Hydromechanical modeling of fractured crystalline reservoirs hydraulically stimulated S. Gentier*, X. Rachez**, A. Blaisonneau*,
EUROPEAN GEOSCIENCES UNION GENERAL ASSEMBLY 2014 Geology Institute of Azerbaijan National Academy of Sciences 1 DENSITY VARIABILITY - FUNDAMENTAL BASIS.
structural geology & mountain building
Hoover Dam Construction. Geological Context Canyon’s tilted layers of andersite breccias Extrusive igneous rock Minerals - plagioclase, pyroxene & hornblende.
Presentation 5 Phase B - Fatigue & Fracture Studies S. J. Jung 1.
 All civil engineering projects like dams, reservoirs etc. constructed on earth crust and constructed by material obtained from the crust.  So it is.
Laguna Site Investigation Geological and Geotechnical Models Petteri Somervuori, Espoo,
SITE INVESTIGATION ARUN MUCHHALA ENGINEERING COLLEGE-DHARI
State of Stress at the depth of planned Laguna Caverns in Pyhäsalmi Matti Hakala, Espoo,
Clemson Hydro Deformation of Solids. Clemson Hydro Tensile test.
Development and Application of High Strength FRP Pipes as Grouted- Reinforcing Members in Slope and Tunnel KSCE Annual Conference and Civil Expo 2004 Daewon.
Buckling in aircraft structures
Finite Element Method in Geotechnical Engineering
Advanced Geotechnical Engineering
Poisson’s Ratio For a slender bar subjected to axial loading:
Lecturer: Dr. Frederick Owusu-Nimo
SOIL, GEOTECHNICAL ENGINEERING AND FOUNDATION ENGINEERING
Mechanics of Biomaterials
GEOLOGICAL STRUCTURES
Contents Introduction Identification of the knowledge gap
Poisson’s Ratio For a slender bar subjected to axial loading:
CHAPTER THREE DISCONTINUITIES
Poisson’s Ratio For a slender bar subjected to axial loading:
Numerical Analysis of slopes
MOUNTAIN BUILDING AND EVOLUTION OF CONTINENTS
Graduation Project Bracing system for deep excavation.
Presentation transcript:

1 Naruki Wakabayashi Shimizu Corporation Tokyo Japan Study on the Jointed Rock Mass for the Excavation of Hyper-KAMIOKANDE Cavern at Kamioka Mine NNN07 Hamamatsu, Japan 3-5 October 2007

2 Topics ・ Previous Geological Survey and Stability Analysis for the Hyper-K cavern ・ Site Selection ・ Isotropic Elastic FEM Analysis for the Investigation of Cavern Shape, Size and Type ・ Ongoing Investigation and Analysis for Jointed Rock Mass ・ Investigation of Joint Orientation ・ Obtaining In-Situ Rock Joints and Investigation of Joint Mechanical Properties ・ Pull-out Test of Two Types of Cable Bolt ・ Two Type Analysis to Consider the Influence of Joint and Support System

3 Mozumi mine Tochibora mine Proposed Area Kamioka Mine Location Kamioka Mine Hamamatsu Tokyo Super-K Proposed Area in Mozumi Mine is about 10km South from the Super-Kamiokande. Site Selection

4 Hyper-K proposed Site Hornblende Biotite Gneiss & Migmatite Biotite Gneiss Limestone ”ANKO” Fault ”240 ゜ - ME” Fault ”NAMARI” Fault Skarn Orebody Zone Core Boring ExistingTunnelSurveyed Geological Map of Proposed Site at Tochibora Mine Plan View of + 550mEL N Proposed Site Formation is Hornblende Biotite Gneiss and Migmatite. 100m

5 Cylindrical Dome Larger than Super-K Huge Tunnel Comparison of the Hyper-K Cavern from Various View Points Two Parallel Tunnels Isotropic Elastic FEM Analysis Image Design of Two 250m Long Parallel Tunnels Spacing Offset ”NAMARI” Fault ”ANKO” Fault ”240°-ME” Fault

6 Summary of Previous Study Site Selection : Tochibora Mine, +480mEL~+550m EL is the most appropriate location with very competent rock condition. Cavern Design: Two 250m Long Parallel Tunnels with Section of 2,076m 2 are capable of being safely excavated. This Type is possible to continue observation during Maintenance. Cavern Layout : Two Parallel Tunnels as above should be Located with 80m –100m (about 2 Diameter Distance) Spacing and 50m-100m Offset to avoid the poor Zone of Surrounding Faults. In Isotropic Elastic FEM Analysis of Previous Study, Young’s Modulus was empirically decreased as Jointed Rock Mass. It is Important and Necessary to Consider the Influence of Joint Orientation and Mechanical Properties Numerically.

7 Analysis for Jointed Rock Mass Anisotropic Young’s Modulus Considering Joint Orientation and Mechanical Properties Composition of Elastic Blocks Surrounding Joints Equivalent Continuum Analysis Discontinuous Analysis Damage Tensor Crack Tensor Key Block Distinct Element Method (DEM) ・ Characteristics of Joint Orientation ・ Mechanical Properties of Joint and Rock Core ・ Mechanical Properties of Support such as Cable Bolt

8 Investigation of Jointed Rock Mass Pull-out Tests of Cable bolt (6 Places) Obtaining Rock Joint (3 Places) +550m EL N Rock Classification B Very Good CH Good CM Medium Measurement of Joint Orientation in this Existing Tunnel Rock Types Gneiss Migmatite

9 Investigation of Joint Orientation ・ Major Joint Set : Strike E-W and Dip ±70 ~ 90° ・ Another Joint Set : Strike NE-WS and Dip ±40 ~ 50° Projection of Poles Pole Density Contours Gneiss Migmatite N W S E N W S E N W S E N W S E N S W E Strike Dip Pole Joint ×

10 Situation of Obtaining In-Site Rock Joints Recovered Core with Joint Diamond Drilling Joint

11 ・ Joint Deformability Parameters such as Normal and Shear Stiffness, Dilatancy Angle ・ Joint Shear Strength such as Cohesion and Internal Friction Angle Normal Stress Shear Displacement Joint Mechanical Properties Direct Shear Test of Rock Joints Shear Test Equipment (Normal and Shear load are 1MN) Rock Joint Specimen with extensometers

12 σn=10N/mm 2 Normal Stiffness =67N/mm 2 /mm Normal Displacement (mm) Normal Stress (N/mm 2 ) Di l atancy angle=2.4° Shear Displacement (mm) Normal Displacement (mm) Normal Stress (N/mm 2 ) Shear Strength (N/mm 2 ) Cohesion=0.57N/mm 2 Internal Friction angle =33° Results of Direct Shear Test Shear Displacement (mm) Shear Stress (N/mm 2 ) Shear Stiffness=60N/mm 2 /mm Shear Strength

13 Pull-Out Test of Two Type Cable Bolts Economical Support System should be used ・ Usual Support System for Large Cavern is Rock Anchor → Expensive ・ Proposed Support System is Rock Bolt and Cable Bolt → Economical ・ Special Cable Bolt with Dimples has very high Strength ・ Mechanical Properties of Cable bolt was estimated by Pull-Out Test Usual Cable Bolt without Dimples ( PC-Cable Bolt ) Special Cable Bolt with Dimples ( ST-Cable Bolt )

14 Situation of Pull-Out Tests PC-Cable bolt ST-Cable Bolt Jock and Dial Gauge Pressure Pump Diamond Drilling Inserting Cable Bolts Pull-Out Test Setting up Equipments

15 Results of Pull-Out Tests ST PC Displacement (mm) Load (kN) Gneiss (B) ST PC Displacement (mm) Load (kN) Migmatite (B) Strength (kN/m) Stiffness (kN/m/m) ST PC □Gneiss (B) ◇ Migmatite(B) □Gneiss (B) ◇ Migmatite(B) △ Gneiss (CH) ○Migmatite(CH) △ Gneiss (CH) ○Migmatite(CH) PC Strength above 53kN/m Stiffness above 40MN/m/m ST Strength above 270kN/m Stiffness above 53MN/m/m Stiffness (kN/m/m) Strength (kN/m) Cable bolt model

16 Mechanical Properties of Intact Rock CoreMigmatiteGneiss Compressive Strength (N/mm 2 ) Young’s Modulus (kN/mm 2 ) Poisson’s Ratio Density (MN/m 3 )0.027 Mechanical Properties Properties for Analysis Rock Mass (Same as Intact Rock) Young’s Modulus=64.3 kN/mm 2 Poisson’s Ratio=0.25 Density=0.27NM/m 3 Joint Normal Stiffness=67N/mm 2 /mm Shear Stiffness=60N/mm 2 /mm Dairatancy Angle=2.4° Cohesion=0.57N/mm 2 Internal Frictional angle=33° ST-Cable BoltShear Strength= 270kN/m Shear Stiffness=53MN/m/m PC-Cable BoltShear Strength= 53kN/m Shear Stiffness=40MN/m/m

17 Analysis Cases Support In-Situ Stress Case 1 Without Support Isotropic Stress σH=σv=14.4 ( N/mm 2 ) (Overburden:500m) Case 2 Rock Bolt (Length=6m :Space=2m) Double PC-Cable Bolt (Length=15m :Space=2m) Case 3 Rock Bolt (Length=6m :Space=2m) Double ST-Cable Bolt (Length=15m :Space=2m) Discontinuous Analysis by DEM DEM Analysis is Performed to Establish the Behavior of Jointed Rock Mass and the Effect of Support System. Cavern Direction is East and West Huge Tunnnel W48m×H54m 2070m 2 Cavern Shape and Direction Joint Strike

18 200m Strike E-W Dip ±70 ~ 90° (Major Joint Set) Procedure of Analysis Establishing Support System after Each Excavation Step First Step Second Step Third Step Fourth Step Analysis Model 200m Strike NS-WS Dip ± 40 ~ 50° (Another Joint Set) Joints are Generated Statistically According to the Joint Orientation

19 Displacement Vector and Cable Axial Force Case 3: RB+ST-Cable Bolt (Double) Displacement of Right and Left Side Wall are nearly same because of Symmetrical Joint Dip Angle (±70 ~ 90°). Displacement of Case-3 is smaller than Case-2 because of Support Effect of ST Cable Bolts Case 1 : Without Support ( kN ) ( kN ) (mm) Case 2 : RB+PC-Cable Bolt (Double)

20 Equivalent Continuum Analysis by Crack Tensor Model X Z Cavern shape and Region (528m×528m ) 240m 48m 240 m 234m 54m Huge Tunnnel W48m×H54m 2070m 2 Crack Tensor Analysis is Performed to Estimate the Relation between Tunnel Direction and Joint Orientation. In-Situ Stress is Isotropic σH=σv=14.4 ( N/mm 2 ) Case 1:Cavern Direction is East and West, parallel to Joint Strike Case 2:Cavern Direction is North and South, right-angled to Joint Strike Case 1 Case 2 Joint Strike

21 Displacement Case 1 Case 2 Joint Strike Side Wall Displacement of Case 1 is 2 times Larger than Case 2 because of influence of Joint Strike Direction.

22 Summary Joint Orientation : At Proposed Site in Tochibora Mine, Major Joint Set Strike Direction is E-W and Dip Angle is ±70 ~ 90° Joint Properties : Normal and Shear Stiffness, Shear Strength are Estimated. Cable Bolt Properties : Shear Strength and Stiffness of ST and PC Cable Bolt are Estimated. Shear Strength of ST-Cable Bolt is 5 Times Higher than PC-Cable Bolt. ST-Cable Bolt is very Effective Support. Results of Analysis : Discontinuous and Equivalent Continuum Analysis are able to Estimate the Effect of Rock Support System and the Anisotropic Behavior of Jointed Rock Mass. Joint Orientation is very Important factor to decide the Cavern Direction. Further Investigation : It is Necessary for Estimation of Accurate Joint Orientation to investigate in Different Direction Tunnel or Bore Hole Additionally. Measurements of In-Situ Initial Stresses and In-Situ Tests on Rock Mass Deformability are indispensable.

23 END