12/5/2013 1 PHENIX WEEKLY PLANNING Dec. 5, 2013 Don Lynch.

Slides:



Advertisements
Similar presentations
10/03/ PHENIX WEEKLY PLANNING Oct. 3, 2013 Don Lynch.
Advertisements

4/11/20131 PHENIX WEEKLY PLANNING 4/11/2013 Don Lynch.
2/6/ PHENIX WEEKLY PLANNING Feb. 6, 2014 Don Lynch.
12/12/ PHENIX WEEKLY PLANNING Dec. 12, 2013 Don Lynch.
8/22/ PHENIX WEEKLY PLANNING Aug. 22, 2013 Don Lynch.
10/17/ PHENIX WEEKLY PLANNING Oct. 17, 2013 Don Lynch.
5/2/ PHENIX WEEKLY PLANNING 5/2/2013 Don Lynch.
6/7/20121 PHENIX WEEKLY PLANNING 6/7/2012 Don Lynch.
9/26/ PHENIX WEEKLY PLANNING Sep. 26, 2013 Don Lynch.
1/30/ PHENIX WEEKLY PLANNING Jan. 30, 2014 Don Lynch.
9/6/20121 PHENIX WEEKLY PLANNING 9/6/2012 Don Lynch.
7/11/ PHENIX WEEKLY PLANNING 7/11/2013 Don Lynch.
10/31/ PHENIX WEEKLY PLANNING Oct. 31, 2013 Don Lynch Happy Halloween!
2/9/20121 PHENIX WEEKLY PLANNING 2/9/2012 Don Lynch.
10/10/ PHENIX WEEKLY PLANNING Oct. 10, 2013 Don Lynch.
4/4/20131 PHENIX WEEKLY PLANNING 4/4/2013 Don Lynch.
6/6/ PHENIX WEEKLY PLANNING 6/6/2013 Don Lynch Note: No PHENIX planning meeting this week due to end of run party. Feel free to discuss safety and.
5/23/20131 PHENIX WEEKLY PLANNING 5/23/2013 Don Lynch.
6/27/ PHENIX WEEKLY PLANNING 6/27/2013 Don Lynch.
1/5/20121 PHENIX WEEKLY PLANNING 1/5/2012 Don Lynch.
8/2/20121 PHENIX WEEKLY PLANNING 8/2/2012 Don Lynch.
5/9/ PHENIX WEEKLY PLANNING 5/9/2013 Don Lynch.
11/7/ PHENIX WEEKLY PLANNING Nov. 7, 2013 Don Lynch.
8/9/20121 PHENIX WEEKLY PLANNING 8/9/2012 Don Lynch.
7/18/ PHENIX WEEKLY PLANNING 7/18/2013 Don Lynch.
10/11/20121 PHENIX WEEKLY PLANNING 10/11/12 Don Lynch.
6/20/ PHENIX WEEKLY PLANNING 6/20/2013 Don Lynch.
12/26/2013-1/2/ PHENIX WEEKLY PLANNING Dec. 26, Jan. 2, 2014 Don Lynch.
3/14/20131 PHENIX WEEKLY PLANNING 3/14/2013 Don Lynch.
12/22/20111 PHENIX WEEKLY PLANNING 12/22/2011 Don Lynch.
8/1/ PHENIX WEEKLY PLANNING Aug. 1, 2013 Don Lynch.
12/29/20121 PHENIX WEEKLY PLANNING 12/29/2011 Don Lynch.
11/14/ PHENIX WEEKLY PLANNING Nov. 14, 2013 Don Lynch.
9/13/20121 PHENIX WEEKLY PLANNING 9/13/2012 Don Lynch.
1/9/ PHENIX WEEKLY PLANNING Jan. 9, 2014 Don Lynch.
7/19/20121 PHENIX WEEKLY PLANNING 7/19/2012 Don Lynch.
11/15/20121 PHENIX WEEKLY PLANNING 11/15/12 Don Lynch.
1 PHENIX WEEKLY PLANNING December 3, 2015 Carter Biggs.
8/29/ PHENIX WEEKLY PLANNING Aug. 29, 2013 Don Lynch.
3/6/ PHENIX WEEKLY PLANNING March 6, 2014 Don Lynch.
10/18/20121 PHENIX WEEKLY PLANNING 10/18/12 Don Lynch.
5/1/ PHENIX WEEKLY PLANNING May 1, 2014 Don Lynch.
11/8/20121 PHENIX WEEKLY PLANNING 11/8/12 Don Lynch.
1 3/10/2011 PHENIX WEEKLY PLANNING 3/10/2011 Don Lynch.
9/27/20121 PHENIX WEEKLY PLANNING 9/27/2012 Don Lynch.
1 PHENIX WEEKLY PLANNING January 21, 2016 Carter Biggs.
3/22/20121 PHENIX WEEKLY PLANNING 3/22/2012 Don Lynch.
2/14/20131 PHENIX WEEKLY PLANNING 2/14/2013 Don Lynch.
4/24/ PHENIX WEEKLY PLANNING April 24, 2014 Don Lynch.
5/16/ PHENIX WEEKLY PLANNING 5/16/2013 Don Lynch.
3/20/ PHENIX WEEKLY PLANNING March 20, 2014 Don Lynch.
4/17/ PHENIX WEEKLY PLANNING April 17, 2014 Don Lynch.
12/6/20121 PHENIX WEEKLY PLANNING 12/6/12 Don Lynch.
6/28/20121 PHENIX WEEKLY PLANNING 6/28/2012 Don Lynch.
5/8/ PHENIX WEEKLY PLANNING May 8, 2014 Don Lynch.
5/24/20121 PHENIX WEEKLY PLANNING 5/24/2012 Don Lynch.
7/12/20121 PHENIX WEEKLY PLANNING 7/12/2012 Don Lynch.
12/19/ PHENIX WEEKLY PLANNING Dec. 19, 2013 Don Lynch.
7/25/ PHENIX WEEKLY PLANNING 7/25/2013 Don Lynch.
12/20/20121 PHENIX WEEKLY PLANNING 12/20/12 Don Lynch.
12/15/20111 PHENIX WEEKLY PLANNING 12/15/2011 Don Lynch.
5/30/20131 PHENIX WEEKLY PLANNING 5/30/2013 Don Lynch.
3/7/20131 PHENIX WEEKLY PLANNING 3/7/2013 Don Lynch.
12/08/20111 PHENIX WEEKLY PLANNING 12/08/2011 Don Lynch.
2/27/ PHENIX WEEKLY PLANNING Feb. 27, 2014 Don Lynch.
4/18/20131 PHENIX WEEKLY PLANNING 4/18/2013 Don Lynch.
12/6/20121 PHENIX WEEKLY PLANNING 12/13/12 Don Lynch.
9/5/ PHENIX WEEKLY PLANNING Sep. 5, 2013 Don Lynch.
2/20/ PHENIX WEEKLY PLANNING Feb. 20, 2014 Don Lynch.
9/12/ PHENIX WEEKLY PLANNING Sep. 12, 2013 Don Lynch.
Presentation transcript:

12/5/ PHENIX WEEKLY PLANNING Dec. 5, 2013 Don Lynch

12/5/ This Week (& Last week) Thanksgiving Holiday - Done Move FVTX/VTX to 1008-Done Begin installing services for FVTX/VTX- In Progress CompleteSurvey of FVTX/VTX in IR- In Progress Survey beampipe-Done MPC-Ex magnetic material check out-Analyzed & Done MPC-Ex Install in MMS piston Hole- Done Begin connecting MPC-Ex services- In Progress Continue sPHENIX support-In Progress HCal prototype assembly EMCal prototype assembly Future IR evolution modeling

12/5/ Next Week Finish FVTX/VTX services and cooling Begin VTX & FVTX commissioning Finish Installing MPC-Ex sevices for run 14 Complete MPC-Ex Installation Remove MPC-Ex installation tool Finish MPC-Ex rack assembly Install MPC-Ex rack on MMS MuTrigger rack Install LV cables from MPC-Ex rack Install bias cables from MPC-Ex rack Install control cables from MPC-Ex rack Assemble MPC-Ex FEM’s Install FEM’s Install signal cable to FEM’s Install fiber from MPC-Ex rack to MPC-Ex FEM’s Remove, disassemble and stow station 1 South scaffolding Begin IR & EC prep for move to IR Continue sPHENIX support HCal prototype assembly EMCal prototype assembly Tilting/rotating Support Structure assembly & test Future IR evolution modeling

12/5/ VTX/FVTX FVTX/VTX East & West Installedsurvey in IR, survey to be completed today, ready for commissioning by next week.

12/5/2013 DC East & West Repairs Summary of Tasks DC West broken wire removal – 12/ /30 5

Mechanical installation complete Services in progress Rack assembly & FEM assembly in progress MPC-Ex Initial (Partial) Installation 12/5/2013 6

7 sPHENIX

12/5/ Hi-Bay Prototype Assembly Area sPHENIX prototype electronics rack Hcal assembly in progress Steve Boose’s Tile tester

12/5/ Light Collection for HCal

EMCal Prototype 12/5/ “Droid Army” light collection

12/5/

12/5/

12/5/ EMCal Support

12/5/

12/5/

12/5/

12/5/

12/5/

12/5/

12/5/ sPHENIX Modeling support for updated MIE sPHENIX

12/5/ ePHENIX Plan View Elevation View

12/5/ New Chiller waranty replacement ready for test and installation Low priority complete prior to run 14

12/5/ Shutdown Schedule Prep for 2013 shutdownDone Design, Fabricate MPC-Ex Define tasks and goals Analysis and design of fixtures, tools and procedures Fabricate/procure tools and fixtures Tests, mockups, prototypes Receive, fabricate, modify, finish installables Review and approval of parts, tools, fixtures and procedures Assembly and QA tests VTX Strippixel redesign Done VTX Strippixel 1 st article stave assemblyDone VTX Strippixel 1 st article qualification/performance testsDone VTX Strippixel sensor reclamationDone Run 12 EndsDone Shutdown Standard TasksDone Open wall, disassemble wall, Remove MuID Collars Move EC to AH, etc. VTX/FVTX Post run testsDone Disassemble VTX/FVTX services Done July 4 th HolidayDone Remove VTX/FVTX and transport to Chemistry Lab Done Remove Lampshade MMS, East VerticalDone VTX strippixel stave productionDone Pixel Ladder repairsDone VTX Strippixel ladder assembly & TestDone Assemble and Test Partial MPC-Ex Done Install Partial MPC-Ex In Progress

12/5/ MuTR Troubleshooting, maintenance and repairsDone Summer Sunday (8/4) Prep and teardownDone Summer Sunday (RHIC) Done DC West troubleshooting & RepairsDone DC East Window Upgrade and Related RepairsDone Re-assemble VTX/FVTX halvesDone Test, survey (at Chemistry) Done Install & Survey VTX/FVTX in 1008 IRDone VTX Commissioning12/9/2013-1/31/2014 Other detector maintenance as requiredAs required Infrastructure maintenance as requiredAs required Pre-run commissioning and prep for run 1412/9/2013-1/31/2014 sPHENIX HCal Prototype Assembly/test8/19-12/31/2013 Prep for EC roll in12/9-12/13/2013 Roll in EC12/16-12/20/2013 Prep IR for run12/23-1/3/2013 DC West wire repairs12/15-12/30/2013 Christmas Holiday 12/24-25/2013 New Year’s Day Holiday1/1/2014 Pink/Blue/White sheets12/23-1/10/2014 Start run 142/3/ Shutdown Schedule (Continued)

12/5/ Safety and Security From Ray Karol: 1.Temporary halt to penetration permits (drilling into building structures – floors and walls) 2. Reminder accidents with gov vehicles must be reported immediately to police at x2238, no matter how minor. Also report it to supervisor.

12/5/ Safety and Security Did not receive the injuries and incidents report this week. - S2 (Safety Solutions) Call for proposals. Anyone whop would like to submit a safety improvement proposal, let me know. $20K is available, submission due by 1/14/14.

12/5/ Where To Find PHENIX Engineering Info PHENIX Annual Holiday Dinner next Tuesday night. Reservations due tomorrow.