Cryogenics in SPS & LHC (2 K / 4.5 K) LHC-CC11, 14 November 2011 L. Tavian, CERN, TE-CRG With the contribution of N. Delruelle, G. Ferlin & B. Vullierme.

Slides:



Advertisements
Similar presentations
Status of Cryogenics at point 4 following the power cut L. Tavian 20 August 2011.
Advertisements

Cryogenic system in P4: Possible options S. Claudet & U. Wagner LHC Workshop, “Chamonix XlV” January 2005 (Mostly for RF & beam scrubbing)
February 17-18, 2010 R&D ERL Roberto Than R&D ERL Cryogenics Roberto Than February 17-18, 2010 CRYOGENICS.
Possible Assembly and Test of the Crab cryomodule in SM18 at CERN P. Maesen LHC Crab Cav meeting, 17 Sep’ 09 LHC-CC09Cryomodule Assembly & Test Stand.
ESS Cryogenic System Process Design Philipp Arnold Section Leader Cryogenics CEC – ICMC 2015 June 29, 2015.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
LHC Experimental Areas Forum - 03/07/ ATLAS Helium Cryogenics Nicolas Delruelle on behalf of the AT / ECR group.
Large-capacity Helium refrigeration : from state-of-the-art towards FCC reference solutions Francois Millet – March 2015.
CRYOGENICS AND POWERING
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
FCC Study Kick-off Meeting Cryogenics Laurent Tavian CERN, Technology Department 14 February 2014 Thanks to Ph. Lebrun for fruitful discussions.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Roberto Than CRYOGENICS SYSTEM.
Workshop Chamonix XIV Shortcuts during installation and commissioning: risk and benefit H. Gruehagen, G. Riddone on behalf of the AT/ACR group 18 January.
Introduction to LHC cryogenic system (layout, architecture) Preparation before cool-down (Purge, flushing) Transient operations to reach nominal operating.
2 K cryogenic plant turn-down Two slides from a talk by Laurent Tavian (CERN) Presented at Fermilab (27 Sep 2012) With introduction from Tom Peterson (Fermilab)
Cryogenic update before Fermilab meeting (and after the helium tank review) Coordination meeting 6 th May 2015 K. Brodzinski HiLumi-LHC-CC-Cryo-PPT-18_v1.
S. Claudet - 31st May 2007Power refrigeration for LHC Power refrigeration at 4.5K & 1.8K for the LHC S. Claudet, CERN AT-ACR.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
Cryogenics for crab cavities – SPS/LHC 2 nd HiLumi LHC meeting – Frascati (Italy) 15 November 2012 K. Brodzinski and L. Tavian on behalf of cryogenic team.
CRYOGENICS FOR MLC Cryogenic Principle of the Module Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
Heat loads and cryogenics L.Tavian, D. Delikaris CERN, Cryogenics Group, Technology Department Accelerators & Technology Sector Friday, October 15, 20101HE-LHC'10.
SM18 cryogenics infrastructure upgrade L. Serio TE-CRG.
TE-CRG Activities D. Delikaris, TE-CRG.
Cryogenic Cooling Schemes for the SPL U. Wagner TE-CRG.
Cryogenic scheme, pipes and valves dimensions U.Wagner CERN TE-CRG.
Crab cavities – cryogenics for SPS and LHC LHC-CC13, 6 th LHC Crab Cavity Workshop – CERN, Geneva, Switzerland 9-11 December 2013 K. Brodzinski on behalf.
ILC Cryogenic System Shallow versus Deep Tunnel Tom Peterson Dubna Meeting 5 June 2008.
HIE ISOLDE commissioning of the cryogenic control system installation at CERN. LNL-INFN 22/07/2015 Dr. Marco Pezzetti (CERN )
Project X Workshop - Cryogenics1 Project X CRYOGENICS Arkadiy Klebaner.
5-year operation experience with the 1.8 K refrigeration units of the LHC cryogenic system G. Ferlin, CERN Technology department Presented at CEC 2015.
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
CRYOGENIC SYSTEM of RAON Chul Jin Choi, Ki Woong Lee Cryogenics and Control Team Accelerator Division 5/23/2013 Chul Jin Choi, Ki Woong Lee Cryogenics.
Bruno Vullierme Sept LHC-CC09 - 3rd LHC Crab Cavity Workshop Slide 1 CRAB CAVITY INTEGRATION CRYOGENICS INSTALLATION.
ILC : Type IV Cryomodule Design Meeting Main cryogenic issues, L. Tavian, AT-ACR C ryostat issues, V.Parma, AT-CRI CERN, January 2006.
Energy efficiency considerations in cryogenics Philipp Arnold Section Leader Cryogenics Proton Driver Efficiency Workshop.
FCC Infrastructure & Operation Update on the cryogenics study Laurent Tavian CERN, TE-CRG 28 October 2015.
FCC Refrigeration cost vs magnet temperature Laurent Tavian CERN, ATS-DO 15 February 2016.
TDR Cryogenics Parameters Tom Peterson 28 September 2011.
Crab Cavities SPS cryogenics – progress and requirements Fermilab visit at CERN 02 August 2013 Krzysztof Brodzinski (on behalf of CERN cryogenic team)
Cryogenics and cryolines – Crab Cavities for HiLumi LHC Crab Cavity review November 2015 CERN – Geneva, Switzerland K. Brodzinski, L. Delprat and.
FCC Week 2016, Roma Cryogenics overview Laurent Tavian, CERN, ATS-DO On behalf of the FCC cryogenics study collaboration 14 April 2016.
Cryogenics storage and distribution
Process Simulation for the LCLS-II Cryogenic Systems
Crab cavities Cryogenics progress for the SPS
HL-LHC IT STRING and Series test of SC link
M Chorowski, H Correia Rodrigues, D Delikaris, P Duda, C Haberstroh,
FRIB Cryogenic Support
IT-4189 Supply and installation of a cryogenic distribution system
Innovative He cycle Francois Millet.
N. Hasan1, P. Knudsen2 and V. Ganni2
SPS cryogenic proximity equipment and SM18 validation
BDS Cryogenic System RDR Status and EDR Plans
S. Claudet, Daniel Berkowitz & A. Perin (TE-CRG)
CRYOGENICS – strategy, unavailability root causes and limitations
Hollow e- lens, Cryogenic aspects
Accelerator and Experiment Interface Session: LS2, LS3
CEPC Cryogenic System Jianqin Zhang, Shaopeng Li
on behalf of FCC cryogenic team
CERN Cryomodule Requirements for Crab Cavities
ILC Cryogenic Systems Draft EDR Plan
Cooling aspects for Nb3Sn Inner Triplet quadrupoles and D1
ILC Experimental Hall Cryogenics An Overview
ESR2 Process Cycle Design
Cryogenic management of the LHC Run 2 dynamic heat loads
ESR2 Process Cycle Design
Presentation transcript:

Cryogenics in SPS & LHC (2 K / 4.5 K) LHC-CC11, 14 November 2011 L. Tavian, CERN, TE-CRG With the contribution of N. Delruelle, G. Ferlin & B. Vullierme

Content 4.5 K vs 2 K cryogenics for CC prototype testing – In SPS using an existing TCF20 cryogenic plant – In LHC at Point K vs 2 K cryogenics for the final HL-LHC local scheme – In LHC at Points 1 & 5 Conclusion

Sulzer-Linde TCF20 in BA4 Nicolas Delruelle

Crab-cavity test in SPS 4.5 K cryogenics 2 K Cryogenics Cryolines Thermal shield Pressure relief valves Coupler heat intercept Warm recovery line Subcooling HX VLP heater (~2 kW) He guard Warm pumping unit (1 15 mbar  1500 m 3 /h) JT valve VLP line

Crab-cavity test in SPS Additional specific 2 K equipments Sub cooling heat exchanger 12 kCHF Warm pumping unit (WPU)100 kCHF He guard for pressure relief valves10 kCHF VLP electrical heater20 kCHF JT expansion valve4 kCHF Total additional equipments~150 kCHF To be added to the baseline CtC of ~300 kCHF for cryogenics. Remarks: 1. additional cost for cryostat complexity not included ! 2. if WPU cannot be installed underground, a new VLP line must be integrated in the BA4 shaft (DN100 – 20 kCHF) 3. No specific purifier foreseen for impurity management of the VLP circuit, i.e. lower availability for the 2 K option.

Crab-cavity test in SPS Additional specific 2 K equipments Warm pumping unit to be integrated in BA4 ! Subcooling heat exchanger and JT valve to be integrated in the CC cryostat !

Crab-cavity test in SPS Capacity limitation Crab-cavity 4.5 K (baseline) – Some liquefaction consumption for coupler heat intercepts: ~0.1 g/s of liquefaction – Dynamic RF load : ~ 80 W of 4.5 K – Static heat inleaks (cryostat + transfer lines): ? Crab-cavity 2 K (alternative) – TCF20 cryoplant used in pure liquefaction (TCF20 means 20 l/h = 0.7 g/s of LHe) Coupler heat intercepts: ~0.1 g/s of liquefaction Dynamic RF load: ~12 W i.e. ~0.57 g/s of liquefaction Static heat inleaks (cryostat + transfer lines): ?

TCF20 TS-Diagram S T Guaranteed capacity : 87.5 W

Measured TCF20 refrigeration capacity 120 W available in refrigeration mode ! (+ 35 %) Giorgio Passardi

Working area Capacity limitation (conservative guess) Capacity limitation (entropic equivalence) Crab-cavity test in SPS TCF20 capacity limitation 4.5 K cooling (RF load only) (margin of ~22-30 W for static heat inleaks) (margin of ~ W for static heat inleaks) 2 K cooling (RF load only) Liquefaction capacity measurement mandatory to confirm the 2 K cooling option !

Tentative SPS CC cryogenic schedule Could be in conflict with the LHC LS1, especially if 2 K option is requested ! Compatibility with SPS run in 2012? Transport-up of the cold box to ground level for “easier” refurbishment?

Content 4.5 K vs 2 K cryogenics for CC prototype testing – In SPS using an existing TCF20 cryogenic plant – In LHC at Point K vs 2 K cryogenics for the final HL-LHC local scheme – In LHC at Points 1 & 5 Conclusion

Crab cavity test at Point 4 The global scheme is no longer an option for the final HL-LHC, but a prototype cavity could perhaps be installed in Point 4 first for test purposes. – Basic question: Is LHC a test set-up? Installation of CC prototype could be: – Coupled to the RF cryogenic upgrade at P4 – Scheduled during the LS2 (2018) for possible validation tests during 2019/20/21 (before the LS3 for P1/5 upgrade). 4.5 K operating temperature highly recommended as no 2 K refrigeration is foreseen in the present P4 upgrade. – Additional cooling capacity: ~ K per CC module – Total number of CC modules to be installed : 2 i.e K in total If 2 K cooling mandatory, a new pumping system must be added: – Additional cooling capacity: ~26 2 K per CC module, i.e. 52 W in total – Warm vs cold pumping: Pumping capacity: ~ 3 g/s  Warm pumping probably more dedicated Warm pumping OK for no continuous test (i.e. during MD period) but lower system availability for continuous operation – Extra cost: ~0.5-1 MCHF depending impurity management – Amplified space conflict in the surface compressor building (Already problematic for the 4.5 K option)

Project Process & flow diagram without crab-cavities Gérard Ferlin

P4 upgrade for RF cooling First studies to install a cold box, K into UX45 cavern, above RF electrical cabinet Gérard Ferlin et al

P4 upgrade schedule LS2 (2018): best period for crab-cavity installation LS1 (2013/14): too early & busy for CC installation Too short Decision on CC operating temperature 2 K vs 4.5 K

Content 4.5 K vs 2 K cryogenics for CC prototype testing – In SPS using an existing TCF20 cryogenic plant – In LHC at Point K vs 2 K cryogenics for the final HL-LHC local scheme – In LHC at Points 1 & 5 Conclusion

Crab cavities for the final local scheme Configuration: 2 modules per beam, i.e. 4 per Interaction Points (IP1 & IP5) Installation: during the LS3 (2022) dedicated to the last phase of HL-LHC project Cooling capacity requirements: – 4.5 K cooling: ~170 W per CC module (i.e. 680 W per IP) – 2 K cooling: ~26 W per CC module (i.e. 104 W per IP) Energy consumption consideration: – 4.5 K refrigeration: ~250 W/W, i.e a consumption of 43 kW of electrical power per CC module – 2.0 K refrigeration: ~ W/W, i.e. a consumption of kW of electrical power per CC module – Cooling at 2 K is globally more efficient.

Cooling of CC modules Two possibilities: – Via the 2 new cryoplants dedicated to the new inner triplets at IP1 and IP5 or – Via the 4 existing adjacent-sector cryoplants The choice will depend strongly on: – the operating temperature of the new Inner Triplets (IT): 4.5 K vs 2 K – the total added heat loads

Cooling comparison Operating Temperature [K] Cooling possibility (required added capacity per plant) CCITNew IT plantsExisting sector plants 2 2 Y (104 2 K) Y (52 2 K) 4.5N Y (52 2 K) Y ( K) Y ( K) 4.5 Y ( K) Y ( K) OK but will recreate the same sector cooling unbalance presently existing in S34 and S45 which has justify the P4 upgrade

Preliminary conclusion for the final local scheme If the CC operating temperature is 4.5 K, it is preferable to cool the CC modules using the new IT cryo-plants at P1 and 5: – Better balance in between LHC sector cooling – ~ K (+ contingency) must be added per new cryo-plant If the CC operating temperature is 2 K, existing sector cryo-plants or new IT cryo-plants can be used. – As the CC module will be integrated in the Matching Section (MS), using the sector cryoplant which will cool the MS could simply the cryo-distribution.

Possible configurations 4.5 K CC modules cooled by new IT cryo-plants 2 K CC modules cooled by new IT cryo-plants 2 K CC modules cooled by existing sector cryo-plants

Content 4.5 K vs 2 K cryogenics for CC prototype testing – In SPS using an existing TCF20 cryogenic plant – In LHC at Point K vs 2 K cryogenics for the final HL-LHC local scheme – In LHC at Points 1 & 5 Conclusion

Conclusion Prototype crab-cavity testing in SPS: – Test possible from – 2 K cooling not excluded but: liquefaction capacity of the TCF20 must be measured and sufficient. Additional resources (P + M) must be allocated. – Could be in conflict with the LHC LS1, especially for the 2 K cooling. Prototype crab-cavity testing at LHC P4: – Test possible from – 2 K cooling option expensive (~1 MCHF + 2 FTE + a possible noise- insulated building extension/construction). Series crab-cavities for the final HL-LHC local scheme: – Cryogenic implementation during the LHC LS3 (2022) – 2 K cooling globally more efficient – 2 K cooling via the existing sector cryoplants preferable: Matching section area cooled by the same cryoplant Let open the possibility of simpler new cryoplants at Point 1 and 5 if the new inner triplets are cooled at 4.5 K.