Marcel Vreeswijk (NIKHEF) AGENDA Xray tomograph -BOL0 results (Martin) BOL0 and BOL2 Features (Graziano) Discussion (All) Features and Mysteries of BOL.

Slides:



Advertisements
Similar presentations
Marcel Vreeswijk (NIKHEF) Assembly Station - general Introduction Tube placing + Gluing + test Summary: Status & Plans The.
Advertisements

Technical Committee Orlando, Florida July 25, 2007.
Development of high rate RPCs Lei Xia Argonne National Laboratory.
QXFSM1 Mirror Shim System R. Bossert Dec. 1, 2014 LARP Teleconference.
BML chamber assembly Maria Curatolo LNF/INFN. Maria Curatolo L.N.F. / I.N.F.N. Frascati 21/7/2000ATLAS - MDT Site Review Granite Table Granite table (on.
Projective platforms gluing for ATLAS chambers J.-Ch. Barrière, V. Gautard, P. Ponsot, Y. Reinert, Ph. Schune for the Saclay muon hardware group CEA Saclay.
Marcel Vreeswijk (NIKHEF) The NIKHEF Muon Mission Drift tube wiring Chamber assembly X-ray scan of BOL-0 at CERN Status and Plans The Making of ATLAS Muon.
Status Update on Mechanical Prototype in Rome November 6,
V. Carassiti - Princeton (USA) 9-13/01/ BABAR IFR UPGRADE DETECTOR ASSEMBLING AND MOUNTING.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
Christine KOURKOUMELIS University of Athens ATLAS Muon Chamber construction in Greece and alignment studies for H  ZZ  4μ decay Como, 8/10/03.
QA during Stave Core Assembly Stephanie Qing Yang (Oxford) 25 th Sept 2014 WP4 f2f meeting at RAL.
HFT PXL Mechanical July 2010 Howard Wieman LBNL 1.
Marcel Vreeswijk (NIKHEF) The Assembly of ATLAS Muon 2m 5m5m NIKHEF Muon Mission: 96 Barrel Outer Large (BOL) chambers Tube Production.
SPACE FRAME Interface between the LGT and the IST 21/06/2011 Marco Ciapetti.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
Platform positioning during MDT construction Tool for the platform positioning Ph. Schune J.-Ch. Barrière P RAXIAL A LIGNMENT S YSTEM (barrel) positioning.
NIKHEF ATLAS MUON group: H. vdGraaf, F. Linde, G. Massaro, M
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
20/04/2012Rui De Oliveira1 20/04/2012. Rui De Oliveira2 30 cm x 30 cm example.
Status of CERN M1R2 production LHCb Muon meeting sept.061Thomas Schneider -Beginning of 2006 two visits to Erbicol because of several reasons: -Material.
Malte HildebrandtDC Status Report, Dear MEG Committee,PSI, April 14 th 2009 this is the first report concerning the drift chamber status as.
Precision Drift Chambers for the ATLAS Muon Spectrometer Susanne Mohrdieck Max-Planck-Institut f. Physik, Munich for the ATLAS Muon Collaboration Abstracts:
M. Gilchriese -February 1999 X-Ray Inspection of Flip Chip Assemblies K. Einsweiler, M. Gilchriese and J. Richardson LBNL.
Status Report of activities in LNF Soldering procedure 1.Status of soldering machine 2.Measurement of wire position Chamber prototypes 1.Construction of.
Basic concept The NSW chambers are assemblies of Micromegas monolayers, TGC’s and spacer/stiffeners. In order to simplify the assembly procedures we propose.
T.Schneider/LHCb Muon EDR
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
Status of production at LNF E. Dane, C. Forti, D. Pinci, A. Sarti – LHCb Muon CERN 25-may-04 Monday 24-may: closed chamber 30. Will close 2 more this week.
Specifications for JOOLZ 409- based on the current prototype (as taken by AOK)
BARREL ALIGNMENT PLATFORM POSITIONING Goal: Positioning of the platforms at their nominal position on the MDT chambers (No position measurement in a database).
Marcel Vreeswijk (NIKHEF) Assembly Station - general Introduction Tube Production Tube placing Gluing + test Summary: Status.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
Run13 MUID Hit Efficiency RIKEN/RBRC Itaru Nakagawa 1.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
M. Bianco On behalf of the ATLAS Collaboration
Marcel Vreeswijk (NIKHEF) Introduction The NIKHEF production Three Production Schemes –MPI NOW –MPI FUTURE –NIKHEF CLAMPS Conclusions Appended: photographs.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
Stave C channel side closeout gluing jig S Yang WP4 monthly meeting at Liverpool University 26 th March 2014.
2/4/2001Ludovico Pontecorvo INFN Roma1 Plans for the H8 system test: 2001/2002 Goals for the 2001/2002 Test beam Beam layout Chamber Supports 2001 Schedule.
Marcel Vreeswijk (NIKHEF) B tagging, performance vertexing Neural Net studies tt event selection mass reconstruction in tt events conclusions B tagging.
22/04/20011Wire Chamber Working Group Status on O-ring closed Prototype Foam panels from Frascati (size: 279mm*341mm) No pad structure 4 independent gas.
Analyzing Praxial Platform Positions on MDT Barrel Chambers Using X-Ray Tomograph Measurements Chris Hayward Advisor: Silvia Schuh August 14, 2003 UM CERN.
Precision Drift Chambers for the ATLAS Muon Spectrometer
Atlas Muon Spectrometer: installation and commissioning L. Pontecorvo INFN Roma.
2002 LHC days in Split Sandra Horvat 08 – 12 October, Ruđer Bošković Institute, Zagreb Max-Planck-Institute for Physics, Munich Potential is here...
2007 Oct 21 GEM Panel for LP1 Akimasa Ishikawa (Saga University) For CDC group.
Calibration and production of PRAXIAL (*) sensors for the ATLAS muon spectrometer Optical Metrology - SPIE Optical Measurement Systems for Industrial Inspection.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
Tim Marker Discussion of Burnthrough Test Method for Aircraft Thermal Acoustic Insulation Blankets FAA Technical Center.
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
Proposal for the construction procedures for the NSW chambers Harry van der Graaf, Nikhef Frascati, Nov
Trigger efficicency on double tracks Trigger efficiency on isolated tracks Final results of the Trigger Test on the 25ns beam Bx NUMBER Fraction of Triggers.
Status VELO alignment 1.NIKHEF 3D measurements 2.Photogrammetry 3.Calliper checks in x-direction 4.Photogrammetry again Jo van den Brand May 23, 2006.
Marcel Vreeswijk (NIKHEF) The NIKHEF Muon Mission Chamber assembly Assembly QA Assembly QC Summary, Status and Plans The Assembly of ATLAS Muon chambers.
Pierre-François Giraud, Muon Alignment Meeting1 Status of the barrel alignment system Pierre-François Giraud CERN.
MDT Status Report MDT Status Report G.J. Bobbink NIKHEF30-may-2005.
Update on Pavia MM mechanical prototype
CEA Validation tests and constraints
Production & QA of BOL chambers
Sphere Option for Helical spring CF16 Bellows Adjustment bolts (horizontal plane) CF38.
Overview of the Frascati Production Facilities
Mechanical stability and QXF coil winding
Step IV - Engineering Jason Tarrant – Integration Engineering
Gas Monitoring Chamber Production Status
NEG-coated gun: Black R30 arc at 227kV, white R30 arc at 164 after refurbishing and second bake Carlos Wednesday, August 10, 2018.
Outer Tracker Nominal Position
Presentation transcript:

Marcel Vreeswijk (NIKHEF) AGENDA Xray tomograph -BOL0 results (Martin) BOL0 and BOL2 Features (Graziano) Discussion (All) Features and Mysteries of BOL chambers

Marcel Vreeswijk (NIKHEF) s BOL0 - Hypothesis OBSERVATIONS BOL0 Y-pitch between inner wire-layers: 20um too large Y-Pitch between outer wire-layers: only slightly too large Y-Pitch between multilayers: 75um too small Hypothesis Glue shrimp between tubes and spacer? (2x500um glue gap) --> measured: <5um effect for 1mm gap Xplate deforms during gluing. In particular the flange --> presented todayAdditionally: Re-analysis of BOL0 construction RASNIK readings: ‘cumulative effects’ lead to better agreement!

Marcel Vreeswijk (NIKHEF) Floppy Xplate wrt tubes Away from longbeam =Rotation of unknown relative size Tube direction bends flanges Longbeam constraints body Xplate locally ‘Tube-length’ bends body

Marcel Vreeswijk (NIKHEF) Sag Adjustment s =Rotation of unknown relative size ‘Tube-length’ constraints flanges Tube direction bends flanges Longbeam constraints body Xplate locally Away from longbeam flange bends differently! BOL0 is scanned with sag-adjustment (partially) on! (Longbeam sag is assymetric in BOL0) (Longbeam sag is assymetric in BOL0) When we are optimistic: deformation is symmetric for up/down ML.

Marcel Vreeswijk (NIKHEF) Sag Compensation s =Rotation of unknown relative size ‘Tube-length’ constraints flanges Tube direction bends flanges (temporary) Longbeam constraints body Xplate locally

Marcel Vreeswijk (NIKHEF) s XP deformation For now, BOL2 is still equipped with gauges, located on the inner side of the HV-xplate During BOL2 construction, the flange of the HV xplate was measured with micro-gauges: LBF: Longbeam- Flange BF: Body- Flange

Marcel Vreeswijk (NIKHEF) Gluing BOL-0 Stability Xplates during gluing Start glue Layer 2 Layer 3 Yrasnik=2 x Sag Start glue Layer 1 Layer 1: dSag=7um Layer 2: dSag=10um The sag of the xplates in layer 1 and 2 change in time. Layer 3,4,5,6: Sag stable s

Marcel Vreeswijk (NIKHEF) s Sag Compensation End: -38/2 um Start: -15/2 um Start: 30/2 um End: 50/2 um During gluing of layer 1 and 2, significant changes in xplate sag were observed: In-stable reduction valves? Effect of glue viscosity? Layer 1 Layer 2 1 deg BOL2

Marcel Vreeswijk (NIKHEF) s Conclusions OBSERVATIONS BOL0 Y-pitch between inner wire-layers: 20um to large Y-Pitch between outer wire-layers: only slightly to large: Effects largely explained by RASNIK measurements during construction. Flange deformation of order 10um could be ‘baked’ in. Y-Pitch between multilayers: 75um to small: Flange deformations of this order are certainly observed. However these deformations appear symmetric and elastic. Needs more study -> effects of kinematic mounts direct -in situ- measurement dY of Frascati comb and towers

Marcel Vreeswijk (NIKHEF) s in Tomograph (BOL0) Wire positions RMS 16  m Analysis of Martin Woudstra

Marcel Vreeswijk (NIKHEF) s Parallelogram-ness Checks distance wrt RO side For stability bare spacer “BOL rail RO

Marcel Vreeswijk (NIKHEF) s Landing-Tool Problems with lowering gluing tube layers on tube layers due to glue viscosity Landing tool pre-aligns chamber and ensures flat landing in glue. BOL Tower Effective + Easy

Marcel Vreeswijk (NIKHEF) s Cosmic Ray Stand