LHC Machine Protection System Review LHC Machine Protection System Review Oliver Aberle13 April 2005 with input from R. Assmann and R. Losito Ensuring.

Slides:



Advertisements
Similar presentations
Accessible Manufacturing Equipment Phase 2 Proposal Team 2 Nicholas Neumann Ralph Prewett Jonathan Brouker Li Tian Felix Adisaputra.
Advertisements

H. MAINAUD DURAND, A. HERTY, A. MARIN, M. ACAR PERMANENT MONITORING OF THE LHC LOW BETA TRIPLETS: LATEST RESULTS AND PERSPECTIVES.
T. Bajd, M. Mihelj, J. Lenarčič, A. Stanovnik, M. Munih, Robotics, Springer, 2010 SAFETY IN INDUSTRIAL ROBOTICS R. Kamnik, T. Bajd and M. Mihelj.
RWA, 22/9/2005 Controls for the LHC Collimation System September 22 nd, 2005 Collimator Controls Specification Team (COCOST) started in April 2005 after.
Actuation and Alignment Challenges of LHC Collimators M. Garlaschè on behalf of the EN\MME collimation team 1 st PACMAN Workshop CERN, Geneva, Switzerland.
DCS LEB Workshop ‘98, Rome, Detector Control System, H.J.Burckhart,1 Detector Control System H.J Burckhart, CERN u Motivation and Scope u Detector and.
Technical review on UPS power distribution of the LHC Beam Dumping System (LBDS) Anastasia PATSOULI TE-ABT-EC Proposals for LBDS Powering Improvement 1.
SLAC rotating collimator for HiRadMat beam tests 14 March 2014 S. Redaelli, A. Bertarelli, CERN T. Markiewicz, SLAC US LHC Accelerator Research Program.
LHC Beam Screen Heaters: System overview, consolidation needs and project planning 4 February TE-CRG/JCC (Beam Screen Heater Review) 1.
The First 1 ½ Years of TOTEM Roman Pot Operation at the LHC M. Deile, G. Antchev, I. Atanassov, V. Avati, J. Baechler, K. Eggert, J. Kašpar, F. Lucas Rodriguez,
MECHANICAL DESIGN OF TCSP COLLIMATORS Secondary Collimators Embedding BPMs L. GENTINI, A. Dallocchio, A. Bertarelli, F. Carra, M. Garlasche.
Status of the Roman Pot Movement System and the Interlocks Mario Deile
Changes to IR6 dump protection elements B.Goddard, W.Weterings, C.Maglioni, R.Versaci, T.Antonakakis, R.Schmidt, J.Borburgh, J.Blanco, plus many other.
Proposal for Decisions 2007 Work Baseline M.Jonker for the Cocost* * Collimation Controls Steering Team.
RWA LTC Preliminary results from SPS collimator MDs LTC R. Assmann for the collimation team.
TCDI operation until LS2 LIU-SPS-to-LHC Transfer Line Protection Devices (TCDI) Review 1 Oliver Aberle 26/03/2014 O. Aberle (EN-STI-TCD)
Experimental equipment interacting with beam operation D. Macina TS/LEA Many thanks to my colleagues both from the experiments and the machine for their.
Post Mortem Collimators and Movable Objects Michel Jonker Post Mortem Workshop Cern, 16 & 17 January 2007.
LHC Collimation Project Integration into the control system Michel Jonker External Review of the LHC Collimation Project 1 July 2004.
1 BROOKHAVEN SCIENCE ASSOCIATES Redundancy Requirements for Critical Devices R. Casey August 8, 2007.
TCLDA Design status Collimation Upgrade Specification Meeting L. GENTINI.
Status of LS1 collimator maintenance O. Aberle – 03/03/14 With input from P. Bestmann, S. De Man and J. Lendaro.
A. Bertarelli CERN TS – MME Group 1 CERN European Organization for Nuclear Research Actuating system of the LHC Collimators (Phase 1) Main Features.
L4T Bending Power Converters: ‘ Implications of monitoring the current to 5% and 0.5%’ L4 BCC - 10 Nov 2011 David Nisbet TEEPC.
1 CC & MP - CC10 - CERN Crab LHC J. Wenninger CERN Beams Department for the LHC Machine Protection Panel.
RWA, 4/11/2005 Review Movement & Motorization November 4 th, 2005 Program Introduction & Charge – R. Assmann Mechanical design & SPS results – O. Aberle.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Review of Mechanical Movement and Motorization for LHC Collimators The LHC Collimation project LHC Collimators for Phase 1 Alessandro Bertarelli.
BCT’s for beam protection L. Søby On behalf of D. Belohrad, L. Jensen and P. Odier 6/12/15Internal workshop ON MPP readiness for MJ beams 1.
Updated Design of TCLD whit reduced jaw length Collimation Upgrade Specification meeting L. GENTINI.
Collimator settings for 2012 R. Bruce, R. Assmann for the collimation team
Machine Protection Review, R. Denz, 11-APR Introduction to Magnet Powering and Protection R. Denz, AT-MEL-PM.
A. Bertarelli – A. DallocchioWorkshop on Materials for Collimators and Beam absorbers, 4 th Sept 2007 LHC Collimators (Phase II): What is an ideal material.
Summary of the technical stop activities on collimators (w17, 2012) O. Aberle – 07/05/12.
BEAM INSTRUMENTATION GROUP DEPENDABILITY APPROACH CERN, Chamonix 26th January 2016 William Viganò
Preparation for Circulating Beam - Part II Collimators (40') Oliver Aberle o Breakdown of tests foreseen in preparation for beam o Equipment folder: tests.
LHC machine protection close-out 1 Close-out. LHC machine protection close-out 2 Introduction The problem is obvious: –Magnetic field increase only a.
HB2008 – WG F: 27 Aug. S. Childress – Diagnostics_2MW 1 NuMI Beam Diagnostics and Control Steps to 2 MW S. Childress Fermilab.
Failure Analysis Tools at DESY. M. Bieler, T. Lensch, M. Werner, DESY ARW 2013, Melbourne,
1 SLAC RC Status Report 19 July 2010 LHC Collimation Working Group Meeting Jeff Smith/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
R. Assmann Collimator Functionality, Performance and First View on Set-up and Optimization R. Assmann AB/ABP, CERN External Review of the LHC Collimation.
SNS COLLEGE OF ENGINEERING
Collimator motorization/control SPS/TT40 tests and LHC
News and Introduction from CERN June 15th, 2005
Jaak Lippmaa HIP, Helsinki University
Motor Control Solutions
LARP Phase II Secondary Collimator RC1, ETC - Status 4/10/06
Review on collimator movement with stepping motors
Introduction to JUII⊕Series Machine.
Vacuum System Failures at HERA
1v0.
Joint Meeting SPS Upgrade Study Group and SPS Task Force
Stepper motor.
Planned activities on collimator for LS1
Motor Control Solutions
Review on collimator movement with stepping motors
Interlocking of CNGS (and other high intensity beams) at the SPS
NC and CNC machines and Control Programming
LHC Morning Meeting - G. Arduini
Phase II Collimators : design status
External Review of LHC Collimation Project Oliver Aberle 1th July 2004
IENG 475: Computer-Controlled Manufacturing Systems
Wednesday June 30,  40-S2-A01 (open session)
OLYMPUS Collaboration Meeting Luminosity Monitor Calorimeter
LHC External Collimation Review
IENG 475: Computer-Controlled Manufacturing Systems
Operation of Target Safety System (TSS)
Integration into MP - Considerations -
Motor Control Solutions
Close-out.
Presentation transcript:

LHC Machine Protection System Review LHC Machine Protection System Review Oliver Aberle13 April 2005 with input from R. Assmann and R. Losito Ensuring required collimator settings

LHC Machine Protection System Review Overview Design features Movements Position control Electronics, control and interlocks Summary

LHC Machine Protection System Review Design features Three major design criteria to assure a precise jaw position: Tight tolerances and adapted material choice Movement with small step size Independent position measurement Courtesy of A. Bertarelli and R. Perret

LHC Machine Protection System Review Design features Side view at one end Motor Temperature sensor Gap opening (LVDT) Gap position (LVDT) Resolver Reference Microphonic sensor Vacuum tank + switches for IN, OUT, ANTI-COLLISION Resolver

LHC Machine Protection System Review Design features Two opposite jaws per collimator provides enhanced safety for settings if compared to TEVATRON and RHIC! Position and angle control for jaws. Automatic retraction and play elimination. Independent position read back and end position switches. Independent & direct monitoring of the collimator gap. Survey of temperature, vacuum and shock impact.

LHC Machine Protection System Review Movements Collimators will be moved by Stepper motors: δL is defined by the geometry of the motor That makes “easy” to implement a given ∆L The movement can be implemented in open loop position: - sensors are not necessarily needed - the system is more robust. After a power-cut, or single-event, we need to reset the step counter to a home position

LHC Machine Protection System Review Movements We use 2-phase hybrid motors, 200 step/revolution Angle resolution 1.8°±0.1° 2mm pitch lead screw Pull-out torque sufficiently higher than load And we have: 2mm/200 step = (10 ±0.5) µm !!!! Static Error due to load negligible if pull-out torque >> load torque With Ministep Driver we can do 400, 800, 1600, steps/revolution (5, 2.5, 1.25, 0.75 µm)

LHC Machine Protection System Review Position controls LVDT and Resolvers: Radiation hardness: If the motor survives, the LVDT and the Resolvers can survive. Lifetime: “infinite” since contact less (no mechanical stresses). Resolution is determined by ADC in conditioning electronics. 16 bits on ±40 mm= 1.2µm resolution

LHC Machine Protection System Review Electronics, control and interlock

LHC Machine Protection System Review Interface to interlock system Preliminary thinking. Details being worked out. Collimation control system has several paths to interlock system. Beam dump could be requested if: Jaw temperatures exceed tolerance, abnormal motor and/or sensor status, shock beam impact detected, …. In, out or anti-collision switches are activated. Jaw positions and/or gap deviate from requested value for the considered time (setting function). Depends on tolerance. Monitor with 40  m accuracy. Inconsistency detected between: requested settings and machine mode, energy, … (to be defined). among requested settings (e.g. protection gaps < cleaning gaps). measured orbit and collimator reference orbit (or track orbit with coll.?) Crucial connection to interlock system: Collimator design and extensive monitoring should prevent “wrong” and “unsafe” settings! Increasing complexity

LHC Machine Protection System Review Summary Two jaws per collimator provide important enhancement for safety of collimator setting control. Very tight mechanical tolerances and play minimization with spring system. Stepping motor for precise positioning. Two additional, independent devices for direct measurement of jaw positions and collimator gap (redundancy). Several possible links to interlock system from low through high level controls  control system being attacked now. We feel confident that jaw positions and gaps can be controlled by hardware to significantly better than 100  m during all times (~ 40  m).