Z. Papandreou, GlueX Collaboration Meeting, May 11, 2009 1 BCAL Construction First Article work has begun: crew in place.

Slides:



Advertisements
Similar presentations
TITAN Group …….Managing Site Build up for the telecom sector TICS Telecom Projects Consultancy Pvt. Ltd.
Advertisements

Source Driver Status CMS Week November 2007 P. Debbins University of Iowa.
BCAL: we’re rolling out the barrel and having a barrel of fun! z. papandreou university of regina presented at the GlueX Collaboration Meeting, held at.
Brigham Young University Capstone Program. College of Engineering & Technology Capstone Overview Design Capabilities Examples of Past Capstone Projects.
MICE: Hall Infrastructure Chris Nelson CEng CM15 8 th June 2006.
HCAL-J Status Hadron Calorimeter HCAL-J SBS Collaboration Meeting July, 2014 G. B. Franklin Carnegie Mellon University 7/8/2014 Carnegie Mellon INFN, Catania.
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
1 James M c Intyre. 2 Outline Overview  TAGM Milestones  Documents & Travelers  Personnel Training  Special Training & Hazards Construction Plan 
SHMS Design, Engineering & Construction Status for Hall C Users meeting Paul Brindza January 2010.
Upcoming Review of the Hall D Photon Beam and Tagger Richard Jones, University of Connecticut, for the GlueX collaboration GlueX Collaboration Meeting.
Step IV Infrastructure update STFC Tim Hayler Eddie Holtom Norbert Collomb Graham Stokes 14 th December 2011 MICO170 meeting 1Tim Hayler.
Apr. 16, 2007 Undulator Breakout Dean R. Walters 1 Vacuum System Undulator Vacuum System Dean R. Walters Soon-Hong Lee, James Bailey, James.
EMCAL: project update - Italy - LNF - Frascati Fixture production Module assembly (proto) WLS fibers processing Lead procurement (proto) CT- Catania APD.
Bill Brisiel – Shipping/Receiving Manager Music by Dr. Simon Taylor PHD.
RF Cavity / Coupling Coil Module
Scintillating fibre tracker First SHiP Workshop Zurich, 12 June, 2014 Vladimir SHEVCHENKO, on behalf of Kurchatov Institute SciFi group, Moscow, Russia.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
1. 2 Outline Contract Status  Q.A. plan  construction plan Preparations for construction  populating the construction space Microscope electronics.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
+ STAR HFT Upgrade – Installation and Integration Rahul Sharma Brookhaven National Laboratory.
BCAL R&D GlueX Collaboration Meeting Newport News, Virginia September 9-11, 2004 George Lolos, Zisis Papandreou.
TGC Big wheel Sector assembly plan Tatsuo Kawamoto ATLAS workshop 2005.
Evaluation of Silicon Photomultiplier Arrays for the GlueX Barrel Calorimeter Carl Zorn Radiation Detector & Medical Imaging Group Jefferson Laboratory,
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
WBS1 SBS Basic: Magnet and Infrastructure Robin Wines 11/4/ SBS DOE Review.
ASPERA-3 Apr. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/00 Schedule statused.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
SPARRO Group, University of Regina 1 Barrel Calorimeter Status Quo Zisis Papandreou University of Regina GlueX Collaboration Meeting JLab, December 11-13,
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
Sasha Milov EC/DC meeting March 9, Assembly and testing facility. Sasha Milov March 9, 2005 Sequence of operations Glove Box Evaporator Other needs.
Thomas Jefferson National Accelerator Facility Page 1 SVT – Review January Sensors for the Silicon Vertex Tracker Amrit Yegneswaran.
Tracker Summary Alan Bross MICE CM October 10, 2007.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
Technical Support Activities in PH-ADO-PO
The new set of MWPCs for CB Collaboration Meeting Glasgow March 2006 A. Braghieri, P.Pedroni.
GlueX Detector Review, October 2004 BCAL GlueX Detector Review Newport News, Virginia October 20-22, 2004 George J. Lolos University of Regina.
IoP HEPP Lancaster 31/03 – 02/04/08 Gavin Davies Dr. Athanasios Hatzikoutelis Dr. Laura Kormos Lancaster University T2K UK Collaboration  DS-Ecal Design.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
Project Managers Report CM40 Collaboration Board – Rome Roy Preece 28 th October 2014.
GlueX collaboration meeting, Bloomington, May 9-11, Task list for UConn construction contract 1.order clear light guide fibers from Saint Gobain.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
Z. Papandreou & E. Smith GlueX Collaboration Meeting, Sep. 19/ BCAL Construction & Readout Update Contributions by: SiPMs: K. Janzen, A. Semenov,
The HCAL barrel absorber structure
SBS Magnet and Infrastructure Status Robin Wines July 2015.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory Oxford, UK July 7, 2011 July 7, 2011.
BCAL R&D Rheanne Filby, Blair Jasper, Gergana Koleva, Blaine Langman, Tasha Summers Vitaly Kovaltchouk, George Lolos, Zisis Papandreou GlueX Collaboration.
PIP Update July 29 th Agenda Summary Update – Current Activities – Updates Tom Kubicki (Station 20,21,22 – Gallery and Equipment Work) – Additional.
Preparation for silicon sensor arrival sensor delivery schedule aggressive expect 130 L2-L5 sensors each in July and August sensor lot/batch will likely.
2/20/ PHENIX WEEKLY PLANNING Feb. 20, 2014 Don Lynch.
K.Gadow - DESY 1 The HCAL barrel absorber structure Design Status
Jan , 2008 LCLS Undulator Week Dean R. Walters 1 Vacuum Components Undulator System SH Lee, J Morgan, and D Walters.
Company Overview Founded in 1967 by George Moxlow Current ownership 100% by David & Renee Moxlow David has 50 years with the company - 34 years as president.
HADES collaboration meeting XXX, Lisbon, 7-10 October, 2015,
University of Wisconsin
SciFi option for neutrino target tracker
Status of the PANDA Solenoid Magnet Production in BINP
Apparel management & quality control
X-ray Pump-Probe Instrument
Tagger Microscope Detector & Electronics Status
Company Overview Founded in 1967 by George S. Moxlow
Installation Binder / IRR – an example
Status of the PANDA Solenoid Magnet Production in BINP
HL-LHC upgrade at IPHC news
Magnet, Support and Infrastructure
X-Ray Endstation Systems (XES) 2006 Schedule
SNS-PPU upgrades the existing accelerator structure
Presentation transcript:

Z. Papandreou, GlueX Collaboration Meeting, May 11, BCAL Construction First Article work has begun: crew in place

Z. Papandreou, GlueX Collaboration Meeting, May 11, Teams JLab  Eugene Chudakov, Elton Smith, Tim Whitlach, … Regina  George Lolos, Zisis Papandreou, Dan Kolybaba, Keith Wolbaum, Andrei Semenov, students Alberta  James Pinfold, Jan Soukup, Gilbert Lachat, Richard Soluk Ross Machine Shop  Kevin Lorenz At a glance… Contracts Vendors Fibers: Quality Assurance Mechanical issues Construction preparations Logistics Crew Looking ahead Overview

Z. Papandreou, GlueX Collaboration Meeting, May 11, Construction MOU is done First Article - PO (49th module) Full Contruction - RFP (48 modules) Contracts “The mother of all prototypes”

Z. Papandreou, GlueX Collaboration Meeting, May 11, Timetable First Article Delivery: Oct 2, 2009 First Four Modules: Feb 10, 2010

Z. Papandreou, GlueX Collaboration Meeting, May 11, Fiber Test Preparations Kuraray Contract  SCSF-78MJ; (410cm -0/+4)cm  780,590 fibers; maybe too few? First article tests:  A. Semenov’s talk (next) New Fibers QA protocol  Attenuation length: (a few % of fibers) use photodiode/PMT, measure current use spectrophotometer for select cases setup upgrades: parts; manual scan, eventually automatic  Photoelectrons: 90 Sr; SiPM/PMT, manual scan, auto in future  Anchor back to Kuraray’s results on attenuation length Fiber track

Z. Papandreou, GlueX Collaboration Meeting, May 11, Detector Lab p.e. Module DAQ UV LED fiber coffin SiPM

Z. Papandreou, GlueX Collaboration Meeting, May 11, Construction Preparations Facilities  Construction 1300 ft 2 ; Fiber & Sensor QA 1100 ft 2  Press/Fiber Sorting area: ready  Swaging area: blueprints+safety done, complete on June 1  Detector lab: ready  Underground lab: ready Personnel  Construction Manager: Dan Kolybaba  Undergraduates: Brent Giesbrecht, Shaun Krueger, Lee Sichello (UofR - CoOp), Aimee Heinrichs (UofC), Alana Watson (UofR)  Trainers: Kathryn Janzen, George, Zisis  Fall 2009: CoOp/Engineering Interships - Interviews May 20 Materials  Incidentals: ready  Fibers, Lead, Epoxy: timetables in progress

Z. Papandreou, GlueX Collaboration Meeting, May 11, Construction Space Layout Main Machine Shop Group Office Swaging Press Fibers Dan Optimal Arrangement! Machine Shop Shop storage Loading Dock, Science Stores

Z. Papandreou, GlueX Collaboration Meeting, May 11, Swaging Roller gap adjustments  Short & Long lead strips swaged  Built test matrix samples Lead  Precut to width  Rolled or in sheets  Purity, uniformity,cleanliness  Drop shipped  First Article: using surplus lead; major effort: 2 weeks to just clean & cut Safety  HEPA vacuum for lead clean up; time consuming and disposal  Ventilation, electrical, escape routes wedge gap

Z. Papandreou, GlueX Collaboration Meeting, May 11, Cal Babies Small samples:  Test roller gap  Stack tolerances  Unpopulated grooves Clamp-press  Fiber pitch

Z. Papandreou, GlueX Collaboration Meeting, May 11, Press Frame Located in Edmonton:  Disassembly, strapping  Crating, shipping  Space is ready in Regina Commissioning:  Orientation, leveling, retrofitting (gauges), reactivation  Target date: June 1 Second press will be built after full contract has been signed

Z. Papandreou, GlueX Collaboration Meeting, May 11, Ross Machine Shop “Big Machine”  Levelling-indexing  Polish ends  Taper sides  4 modules at a time “Small machine” Mechanical Liaison  Dan Kolybaba at UofR and Kevin Lorenz at Ross  Cost Quotes  49th Al plates: this week; machine end of May Fac. of Science Shop

Z. Papandreou, GlueX Collaboration Meeting, May 11, Mechanical Issues Regular teleconferences (UofR, JLab, Ross) Engineering drawings that are complete:  Aluminum Base and Inner plate  BCAL wedge drawings  Press frame Other tasks:  Module leveling: done  Lead storage: in progress  Lift-off/Installation?  Transport crates construction 2 ton “Cherry Picker”

Z. Papandreou, GlueX Collaboration Meeting, May 11, Logistics & Paperwork Transportation  Fibers & Lead will be drop shipped to Regina  Regina-Newport News  Quotes received from two companies  Return crates & support beams from NN to Canada? Customs  Vendors are responsible for import to Canada  Regina is responsible export to USA  HST Number ! (48 times the first module) Paperwork  Drawings are complete  Construction MOU is done  Contract for First Article module has been awarded  RFP: Budget for 48 module construction is in progress  Regina is a DOE ‘approved non-domestic sole source’  QA Plan - in progress  Safety documentation - in progress (Dan & Safety Officer)  Student Job ads - ongoing

Z. Papandreou, GlueX Collaboration Meeting, May 11, Summary Lead cutting is underway Swaging starts week of May 19 Awaiting fibers and precut lead Fiber First Article checks and report Awaiting Full Construction Contract We’re rock-and-rolling!