DIL-009 Phasing Plan 4 1 1 1 2 2 3 3 3 TASKS START END CONSTRUCTION (7 weeks) 02/07/11 04/01/11 PHASE 1: BACKROOM AND GROCERY (2 WKS) 2/7/11PM2/18/11AM.

Slides:



Advertisements
Similar presentations
School of Community Education & Training
Advertisements

Energy Efficiency State of the Nation Address
1 Zero Tax Increase Referendum: Community Information Session.
The Greenwood Apartments a partnership between Banc of America Community Development Corporation and Clearwater Neighborhood Housing Services, Inc.
Complete Custom Remodeling For all your remodeling needs All-Wood Cabinets Granite Countertops Laminate Countertops Cabinet Hardware Computer Designs.
Design for Elderly and Disabled Environments:
Planning an athletic facility project for Middle School Kids! Ms. Pauleys 8 th Grade Math – CTMS April 18, 2013.
05/07/12 – 5/13/12 Phase 1 Demolition at West Entry Complete; Drilled Piers and footers Started.
Source One Source One Network and Building Solutions.
A Day in the Life of a Baker A Day in the Life of a Baker.
ENERGY CONSERVATION TIPS Seminar on Energy Efficiency and Conservation (EE&C) for Residential and Academe Sector - An “EARTH HOUR” Pre-Activity.
SUNY Canton Facilities Project Update Miscellaneous.
IN GOD’S HANDS SERVICE CAMP 2013 Attended by Ruth, Barb, Carrie, Gilda, Patty, Martha Karl, Keith, Paul R., Ayars Parker, Kevin, James, Hunter and Chaplain,
DECEMBER 18, 2014 RUSD MAINTENANCE AND OPERATIONS.
Kitchen New sandwich prep table. Kitchen New pizza prep table.
4/30/20151 Universal Design – Remodel Kitchen and Bath Tom Muxie.
MMeet with town to discuss expectations and pre- schedule inspections. Have Permits in hand MMeet with landlord to discuss dumpster & storage locations.
Futureview Solar Solutions Elysburg, Pa. Call
1 Home Department Phasing, Barricades and Panels Key Points Construction areas are always “hidden from the Customer” to protect the shopping experience.
October 2009 Construction Progress. University City School District Bond Wolfe Architects – architect McCarthy Construction – construction manager Barbara.
Hospital Department Renovation Unit Costs Colby Vetter Senior Estimator JE Dunn Construction.
Interior and Exterior Demo Continue Dust Control Measures for Air Quality Management Per LEED Construction Plan 4/16/12 – 4/20/12 Iconic Birdcage Removed.
Remodeling my room From cluttered to clean. My main goals of remodeling my room were… 1.Having a color coordinated theme 2.Organizing all my cluttered.
Receiving, Storage, Inventory
By Berna and Estella Grocery Store. People in the Grocery Store customer Customer service representative cashier.
Commercial Kitchens.
IET 120 CONSTRUCTION PROJECT Name: Clarence Hunt.
A Proposal for the Repurposing of Penfield Hall Prepared By:Chris Crook: Project Manager Matt Baker: Logistics Lead Thomas Quigley: Budget Lead Brittany.
Introduction to a pit installation
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
ALMA PIERCE ELEMENTARY SCHOOL Presented by: Frank Architects Inc. JUNE 26, 2002 DESIGN DEVELOPMENT PHASE.
Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
Week 3. Electrical Code 1. all electrical outlets run off a pigtail from main line 2. Each Circuit is wired directly into circuit panel - no junction.
OH 3-1 Receiving and Storing to Maintain Quality Food Production 3 OH 3-1.
Manager’s Meeting October 21, Agenda Vendor presentations Supervalu –CMAP’s –Slotting –Scandowns –Clip Strip program “Your Turn to Brag” –Meat department.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. August 2007 Prepared by:
Winchester Medical Center Campus Expansion June 21, 2011.
10 Turn off Lights Not in Use Motion Sensors simple ways to go green
BRVFD & RS Training Facility Proposal 05/07/2009.
Vicinity Map Gillis W Long Center, Carville, LA Bldg 15 Stairwell Painting (1 st and 2 nd Floor) September 30, 2015.
Food Safety Risk Management Agency Relations, Nutrition, and Programs
Hogan Residence Basement Bath Addition Valued Repeat Customer Kitchen Remodel (see other presentation) Basement Bathroom Addition Upstairs Bathroom Remodel.
Fire Recovery Facilities –Physics Computing Services is finally able to relocate back into 1301 as of this week. They will probably be completely off of.
Fire Prevention in Your Home 1. National Fire Protection Association “NFPA” In the U.S. – Death every 134 minutes In Canada – Death every 31 hours Roughly.
Salmon River CSD Capital Project Phase II Monthly Status Report March & April 2016.
Store Layout.
FIRE STATION No. 22 Improvement Project Project Budget Expenses.
District of Columbia Public Schools | 1200 First Street, NE | Washington, DC | T | F | dcps.dc.gov Ron Brown Modernization.
Equipment & Utensils Using the Right Tools. Our Goal To provide information about the best selection, use and maintenance of food preparation equipment.
LINDBERGH Chesterfield Mall Chesterfield, MO Prepared by: Rick Zavala Week 10 of 10.
IF YOU ARE PRONED TO SEIZURES DO NOT PLAY THIS GAME. (Seriously don’t)
"This document can not be used without Samsung's authorization"
White Pigeon Community Schools
Light Bulb Changing Procedure
Maria’s Restaurant Appendix A Section 16 HVAC Building Loads
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Assembly And Installation Of Ikea Kitchen Cabinets
Athletic Training Facilities
The Flow of Food: Storage
Chapter 10 Sanitary Facilities and Equipment
Consulting Captains, LLC
CHAPTER 10!!!!!yeAAAAAAAAA Cleaning & Sanitizing
One point Grid Method.
G kitchen What makes you special!
Project 2018 October 31, 2018.
C bathroom/AB and B Kitchens
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
Types of Commercial Refrigerators You Would Come Across There could be a number of reasons with a person behind him investing in commercial freezer rooms.
EAST PENNSBORO AREA SCHOOL DISTRICT
Minuteman Vocational Technical Regional High School Progress
Presentation transcript:

DIL-009 Phasing Plan TASKS START END CONSTRUCTION (7 weeks) 02/07/11 04/01/11 PHASE 1: BACKROOM AND GROCERY (2 WKS) 2/7/11PM2/18/11AM Install R&S Protocols 2/7/11PM2/18/11AM Rework plumbing of dairy drain lines. 2/7/11PM2/8/11AM Replace ceiling tile and clean grid. 2/7/11PM2/11/11AM Grocery reset (Push out north gondola run on wall to install furring) 2/7/11PM2/18/11AM Install ECR room 2/7/11PM2/18/11AM Remodel restrooms on the mezzanine 2/7/11PM2/18/11AM Remove/Install VCT (Will require abatement, floor finishing, and coordinating installation with gondola and drain line installation. VCT will carry over into phase II) 2/7/11PM Install all exterior doors. 2/18/11AM COMPLETED DEPARTMENT TO STORE 2/18/11AM PHASE 2: DAIRY AND PRODUCE (1 WK) 02/21/11PM02/25/11AM Remove 44' of dairy cases 02/21/11PM02/22/11AM Set new 44' of D5 dairy cases 02/21/11PM02/22/11AM Remove dairy cooler (RESTOCK in 44' of dairy cases) 02/22/11PM02/23/11AM Install new dairy cooler and doors 02/22/11PM02/24/11AM Install 24 HOUR epoxy (PROPERLY VENT) 02/23/11PM02/25/11AM Install shelving in dairy cooler 02/25/11PM Install produce prep and sales floor equipment 02/25/11PM Install drain lines for frozen food lineup 02/21/11PM02/25/11PM Complete VCT Installation 02/25/11PM COMPLETED DEPARTMENT TO STORE 02/25/11AM PHASE 3: MEAT, FROZEN DOORS, AND CUSTOMER SERVICE (2 WKS) 02/28/11PM03/11/11AM Remove and Install Meat Cooler 02/28/11PM03/01/11AM Install epoxy floor in meat cooler 03/01/11PM03/03/11AM Relocate 39' of FF doors and Install 26' of Hussmann Doors 02/28/11PM03/02/11AM Build/Finish walls for Customer Service 02/28/11PM03/04/11AM Install 24' of D5 meat cases 03/03/11PM03/04/11AM Set millwork and move into new customer service 03/03/11AM03/04/11AM Remove and install bakery freezer (UTILIZE GROCERY FREEZER FOR TEMP SPACE) (USE SPACE HEATER TO DEFROST WALLS) 03/07/11PM03/10/11AM Install epoxy floor in meat prep SOUTH HALF 03/03/11PM03/04/11PM Install epoxy floor in meat prep NORTH HALF 03/07/11PM03/09/11AM Install equipment in meat prep and turn over to the store. 03/09/11AM03/10/11AM Remove old millwork and complete finishes 03/07/11PM03/09/11AM Remove and Install checkstands 1-3 (VCT under checkstands) 03/07/11PM03/09/11AM Remove and install checkstands 4-5 and Install tobacco corral (VCT under checkstands) 03/09/11PM03/11/11AM COMPLETED DEPARTMENT TO STORE 03/11/11AM PHASE 4: BAKERY and SALES FLOOR (2 WKS) 03/14/11PM03/25/11AM Remove oven, proofer, and change out 3-comp sink 03/14/11AM03/15/11AM Move gas line and install drain lines for oven and proofer 03/14/11PM03/15/11AM Inspect gas and drain lines for oven and proofer (Pour back with hi-early concrete) 03/15/11AM03/15/11PM Build new oven and proofer 03/15/11PM03/16/11AM Burn off new oven 03/16/11AM03/16/11PM Install new epoxy floor (Do not butt up to oven or proofer. Find something slip resistant to install in front of both) 03/16/11PM03/18/11AM Complete finishes 03/18/11AM Touch Up and Punchlist 03/21/11PM03/25/11AM COMPLETED DEPARTMENT TO STORE 03/25/11AM * Turned over to merchandise the morning of that day (Plan inspections accordingly) Department must be 100% complete before moving to the next department