UtilityAMI HAN Task Force July 2, 2007. Agenda Introductions / Background Overview of HAN Framework - 20 minutes California IOU Presentation/Discussion.

Slides:



Advertisements
Similar presentations
UtilityAMI HAN Task Force July 11, Agenda Introductions Review of project timeline and milestones Review of recently approved guiding principles.
Advertisements

Introduction Build and impact metric data provided by the SGIG recipients convey the type and extent of technology deployment, as well as its effect on.
UCAIug HAN SRS v2.0 Summary August 12, Scope of HAN SRS in the NIST conceptual model.
May 2010 Slide 1 SG Communications Boot Camp Matt Gillmore 03/07/11.
Use Cases Utilizing an EMS
© Copyright 2007, Southern California Edison Edison SmartConnect ™ UCA/UtilityAMI OpenHAN Task Force May 10, 2007 © Copyright 2007, Southern California.
© 2006 San Diego Gas & Electric Company. All copyright and trademark rights reserved. Microgrid – A Smart Grid Alternative Service Delivery Model? Thomas.
Home Area Networks …Expect More Mohan Wanchoo Jasmine Systems, Inc.
Vendor Briefing May 26, 2006 AMI Overview & Communications TCM.
OpenHAN Boot Camp July 19, OpenHAN TF Overview Chair Erich W. Gunther, EnerNex – Co-chair Mary Zientara, Reliant Energy -
© 2011 Rainforest Automation, Inc.. 2 ● Rainforest introduction ● Product overview: EMU™, RAVEn™ ● Partner solutions ● Prepay solution ● STB opportunity.
September 30, 2011 OASIS Open Smart Grid Reference Model: Standards Landscape Analysis.
© Copyright 2007, Southern California Edison Edison SmartConnect ™ UCA/UtilityAMI OpenHAN Task Force May 10, 2007 © Copyright 2007, Southern California.
Knoxville, TN October 20, 2009 OpenADE Status and Plans Dave Mollerstuen
Slide 1 UCAIug OpenSG OpenADE Automated Data Exchange Requirements NAESB ESPI Energy Services Provider Interface Standard Specification Overview.
SmartMeter Program Overview Jana Corey Director, Energy Information Network Pacific Gas & Electric Company.
# 1 Information Exchange Standards Development Collaboration for AMI and HAN For further information, contact: Wayne Longcore
Advanced Metering Infrastructure
UtilityAMI HAN Task Force May 10, Agenda SCE Contribution on HAN Vision Technology Discussion Identify TF Deliverables.
Herbert E. Hirschfeld, P.E. and Joseph S. Lopes Applied Energy Group, Inc. Metering America 2005 April 13, 2005 Submetering Case Studies with Load Management.
1WGN Confidential Smart Energy Solutions Overview.
Donny Helm Director – Technology Strategy and Architecture Oncor Electric Delivery November 1, 2012 The Challenges of Establishing A Common AMS View In.
1 Connectivity Week 2010 How Can Standards Be Regulated? Thursday May 27 10:30AM-Noon Zahra Makoui.
White Papers – publication: IEEE PES Transactions – note these papers are not overly technical, may not be appropriate placement. T&D World – good audience.
Consult21 Systems Work Package BT Architecture and eBusiness Derrick Evans 21CN Systems.
1 SmartMeter™ Delivering Customer Benefits Jana Corey Director, Policy Planning Integrated Demand-side Management Pacific Gas and Electric Company.
SMART GRID: Privacy Awareness and Training – Information for Consumers A Starting Point April 2012 SGIP-CSWG Privacy Group 1 DRAFT v8.
McLean VA, May 3, 2010 SG Systems Systems Requirements Specification Approach Overview.
Erich W. Gunther, P.E. Chairman and CTO EnerNex Corporation Chairman UtilityAMI, OpenHAN, CA Title 24 PCT Reference Design Task Force.
Common Devices Used In Computer Networks
Experience you can trust. Knowledge2006 – Technology Roundtable Dan Ruiz
ACM 511 Chapter 2. Communication Communicating the Messages The best approach is to divide the data into smaller, more manageable pieces to send over.
Darren Highfill Chairing on behalf of Erich W. Gunther UtilityAMI Chairman/Facilitator Chairman/CTO – EnerNex Corporation Utility Industry.
Reshaping Utility/ Consumer Relationships MEC October 5, 2010 Pinehurst, NC Penni McLean-Conner.
In-Premise Devices and Grid Interoperability Michel Kohanim Universal Devices, Inc.
CONFIDENTIAL 1. 2 Designing the Intelligent Energy Gateway 2009 CONFIDENTIAL.
Open Smart Grid Subcommittee Organization and Overview Erich W. Gunther UCAIug Board Member.
Communication Architectures for Advanced Metering Infrastructure Home Area Network August 24, 2006.
NETWORKING COMPONENTS AN OVERVIEW OF COMMONLY USED HARDWARE Christopher Johnson LTEC 4550.
CPUC OIR R Submeter Protocol Public Workshop Adrene Briones ECOtality North America October 27, 2011.
Advanced Metering Implementation Team (AMIT) Update to RMS Presented by Christine Wright August 17, 2011
Aug UtilityAMI OpenHAN TF HAN Guiding Principles, Use Cases, System Criteria Requirements Preparation Materials 15 August 2007.
“Best Value/Risk Ratio” The Case for End-to-end Standards Bill Vogel Trilliant Networks, Inc. August 21, 2007.
CEC 08-DR-1 Efficiency Committee Workshop 3/3/08.
Dec UtilityAMI OpenHAN TF Requirements Working Group Specification Briefing January 2008.
June California Investor Owned Utilities (IOU) HAN Guiding Principles Functional Characteristics and System Criteria 2 July 2007.
The Smart Grid: Re-powering America George W. Arnold National Coordinator for Smart Grid Interoperability NIST Gaithersburg, MD April 28, 2010.
IEC TC57 Smart Grid Activities Scott Neumann USNC TA IEC TC57 November 6, 2009.
Timothy Putprush Baltimore, MD September 30, 2009 Federal Emergency Management Agency (FEMA) Integrated Public Alert and Warning System Presentation to.
OpenHAN TF Meeting Where do we go next? Erich W. Gunther.
Erich W. Gunther UtilityAMI Chairman/Facilitator Chairman/CTO – EnerNex Corporation Jerry Melcher Onsite facilitator for this meeting.
UtilityAMI HAN Task Force Erich W. Gunther – Chairman Jan 25, 2008 – Tampa, FL.
Open AMI Network 10/22/08.
OpenHAN SRS v1.95 Overview June 8, OpenHAN SRS v Introduction  OpenHAN area of focus within the NIST conceptual model.
June California Investor Owned Utilities (IOU) HAN vision statement development 15 June 2007.
March 2011 Slide 1 Submission Title: OpenSG San Francisco OpenADE Boot Camp Source: OpenADE Task Force Abstract: SG Systems OpenADE Task Force Boot Camp.
CEC Public Workshop Order Instituting Informational and Rulemaking Proceeding (08-DR-01) March 3, 2008.
Metering Americas April 24, 2006 Advanced Metering.
WHAT IS SO SPECIAL? Wireless Router Analogue Telephone Adaptor + SMCWTVG.
May 2010 Slide 1 SG Communications Boot Camp Matt Gillmore 11/1/2010.
A Smart Metering Scenario Jorge Cuellar, Jan Stijohann, Santiago Suppan Siemens AG.
Jeju, 13 – 16 May 2013Standards for Shared ICT Dr. Farrokh Khatibi Director of Engineering Qualcomm ATIS and the Smart Grid Document No: GSC17-PLEN-63.
SCE Plug-In Electric (PEV) Smart Charging Pilot DRMEC Meeting May 10-11, SCE Internal Use Only.
[WP1] T1.2 User and Business Requirements
DistribuTECH February 2006

California Investor Owned Utilities (IOU)
California Investor Owned Utilities (IOU)
Reference Design for Residential Energy Gateway
Presentation transcript:

UtilityAMI HAN Task Force July 2, 2007

Agenda Introductions / Background Overview of HAN Framework - 20 minutes California IOU Presentation/Discussion on Specific Requirements minutes Other utility presentations / contributions Report on use case development progress General Discussion Lunch - end of general meeting Working meeting to develop use cases and requirements draft documents 3 PM - 5 PM - Energy Technology Center Visit

TF Operating Rules OpenHAN is a TF of the UtilityAMI WG and operates under the same governing rules This is a utility driven activity Members in good standing of the UCA International Users Group which represent a utility are eligible to vote Utility members are permitted to put any issue on the table for discussion or vote Any member may contribute / comment A majority of utility members may vote to table any issue

TF Scope and Deliverables Scope – Requirements for utility applications that utilize a home area network interface implemented in utility owned equipment Assumptions  Technology and platform independent – well defined interfaces  Not addressing any particular regulatory requirements  Non prescriptive – requirements only apply if a utility is implementing a Home Area Network Interface in a meter – if you have a HAN, then these are the requirements Deliverables  Use Cases Tool to generate / validate requirements OpenAMI to maintain  Common Requirements Document To give vendors guidance For other organizations to develop details

Next Steps from Last Meeting Publish CA IOU vision statement Develop OpenHAN comprehensive HAN use cases Develop OpenHAN platform independent requirements Develop UtilityAMI platform independent architectural views for AMI and HAN Continue to share information with technology communities (i.e., vendors, alliances)

Architectural View A: Meter as Gateway Utility Owned Consumer Owned Private Fixed Networks WAN/LAN Meter 2-way T24 PCT RDS/FM or pager broadcast (disabled when utility network operational) 1-way Appliance Sub-meter Display Devices 1.e.g., b, proven mesh LAN protocol, etc. 2-way interval energy time billing start time peak power messages acknowledgements price signals reliability signals RF-TX 1 Third-Party Provider

Architectural View B: Evolution to Multiple Gateway Model Utility Owned Consumer Owned Private Fixed Networks WAN/LAN Any interval meter or pole-top collector PSTN/DSL/Cable/Satellite WAN/LAN 2-way Any gateway (protocol xfr) Special box Internet modem Router Media PC Security panel …….. HAN Protocols ³ Zigbee Z-wave Insteon Wi-Fi EIA709 HomePlug Bluetooth 2-way T24 PCT RDS/FM or pager broadcast 1-way 2-way HAN access using expansion port Sub-meter Appliances Display Devices 1.e.g., b, proven mesh LAN protocol, etc. 2.To be determined 3.Up to 45 active protocols worldwide Broadband TV, music 2-way interval energy time billing start time peak power messages acknowledgements price signals reliability signals RF-TX 1 PLC-TX ² and/or Third-Party Provider 2-way Ron Hofmann 2-way

Architectural View C: 3rd Party Communication Channel/Gateways Only Utility Owned Consumer Owned Private Fixed Networks 2 WAN/LAN Any interval meter PSTN/DSL/Cable/Satellite WAN/LAN 2-way Any gateway (protocol xfr) Special box Internet modem Router Media PC Security panel …….. HAN Protocols ³ Zigbee Z-wave Insteon Wi-Fi EIA709 HomePlug Bluetooth 2-way T24 PCT RDS/FM or pager broadcast 1-way 2-way HAN access using expansion port Other Appliances Display Devices 1.Utility information to/from utility network 2.Up to 45 active protocols worldwide Broadband TV, music 2-way interval energy time billing start time peak power messages acknowledgements price signals reliability signals Third-Party Provider Ron Hofmann utility.com

Utility HAN Framework Based on Strategic Planning and System Engineering Each level provides direction and context for lower level Delineates participation and accountability Can be mapped to GridWise Architecture Framework (Loosely coupled - Decomposition framework vs. organizational interoperability view) Stakeholder considerations at every level: regulators, consumers, utilities, vendors

Use Case Notes from Last Meeting SCE and SDG&E will submit use cases  User to display device interaction scenario – C2, C3 Prepay, service request/info, usage display  AMI system to EMS scenario  Reliability response scenario – D1 No opt-in / opt-out  Price response scenario – C1 Opt-in / opt-out – California -> must be part of a program Override button scenario  HAN management – Derivation of I2 – and Title24 Device provisioning - – initial and update  Security credential establishment Heartbeat, Diagnostics Firmware upgrade – I1  New piece for HAN Customer HAN evolution management  Customer generation scenarios Net metering, EV interface, PV, etc. – V2G  Security threat scenarios – Title 24 work

CA IOU HAN TF Contribution Scope and vision for utility implemented HAN’s

Other Utility Contributions Consumers Energy - Connectivity Scenarios  Case 1 - single PCT, single meter - fairly straightforward model.  Case 2 - two PCTs, single meter - again fairly straightforward and fairly common (I believe Wayne will cite that approximately 40% of homes are dual-zone).  Case 3 - starts to get a little crazy. This model represents more of an urban setting. Homes are close together and there is no guarantee that a specific PCT will talk to a specific meter, or even collector for that matter. The first time that the PCTs for the home presented in the midst of this model are "unified" are back at the MDMS.  Case 4 - this is used to represent a situation where you have a multi-unit building that could have PCTs for each unit and a bank of meters in the basement.

PCT Connectivity Scenarios

Questions Strength of signal connectivity, a given PCT may connect to one gateway today, a different one tomorrow. What problems does this present? If I have tied a PCT to a given meter, what happens when I swap out that meter? Will a given configuration limit what services the utility can offer to a customer and does this create a communication issue? What is the best way to incent consumer behavior? Do they need usage information at the PCT, or is having it at the meter "good enough", with the option to provide detailed information the next day via the web a better alternative? Is information the primary driver, is it money, or is it a combination of both? A usability concern in that consumers will have a "light switch" mentality when it comes to use of ease. They have an expectation that when they flip a switch the light comes on, how to we manage this expectation when connecting, validating, and securing a PCT to "our" network. Some of these questions get complicated if we need to do this "real time" versus a model where price signals (red, yellow, green) are sent to the PCT and more detailed information is presented either on the meter, or via the web the next day, or some greater than "real time" increment

General Discussion How to proceed? What defines completion? Other work  PCT Task Force – Title 24 Profiles  HAN Security Task Force

Working Session Use Case Refinement Document Outline Write the requirements

HAN Use Cases – Updates to SCE/OpenAMI Use Cases C1 - Customer reduces their Usage in response to Pricing or Voluntary Load Reduction Events.  OPENAMI USE CASE: 5 C4 - External Clients use the AMI to interact with devices at Customer Site D1 - Distribution Operations curtails customer load for grid management I1 - Utility installs, provisions and configures the AMI [and Utility HAN] system I3 - Utility Upgrades AMI system to Address Future Requirements