MD 97 (Georgia Avenue) at Randolph Road Purpose Improve vehicular, bicyclists and pedestrian safety Improve Levels of Service Increase capacity Improve.

Slides:



Advertisements
Similar presentations
Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee September 20, 2011.
Advertisements

Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee November 29, 2011.
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Grade Separation Alternative
Alachua County Board of County Commissioners NW 16 th Avenue / NW 23 rd Avenue (NW 57 th Terrace to NW 13 th Street) Alachua County Public Works HDR Engineering.
Maryland Avenue and Arkwright Street Nick Fischer, EIT Ramsey County Jerry Auge, PE Project Manager Ramsey.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County April 2, 2013.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County June 25, 2013.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
Alachua County Board of County Commissioners NW 16 th AVENUE / NW 23 rd AVENUE FROM NW 57 th Terrace to NW 13 th Street.
Titusville to Edgewater Bike Loop PD&E Study
State of Morrisville Mayor Mark Stohlman July 17, 2014.
Route 50 Widening Design/Build Project. 2  Virginia Department of Transportation  Shirley Contracting Company  Dewberry  Fairfax and Loudoun Counties.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
WELCOME! October 28, 2013 ODOT District 1 & District 2.
May 13 th, 2014 City of Akron, Ohio Intersection Safety Study State Route 59 / Main Street / Howard Street.
U.S. 33 Northern Connector Alternative
JANUARY 9, 2002 SCAJAQUADA CORRIDOR STUDY Grant Street to Parkside Avenue City of Buffalo Fisher Associates Joseph Passonneau & Partners In Association.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Dowell Road Widening From South of HG Truman Road To South of Bean Road Calvert County, Maryland.
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
Feasibility Study FOREST GLEN PASSAGEWAY April 10, Isiah Leggett Montgomery County Executive Arthur Holmes, Jr. Director Department of Transportation.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County
August 7, 2013 Luke Lortie, EIT Jerry Auge, PE
U.S. 31 at CR 400 South Roundabout Information Meeting December 18, 2013 Clifty Creek Elementary Columbus, Indiana.
4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
SR 1 BLUFFTON Public Hearing September 25, INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing.
1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Community Development Department Construction Phase.
Town of Cobourg Division Street Improvements Public Information Centre October 1, 2015 Image Courtesy of Google 2015.
Phase 2: 30% Design Plans September 4 th, 2012.
Presentation Outline  Recommendation  Project Background  Public Involvement  Proposed Design  Citizen Comments/Questions  Summary and Recommendation.
April 18, 2013 Luke Lortie, EIT Jerry Auge, PE
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
TEAM Presentation January 21, Overview Top MoDOT Priority Top MoDOT Priority A Funding challenge A Funding challenge Desperately needed Desperately.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
September 15, 2011 Presented by: Clay Harris, PMP - City of Austin Federico Mendoza, PE, PTOE – Brown & Gay Engineers, Inc. Todd Lane Alternative Geometric.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
MED SR 18 Corridor Project MED PID October 13, 2015.
Community Development Department Dimensional Variance In Connection with The Agreement to Convey Property – City Initiated Application # Palm.
I-35W/Highway 62 Crosstown Commons Reconstruction Nathan Aul, Bob Krussow, and Michael Martin.
Girvin Road Improvements (Atlantic Blvd. to Wonderwood Dr.) Public Information Meeting March 3, 2016.
U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET From South of Smith Street To.
Integrity - Competence - Service Hogan Road/Exit 187 Proposed Improvements Public Informational Meeting June 9, 2016.
The I-465 West Leg Reconstruction Project
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Project Status & Right-of-Way Acquisition
Col. Pike Multimodal: About the Project
DICKINSON AVENUE RECONSTRUCTION
River to Sea TPO Meeting US 92/International Speedway Boulevard
Public Information Meeting NW 100th Street Reconstruction Project
IA 122 RECONSTRUCTION PRE-BID MEETING
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Highway 169 Bridge Replacement & Pavement Resurfacing
Changes to Pace Master Campus Plan 1. Pod A Tear down Randall House, build new Lower School building in its place. Add new parking in front. 2.
Issaquah-Fall City Road
SE 12th Street Roadway Improvements February 8, 2005.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Walker Street Reconstruction Project 25% Design Public Hearing
STATE ROAD 61/369 CRAWFORDVILLE HIGHWAY
I Street Bridge Replacement Project
Presentation transcript:

MD 97 (Georgia Avenue) at Randolph Road

Purpose Improve vehicular, bicyclists and pedestrian safety Improve Levels of Service Increase capacity Improve mobility and accessibility for the public

Need Inadequate capacity Safety for motorists, pedestrians and bicyclists Inefficient mobility and accessibility High accident location High Traffic Volumes Montgomery County priority project

Overview Project Costs –Preliminary Engineering - $2.7 M (funded) –Construction - $45.8M (unfunded) –Right-of-Way Acquisition - $23.8 M (unfunded)

Overview Proposed Grade Separation –Limits: MD 97 From Mason Street on the south to MD 182 (Layhill Road) –Approximately 1,900 ft Randolph Road From 300 ft west of Judson Road to 500 ft east of Glenmont Circle –Approximately 2,200 ft

Overview

Proposed Grade Separation: –Randolph Road lowered over 25 ft –ADT: MD ,250 (2025) Randolph Road - 52,000 (2020) –Structures: (1) Structure carrying MD 97 over Randolph Road (4) Retaining Walls

Overview –Major Utility Relocations: PEPCO (Electric) – 69,000 volts Verizon (Communications) – Major Communications and Fiberoptics –Complex Maintenance of Traffic Plan: (7) Stages requiring detours to be built to the South to move traffic from the tunnel footprint –Typical Sections: MD 97 –(3) 11’-0” lanes each direction with turning lanes –5’-0” outside shoulder, variable width median, sidewalks Randolph Road –(2) 11’-0” lanes each way through tunnel –On top eastbound – three lanes- lt, lt/thr,rt –On top westbound – four lanes- two lt, lt/thr,rt –8’-0” Shared off street pedestrian/bicycle path –Sidewalks

Overview

–Profiles: MD 97 raised less than 2 ft above existing grade Randolph Rd depressed approximately 25 ft below existing grade –Design Status: Plans are approximately 65-70% complete Utility Breakout Project - advance construct PEPCO/Verizon (on-going) –(1) Year Design and (2) Year Construction after design is complete –Right of Way Plats have been issued –Permits required: Stormwater Management, ESC, DNR Roadside Tree Permit

Overview

Project Activities and Schedules Location Design Approval – 2002 Preliminary Engineering Begins Milestone Reviews –P.I. Review (30%) - January, 2004 –Semi- Final Review (65%) - November, 2004 –Right of Way Plats issued - January, 2007 –ACTT Workshop September 2007

Major Project Challenges Utility Relocations –PEPCO and Verizon (Require 2 year Construction) Plan of Action: –Relocate utilities from beneath the existing intersection to beneath residential streets Judson Road Sheraton Road

Overview Judson Road Sheraton Road

Major Project Challenges Kensington Volunteer Fire Department (KVFD) –Property is a total take –Replacement site and funding for new facility under negotiations between: Montgomery County KVFD –Prior to taking of the Existing Facility A new site or replacement services at existing locations must be provided prior to condemnation

Major Project Challenges Kensington Volunteer Fire Department

Major Project Challenges Complex Maintenance of Traffic –Highly urbanized and constrained area –Properties tight in all four quadrants –7 Stage MOT including New detour roads to move traffic from footprint of intersection to allow the tunnel structure to be built

Existing Conditions – MD 97 (Georgia Avenue) MD 97 N. of Randolph Rd Looking South MD 97 S. of Randolph Rd Looking North

Existing Conditions – Randolph Road Eastbound Westbound

MD 97 (Georgia Avenue) at Randolph Road QUESTIONS?