ECE 477 Senior Design Group 05  Fall 2004 Paste a photo of team members with completed project here..

Slides:



Advertisements
Similar presentations
Blue Ocean Strategy: Use by Nintendo in the Red Ocean Video Game Industry Daniel Fischbach 13 February 2007.
Advertisements

1 iHome Automation System Home Automation System Team: Million Dollar Contingency Regiment Adam Doehling Chris Manning Ryan Patterson.
ECE 477 Final Presentation Team 03 - Spring 2013 Ryan Pawling Spencer Julian Josh Hunsberger Robert Harris.
ECE 477 Final Presentation Team 6  Spring 2010 Digital Sound Projection.
ECE 477 Final Presentation Team ??  Fall 2013 Paste a photo of team members with completed project here. Annotate this photo with names of team members.
ECE 477 Final Presentation Team 03  Fall Outline Project overviewProject overview Block diagramBlock diagram Design challengesDesign challenges.
Blue Ocean Strategy: Use by Nintendo in the Red Ocean Video Game Industry Daniel Fischbach 13 February 2007.
ECE 477 Design Review Team 19  Spring 2013 Paste a photo of team members here, annotated with names of team members. Calvin Mwesigwa John Marston Noah.
ECE 477 Design Review Team 01  Fall 2013 Paste a photo of team members here, annotated with names of team members.
ECE 477 Design Review Group 14  Spring 2005 Paste a photo of team members here, annotated with names of team members.
ECE 477 Final Presentation Team 16 − Spring 2013 Scott Stack Neil Kumar Jon Roose John Hubberts.
ECE 477 Design Review Team 09  Spring 2010 Luke Ethan Andy Dhruv.
ECE 477 Final Presentation Team 7  Spring 2011 Paste a photo of team members with completed project here. Annotate this photo with names of team members.
ECE 477 Design Review Team 2  Fall Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
Group 8: Video Game Console Team Members: Rich Capone Hong Jin Cho Dave Elliott Ryan Gates.
Treasure Chess ECE 477 Team 2 - Spring 2013 Parul Schroff, Brock Caley, Sidharth Malik, Jeremy Stork Final Presentation Final Packaged Design.
ECE 477 Design Review Group 11  Fall Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 Final Presentation Team 12  Spring 2010 Paste a photo of team members with completed project here. Annotate this photo with names of team members.
ECE 477 Design Review Team 4  Fall 2006 Daryl Dave Will Ben.
ECE 477 Final Presentation Team 14  Spring 2013 Paste a photo of team members with completed project here. Annotate this photo with names of team members.
ECE 477 Design Review Team 1  Fall 2006 Sumanth Peddamatham Alex Tucker Chris Arges Radhika Mulani.
ECE 477 Final Presentation Team 5  Fall 2009 Left to right: Ben, Dennis, Jacqui, Ian.
ECE 477 Final Presentation Team 1  Spring 2012 Paste a photo of team members with completed project here. Annotate this photo with names of team members.
ECE 477 Final Presentation Team 14  Spring 2010.
ECE 477 Senior Design Group 2  Fall Outline Project overviewProject overview Design Challenges FacedDesign Challenges Faced ECE 270/362 knowledge.
ECE 477 Senior Design Group 12  Spring 2006 Daniel da Silva Atandra Burman Eric Aasen Harsha Vangapaty.
ECE 477 Final Presentation Team 18  Spring 2013 Derek Pesyna, Tim Brown, Evan Foote, Doug Wile.
ECE 477 Design Review Team 8(SLOW)  Spring 2006.
ECE 477 Design Review Group 5  Spring Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 Final Presentation Team 01  Spring 2014 Paste a photo of team members with completed project here. Annotate this photo with names of team members.
ECE 477 Design Review Team 7  Spring 2008 Paste a photo of team members here, annotated with names of team members.
Low Power FM Receiver Andrew Young November 17, 2008.
ECE 477 Final Presentation Team 4  Spring Outline Project overviewProject overview Block diagramBlock diagram Design challengesDesign challenges.
ECE 477 Final Presentation Team 2  Spring 2010 Caleb Ayew-ew Josh Long Katie Schremser The Digi-Brush.
ECE 477 Final Presentation Team 3  Fall 2012 Daniel Carolyn Jonathan Mihir Stein McMican Kuntzman Shah.
ECE 477 Senior Design Group 5  Fall 2005 Paste a photo of team members with completed project here..
ECE 477 Design Review Group 9  Fall 2005 Paste a photo of team members here, annotated with names of team members. Tim Miller Clif Barnes Drew Heinrich.
ECE 477 Final Presentation Team 2  Fall 2010 Shannon Abrell Ben Laskowski Andrew Phillips Rob Swanson.
ECE 477 Final Presentation Team 4  Spring 2011 Petra M. Alex B. Alex G. Kim S.
ECE 477 Final Presentation Team 13  Spring 2012 Martin Pendergast, Stephen Edwards, Nick Kwolek, David Duelmler.
ECE 477 Design Review Group 3  Spring 2007 Chase Douglas Isaiah Simpson Casey Gaines Jim Rodovich.
ECE 477 Design Review Team 2  Fall 2006 Wirelessly Integrated Menu System (WIMS) Ryan Coppa Lee Bush Aaron Replogle Neil Bedwell.
Tone Matrix Music Box ECE 477 Senior Design - Group 17 Presenter: Jun Jun Peh.
ECE 477 Design Review Group 5  Spring Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 Design Review Team BOAR  Fall 2011 Paste a photo of team members here, annotated with names of team members. Left to Right:
ECE 477 Design Review Team 1  Spring 2009 Paste a photo of team members here, annotated with names of team members.
ECE 477 Senior Design Group 10  Spring 2006 Jonathan Jared Jennifer Josh.
ECE 477 Final Presentation Team 22  Spring 2013 Paste a photo of team members with completed project here. Annotate this photo with names of team members.
ECE 477 Final Presentation Team 01  Fall Outline Project overviewProject overview Block diagramBlock diagram Design challengesDesign challenges.
ECE 477 Final Presentation Team 13  Spring 2008 Varun Srichand Anvesh Madhu.
ECE 477 Senior Design Group 3  Spring 2005 Paste a photo of team members with completed project here. Annotate this photo with names of team members.
ECE 477 Final Presentation Team 04  Spring 2010
Vision for Robotic Applications
ECE 477 Final Presentation Group 2  Spring 2005
ECE 477 Final Review: Team #
ECE 477 Senior Design Group 3  Fall 2007
ECE 477 Digital Systems Senior Design Project  Spring 2006
ECE 477 Senior Design Group 13  Spring 2007
ECE 477 Final Presentation Group 5  Spring 2005
ECE 477 Final Presentation Team 2 Spring 2012
The Nostalgic 4 ECE 477 Group 5 Peter Salama John Mastarone
ECE 477 Design Review Team 5  Fall 2006
ECE 477 Senior Design Group 11  Spring 2006
ECE 477 Senior Design - Group 17
ECE 477 Final Presentation Team 4  Fall 2010
ECE 477 Senior Design Group 4  Spring 2011
ECE 477 Senior Design Group 5  Spring 2011
ECE 477 Design Review Team ??  Fall 2012
ECE 477 Final Presentation Team 13  Spring 2011
Presentation transcript:

ECE 477 Senior Design Group 05  Fall 2004 Paste a photo of team members with completed project here..

ECE 477 Senior Design Group 05  Fall 2004 Paste a photo of team members with completed project here..

Outline Project overviewProject overview Block diagramBlock diagram Design challenges facedDesign challenges faced ECE 270/362 knowledge usedECE 270/362 knowledge used Project demoProject demo

Project Overview Classic Video Game ConsoleClassic Video Game Console –NTSC Video Output –Video Game –USB Interface –2 Nintendo Controllers Game:Game: –Pong

Project Overview Project Success Criteria: Ability to~Project Success Criteria: Ability to~ –Generate NTSC video output signal –Create and run games –Control game functions via two controllers –Load game code from a USB Memory Stick –Generate sounds synchronized with game functions

Block Diagram Microprocessor USB Interface NTSC Video Output User Interface (Nintendo) 5/3.3 V Power Supply BDM & RS232 Audio Output

Design Challenges Faced ORCAD:ORCAD: –Capture –Layout Timing ConstraintsTiming Constraints Cost ConstraintsCost Constraints Aesthetic ConstraintsAesthetic Constraints Software/Memory ConstraintsSoftware/Memory Constraints

ECE 270/362 Knowledge Used From 270:From 270: –ABEL -> CPLD –Timing considerations –Latches From 362:From 362: –ASM -> Motorola Microprocessor –Port Initializations

Project Demo

Questions / Discussion