How do you do? John Rutherford, Dumfries. Or, are you any good doc? Inputs Qualifications Courses Staffing Equipment Protocols Resuscitation training.

Slides:



Advertisements
Similar presentations
Integra Consult A/S Safety Assessment. Integra Consult A/S SAFETY ASSESSMENT Objective Objective –Demonstrate that an acceptable level of safety will.
Advertisements

Tennessee High School Survey Summary Graphs Percentage of students who: Note: This graph contains weighted results. See the corresponding summary tables.
IIIG LTMS V2 Review. LTMS V2 Review Data Summary: – Includes 285 Chartable reference oil results from all test laboratories – Most recent chartable reference.
Slide 1-1 Copyright © 2004 Pearson Education, Inc. Stats Starts Here Statistics gets a bad rap, and Statistics courses are not necessarily chosen as fun.
Personal Planning System Enterprise Edition The Completing the Monthly Review.
Risk Analysis & Management. Phases Initial Risk Assessment Risk Analysis Risk Management and Mitigation.
Are U.S. Coins Fair? Coins are used to decide disagreements with a flip or spin, to determine the start of a sporting event, coin games involving spinning/flipping,
3.2 Logarithmic Functions and Their Graphs Definition of Logarithmic Function Ex. 3 = log = 8.
ESWL for encrusted stents Shockwave lithotripsy for retained encrusted ureteric stents: a review of 27 cases Introduction Stent encrustation is a common.
Project Quality Management Sections of this presentation were adapted from A Guide to the Project Management Body of Knowledge 4 th Edition, Project Management.
Systems of Distributed Systems Module 2 -Distributed algorithms Teaching unit 3 – Advanced algorithms Ernesto Damiani University of Bozen Lesson 6 – Two.
Ideal, monatomic gas goes around the cycle shown. Is this an engine or a fridge? A] engine B] fridge.
SYSTEM TESTING AND DEPLOYMENT
CISB444 - Strategic Information Systems Planning
Copyright © 2015 Pearson Education, Inc. All Rights Reserved Balanced Scorecard: Quality, and Time.
GROUP LOG OF DAILY DIGITAL MEDIA USE AMOUNT AND PERCENTAGE.
Survey Design Training OFFICE OF PLANNING, RESEARCH & INSTITUTIONAL EFFECTIVENESS CAÑADA COLLEGE.
Event Trees Quantitative Risk Analysis. Event Trees - Overview Definitions Steps Occurrence frequency Mean Time between Shutdown Mean Time Between Runaway.
For midterm. Topics to be covered  Repeat Analysis  Analysis Of Reject Versus Repeated Films  Determination Of Rejection Rate  Distribution Of Rejected.
Event Viewer Was of getting to event viewer Go to –Start –Control Panel, –Administrative Tools –Event Viewer Go to –Start.
© 2012 Pearson Prentice Hall. All rights reserved. Balanced Scorecard: Quality, Time, and the Theory of Constraints.
The Natural logarithm and e
1 Logarithms Definition If y = a x then x = log a y For log 10 x use the log button. For log e x use the ln button.
Cumulative Sum (CUSUM) charts for medical student peripheral venous cannulation; development of a difficulty-adjusted CUSUM Dr Harry Murgatroyd SpR Anaesthesia.
Questionnaires and Interviews
Overview of Total Quality Tools
© 2012 Pearson Prentice Hall. All rights reserved. Balanced Scorecard: Quality and Time —modified by CB.
QAPI What Medicare Really Wants? Presented to: Region 7 Presented on: February 13, 2015 Presented by: Gwen McNatt.
Equipment Management Audience – Local lab responsibilities.
The project VocTrainMaint’s way to to develop a new education and training for the Practical Working Maintenance Technician to be a link in: World Class.
DOCUMENTATION Research Data Management. Research Data Management Lab Books Why keep a Lab Book? Records are important for development and writing up of.
What do we know about overall trends in patient safety in the USA? Patrick S. Romano, MD MPH Professor of Medicine and Pediatrics University of California,
© 2012 Pearson Prentice Hall. All rights reserved. Balanced Scorecard: Quality and Time —modified by CB.
a) y = 3 x b) y = -3 x c) y = (1/2) x d) y = -(1/2) x.
 decimals/cc-7th-fracs-to-decimals/v/converting-fractions-to-decimals-example.
Statistical Process Control Chapter 6, Part 2 Specification Limits The target for a process is the ideal value –Example: if the amount of beverage in a.
Lean Six Sigma An Introduction to Process Improvement.
Chapter 15 Basic Statistics. §15.1 thru 15.4 – Graphs Bar graphs – Example 1 p. 483 – Problems 15.1 #18, 20, 22 (p. 483) Circle graphs – Figure 15.2 p.
New Student Registration. Presentation Overview Degree Requirements Course Sequencing Using the Online Schedule of Classes Course Registration Registration.
Step What happens?. Who is responsible? Procedures needed?
Nov 28, 2013 Power Converters Availability for post-LS1 LHC TE-EPC-CCE.
THE COMMONWEALTH FUND Figure 1. Only 28 Percent of U.S. Primary Care Physicians Have Electronic Medical Records; Only 19 Percent Have Advanced IT Capacity.
Minimizing interviewer effects and reducing refusal rates at Statistics Iceland Anton Örn Karlsson.
Meet Meetings with a purpose.. Meet: The Team Derin D. Dartis W. Lorena H.L. Peter W. Engineering UX/UI PM Engineering.
Normal Distribution Learning about.... introduction what is distribution? the distribution of a data set is the description of how the data is spread.
Lean Six Sigma: Process Improvement Tools and Techniques Donna C. Summers © 2011 Pearson Higher Education, Upper Saddle River, NJ All Rights Reserved.
The Natural logarithm and e
To the ETS – Accounts Setup and Preferences Online Training Course
Commercial Vehicle Drivers Hours of Service
ITPD ISSUE MANAGEMENT PROCESS SEPTEMBER 5, 2008
Inferential Statistics:
Tips Need to Consider When Organizing a College Event
Ageing Management Session Name: Principles of Ageing Management
Conduct of Film Analysis
ريكاوري (بازگشت به حالت اوليه)
Olympic Records Can you deduce which event Graph 1 represents?
Design Controls and Production & Process Controls
ماجستير إدارة المعارض من بريطانيا
Total Productive Maintenance © Imants
Managing Motor Fleet Safety Programs: Training for the Safety Director
Project Quality Management
Proposed PAR and 5 Criteria for High Throughput Task Group
Benjamin W. Starnes, MD, Michael T. Caps, MD, Zachary M
Local Control Accountability Plan Committee Meeting
Cumulative sum failure analysis for eight surgeons performing minimally invasive direct coronary artery bypass  David M. Holzhey, MD, Stephan Jacobs,
CRITICAL CARE NURSES CHAPTER----QUALITY IN CRITICAL CARE.
Module 9 Staff Training and Capacity Development
Line Graphs.
Types of Errors And Error Analysis.
Comments on Cost of Prediction Error (or Value of Perfect Information)
Presentation transcript:

How do you do? John Rutherford, Dumfries

Or, are you any good doc? Inputs Qualifications Courses Staffing Equipment Protocols Resuscitation training Outcomes Mortality Complications Logbooks Success at techniques Satisfaction surveys

Success at techniques You can record a yes/no for some events Intubated or unable, caudal inserted or not This can give a percentage result We cannot be perfect How much failure is acceptable?

Cusum Statistical technique Move along graph to right each time you do a technique Move up if fail Move down if succeed Upper and lower limits depend on acceptable and unacceptable failure rates

The technical bits… p 0 acceptable failure rate p 1 unacceptable failure rate  type 1 error  type 2 error ln, log e h0= -b/(P+Q) H1= -a/(P+Q) a = ln[(1-  )/  ] b = ln[(1-  )/  ] P = ln[p 1 /p 0 ] Q = ln[(1-p 0 )/(1-p 1 )] s = Q/(P+Q)