Computer Science and Instrumentation Research Opportunities at CLS Johannes M. Vogt Canadian Light Source University of Saskatchewan 2001-10-20.

Slides:



Advertisements
Similar presentations
Mark Heron Diamond Light Source Oct 2007 EPICS EPICS Interface to the Libera Electron Beam Position Monitor.
Advertisements

Tachometers – An Overview
Measurements on phase stability at CTF3 Giulio Morpurgo / CERN IWLC 2010.
University of Kansas A KTEC Center of Excellence 1 Victor S. Frost Director, Information & Telecommunication Technology Center Dan F. Servey Distinguished.
Study of Data Acquisition System and Data Loggers
Distributed Control Systems Emad Ali Chemical Engineering Department King SAUD University.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Stability Workshop April , 2007 NSLS-II Electrical Systems G. Ganetis NSLS-II Electrical Systems NSLS-II.
Elder Matias Canadian Light Source University of Saskatchewan CLS – Control System Overview.
Power Supply Controller Architecture
AWAKE RF Synchronization and LLRF Budget Review Reported by Wolfgang Hofle Acknowledgement: A. Butterworth, H. Damerau, S. Doebbert, J. Molendijk, S. Rey.
1 Chapter Two Electrical & Computer Engineering Specialization.
Berliner Elektronenspeicherringgesellschaft für Synchrotronstrahlung mbH (BESSY) Accelerator and Experiment Control and Monitor Systems Ralph Lange BESSY,
Beam Instrumentation for Orbit Stability I. Pinayev.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
Computer Networks. Why Create Networks? Communication Communication technologies such as , sms, video-conference can be used Makes communication.
Dec 8-10, 2004EPICS Collaboration Meeting – Tokai, Japan MicroIOC: A Simple Robust Platform for Integrating Devices Mark Pleško
CLS Machine Protection and PLC Hardware Presentation to Beamlines Group Elder Matias Canadian Light Source University of Saskatchewan October 20, 2001.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Meeting Summary Richard.
TEI of Piraeus – Dept. of Electronics Eng. Sensors & Optoelectronics Group & IMEL Collaboration in SENSORS-I Pressure Sensor Fabrication – Read-out Electronics.
Orbit Control For Diamond Light Source Ian Martin Joint Accelerator Workshop Rutherford Appleton Laboratory28 th -29 th April 2004.
CLS Control System Progress Report Elder Matias Canadian Light Source University of Saskatchewan Saskatoon Saskatchewan.
The design of HEPS digital BPM electronics BI Group, accelerator division.
ATF Control System and Interface to sub-systems Nobuhiro Terunuma, KEK 21/Nov/2007.
Instrumentation at CLS (Presentation to Saskatchewan Instrumentation Society Executive) Elder Matias Canadian Light Source University of Saskatchewan
Prediction W. Buchmueller (DESY) arXiv:hep-ph/ (1999)
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
SNS Integrated Control System Timing Clients at SNS DH Thompson Epics Spring 2003.
1 BROOKHAVEN SCIENCE ASSOCIATES Integrated Testing George Ganetis Integrated Testing ASAC Review October 14-15, 2010.
Beam Tests of 3D Vertically Interconnected Prototypes Matthew Jones (Purdue University) Grzegorz Deptuch, Scott Holm, Ryan Rivera, Lorenzo Uplegger (FNAL)
The Main Injector Beam Position Monitor Front-End Software Luciano Piccoli, Stephen Foulkes, Margaret Votava and Charles Briegel Fermi National Accelerator.
Booster Top-off Computer Controls System C. Timossi November 22, 2004.
1 BROOKHAVEN SCIENCE ASSOCIATES Stability Issues NSLS-II PAC Meeting May 24, 2007 S. Krinsky.
Jørgen S. Nielsen Institute for Storage Ring Facilities (ISA) Aarhus University Denmark 1 ESLS-RF 14 (29-30/9 2010), ASTRID and ASTRID2 new LLRF.
FONT Hardware Processing electronics and current beam tests Stephen Molloy Queen Mary, University of London.
Berkeley Nucleonics Instrumentation Since 1963…. Management Team David Brown, President 15 Years, BA Management Mel Brown, Director of Finance 45 Years,
A real-time software backend for the GMRT : towards hybrid backends CASPER meeting Capetown 30th September 2009 Collaborators : Jayanta Roy (NCRA) Yashwant.
Real time performance estimates of the LHC BPM and BLM system SL/BI.
BEPC II TIMING SYSTEM EPICS Seminar Presented by Ma zhenhan IHEP 20.August 2002.
GAN: remote operation of accelerator diagnosis systems Matthias Werner, DESY MDI.
KM 3 Neutrino Telescope European deep-sea research infrastructure DANS – symposium Maarten de Jong.
On-line Sorting Technologies for CCA Treated Wood Sarasota Team Meeting June 5, 2001.
Magnetic Field Stability Measurements Joe DiMarco 23Oct07.
BPM stripline acquisition in CLEX Sébastien Vilalte.
1 Fast kicker study Machine Time 2011/10/18~10/29(2 weeks) TB meeting 2011/01/14 T.Naito.
Context of CERN-LAPP collaboration HS,
U. Raich CERN Accelerator School on Digital Signal Processing Sigtuna Digital Signal processing in Beam Diagnostics Lecture 1 Ulrich Raich CERN.
IoP HEPP/APP annual meeting 2010 Feedback on Nanosecond Timescales: maintaining luminosity at future linear colliders Ben Constance John Adams Institute,
Experience with Novosibirsk FEL Getmanov Yaroslav Budker INP, Russia Dec. 2012, Berlin, Germany Unwanted Beam Workshop.
Programmable Logic Controller & Distributed Control System Yoon-Je Choi 17 th June 2006.
1 BROOKHAVEN SCIENCE ASSOCIATES Beam Stability Overview NSLS-II CFAC Meeting May 8, 2007 S. Krinsky.
Fast Global Orbit Feedback for the Australian Synchrotron Eugene Tan Accelerator and Operations 13/12/20101 ACAS Workshop on Accelerator Feedback Systems.
Beam Instrumentation of CEPC Yue Junhui (岳军会) for the BI Group Accelerator Center, IHEP HF2014.
SCADA Supervisory Control And Data Acquisition Pantech Solutions Here is the key to learn more.
Operations Machine Simulator.
BaBar Transition: Computing/Monitoring
RF acceleration and transverse damper systems
Dither Luminosity feedback versus Fast IP feedback
Instrumentation for Accelerators Technologies for the HL-LHC
Orbit Control For Diamond Light Source
SNS Status Report Karen S. White 10/15/08.
A slow control system for a
PLC-based control systems at SOLEIL - ICALEPCS 2017
SLC-Aware IOC LCLS Collaboration Jan 26, 2005
ATF/ATF2 Control System
SLS Timing Master Timo Korhonen, PSI.
Enrico Gamberini, Giovanna Lehmann Miotto, Roland Sipos
Remote Operations and Online Processing
Development of built-in diagnostics in the RADE framework (EN2746)
GlueX Electronics Review Jefferson Lab July 23-24, 2003
Red Pitaya with EPICS Andraz Pozar EPICS Collaboration Meeting
Presentation transcript:

Computer Science and Instrumentation Research Opportunities at CLS Johannes M. Vogt Canadian Light Source University of Saskatchewan

CLS Control System More than 100 computers Mix of technologies (including industrial control hardware and scientific data acquisition hardware) Software based on a system called EPICS that was originally developed for Star Wars. Today EPICS is used to control accelerator facilities and radio telescopes.

CLS Control System (cont.) The computer hardware is interconnected over a mix of Ethernet and Profibus. The control system measures and controls several thousand signals, e.g., –Position of the beam in the storage ring to within 1  m –Magnet set points and feedback values –Temperature sensors, valves, flow switches... All of this data is acquired and logged in real-time. Grad student opportunities exist in data networking, data-base system design, data acquisition software, software for data analysis and display.

Transition Radiation Monitors Non-destructive method of obtaining beam profile information A thin aluminized Mylar foil is moved into the beam Transition radiation is produced as the beam passes through the foil We are working on capturing a video image of the beam, determining the position and shape of the beam and then readjusting steering elements in the accelerator. Grad student opportunities exist in image processing, feedback algorithms, statistical analysis of video images and pattern recognition.

Transition Radiation Monitors (cont.)

Orbit Correction System The beam orbit in the storage ring must be maintained within 1  m and the orbit corrected at approx. 100 Hz. The position of the beam is monitored to within 1  m at 56 monitor stations within the storage ring. Orbit corrector magnets are used to correct the beam position. Grad student research opportunities exist in control theory and implementation of the control algorithm.

Vibration Monitor Position of the experiment stable to 1  m? Internal Vibration Sources –Pumps, compressors, fans... –Ramping of the booster –Crane, forklift, people walking... External Vibration Sources –Trucks, trains, planes –Wind on building walls –Ocean surf ? Separate concrete slabs for building, booster, storage ring/ beamlines. How well do the isolation joints in the floor isolate the slabs?

Vibration Monitor (cont.) A portable vibration monitoring system was developed to measure building vibration and displacement. Custom software to acquire the data and analyse the data is under development. Building vibration studies were done in collaboration with the College of Engineering. Grad student opportunities exist in building vibration research.

Vibration Monitor (cont.) Accelerometer SCXI-1531PXI-6052E PXI-1010 Mainframe Accelerometer SCXI-1531PXI-6052E PXI-1010 Mainframe PXI-PCI 8335 MXI-3 with fiber cable, up to 200 m long Computer SCXI-1349

Vibration Monitor (cont.) Acceleration [μm/s ] 06Time [s] Time [s] Displacement [μm] Acceleration Spectrum [μm/s ] Frequency [Hz]

Electronics Policy: Buy if possible, develop only specialized circuits that are not available off-the-shelf Design, develop, prototype, build small quantities, then contract out or transfer technology CLS has developed: High speed digital electronics (500 MHz, ECL) A fibre-optic system for the distribution of trigger pulses (3  -jitter less than 50 ps) A high voltage circuit that switches 1.8 kV in about 250 ps, triggered by a fibre-optic signal

Electronics (cont.) Need a fast Beam Position Monitor for turn-by- turn readout. Two systems are available commercially: One of them does not work (for us) One of them may satisfy requirements, but is prohibitively expensive Grad student R&D opportunity exists for the development of fast Beam Position Monitor electronics.

Summary Possible Research Areas: Control System – Control theory, implementation of control/ feedback algorithms Data Processing – Data networking, data-base system design, data acquisition software, software for data analysis and display, image processing, pattern recognition. Building Vibration Studies – Measure, analyze Electronics – Fast Beam Position Monitor for turn- by-turn readout